MONTHYEAR05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications IR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip 05000315/LER-2023-002, Failure of Unit 1 West Auxiliary Feedwater Pump to Restart During Load Sequencer Testing2023-12-12012 December 2023 Failure of Unit 1 West Auxiliary Feedwater Pump to Restart During Load Sequencer Testing 05000315/LER-2023-001, Two Trains of Fuel Handling Area Exhaust Ventilation Inoperable2023-09-28028 September 2023 Two Trains of Fuel Handling Area Exhaust Ventilation Inoperable 05000315/LER-2022-003-01, Automatic Trip on Losss of Flow Due to Reactor Coolant Pump Trip2023-02-22022 February 2023 Automatic Trip on Losss of Flow Due to Reactor Coolant Pump Trip 05000316/LER-2022-001, Automatic Reactor Trip Due to Steam Generator High-High Level2023-01-0404 January 2023 Automatic Reactor Trip Due to Steam Generator High-High Level 05000315/LER-2022-003, Automatic Reactor Trip on Loss of Flow Due to Reactor Coolant Pump Trip2022-10-19019 October 2022 Automatic Reactor Trip on Loss of Flow Due to Reactor Coolant Pump Trip 05000315/LER-2022-002, Ice Condenser Door Inoperable Resulting in a Condition Prohibited by Technical Specifications2022-09-20020 September 2022 Ice Condenser Door Inoperable Resulting in a Condition Prohibited by Technical Specifications 05000315/LER-2022-001, Manual Reactor Trio Following Manual Turbine Trio Due to High Vibrations on Main Turbine2022-07-21021 July 2022 Manual Reactor Trio Following Manual Turbine Trio Due to High Vibrations on Main Turbine 05000316/LER-2021-002, Re Manual Reactor Trip Due to an Unisolable Steam Leak2021-08-18018 August 2021 Re Manual Reactor Trip Due to an Unisolable Steam Leak 05000315/LER-2021-001, Main Steam Safety Valve Setpoints Found Outside Technical Specifications Limits2021-06-10010 June 2021 Main Steam Safety Valve Setpoints Found Outside Technical Specifications Limits 05000316/LER-2020-004-01, Regarding Unit 2 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level2021-02-25025 February 2021 Regarding Unit 2 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level 05000316/LER-2020-004, Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level2020-12-0909 December 2020 Automatic Reactor Trip on Low-Low 24 Steam Generator Water Level 05000315/LER-2020-001, Containment Closure Requirements Not Met During Refueling Operations2020-12-0909 December 2020 Containment Closure Requirements Not Met During Refueling Operations 05000316/LER-2020-003, Manual Reactor Trip and Automatic Safety Injection Due to Failed Open Pressurizer Spray Valve2020-11-0202 November 2020 Manual Reactor Trip and Automatic Safety Injection Due to Failed Open Pressurizer Spray Valve 05000316/LER-2017-0012017-05-19019 May 2017 1 OF 5, LER 17-001-00 for Cook, Unit 2 re Containment Hydrogen Skimmer Ventilation Fan #1 Inoperable Longer than Allowed by Technical Specifications 05000316/LER-2016-0022017-02-0909 February 2017 Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue, LER 16-002-00 for Donald C. Cook Nuclear Plant Unit 2 Regarding Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue 05000316/LER-2016-0012016-08-31031 August 2016 Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure, LER 16-001-00 for Donald C. Cook Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure ML16193A3902016-07-15015 July 2016 Donald C. Cook Nuclear Plant Unit 2 - A Loss of Main Condenser Event Occurred Due to a Storm-Induced Debris Damage of the Circulating Water System Pumps in the Forebay (LER-316-2014-003-00) 05000315/LER-2015-0022016-01-18018 January 2016 -Technical Specification Violation due to Inoperable Residual. Heat Removal Pump, LER 15-002-01 for D.C. Cook, Unit 1, Regarding Technical Specification Violation Due to Inoperable Residual Heat Removal Pump 05000316/LER-2015-0012016-01-15015 January 2016 Manual Reactor Trip Due To A Secondary Plant Transient, LER 15-001-01 for D.C. Cook, Unit 2, Regarding Manual Reactor Trip Due to a Secondary Plant Transient ML0528703602005-10-0505 October 2005 Special Report for D. C. Cook Unit 2 Re Unit 2 Reactor Coolant Inventory Tracking System ML0508903452005-03-22022 March 2005 LER 99-001-01 Donald C. Cook Nuclear Plant Unit 2, Regarding Supplemental LER for Degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations ML0210601432002-04-12012 April 2002 LER 02-02-00, Donald C. Cook Nuclear Plant Unit 2, Technical Specification 3.9.4.c Was Violated During Core Alteration ML0209205342002-03-15015 March 2002 LER 99-012-01 for Cook Nuclear Plant, Unit 1 Re Auxiliary Building ESF Ventilation System May Not Be Capable of Maintaining ESF Room Temperature Post-Accident ML9936300511999-12-20020 December 1999 LER 99-S004-00, Intentionally Falsifying Documentation Results in Unauthorized Unescorted Access, on 11/18/99. with Letter Dated 12/20/99 05000315/LER-1999-027, LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination1999-11-29029 November 1999 LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination ML18219B5201978-09-27027 September 1978 09/27/1978 Letter Enclosure of Licensee Event Report ML18219E1521978-09-27027 September 1978 Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0 ML18219B5211978-09-19019 September 1978 09/19/1978 Letter Enclosure of Licensee Event Report ML18219B5541978-09-18018 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-062/03L-0) ML18219E1531978-09-18018 September 1978 Submit Licensee Event Report No. RO 78-050/03L-0 ML18219B5551978-09-12012 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-56/03L-1 and RO 78-061/03L-0) ML18219E1541978-09-12012 September 1978 Submit Licensee Event Report No. RO 78-049/03L-0 ML18219B5561978-09-0808 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-059/03L-1 and RO 78-060/03L-0) ML18219E1551978-09-0808 September 1978 Submit Licensee Event Report No. RO 78-048/03L-0 ML18219B5571978-09-0505 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting License Event Report RO 78-059/03L-0 ML18219B5581978-08-30030 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report RO 78-058/03L-0 ML18219B5621978-08-22022 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-056/03L-0 and RO 78-057/03L-0) ML18219B5611978-08-18018 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-052/03L-0, RO 78-053/03L-0, RO 78-054-03L-0 and RO 78-055/03L-0) ML18219E1561978-08-15015 August 1978 Submit Licensee Event Report No. RO 78-047/03L-0 ML18219E1581978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-043/03L-1 & RO 78-044/03L-1 ML18219E1571978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0 ML18219E1601978-08-11011 August 1978 Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L ML18219B5641978-08-10010 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-051/03L-0) ML18219B5651978-08-0909 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-1) ML18219B5661978-08-0808 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-050/03L-0) 2024-09-12
[Table view] |
text
INDIANA MICHIGAN POWER.
An AEP Company BOUNDLESS ENERGY-November 11, 2024 Docket No.: 50-316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Donald C. Cook Nuclear Plant Unit 2 LICENSEE EVENT REPORT 316/2024-004-00 Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 indianamichiganpower.com AEP-NRC-2024-83 10 CFR 50.73 2AB Emergency Diesel Generator Inoperable for longer than allowed by Technical Specifications In accordance with 10 CFR 50. 73, Licensee Event Report (LER) System, Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant Unit 2, is submitting as an enclosure to this letter the following report:
LER 316/2024-004-00: 2AB Emergency Diesel Generator Inoperable for longer than allowed by Technical Specifications There are no commitments contained in this submittal.
Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Director, at (269) 466-2649.
Sincerely,
~AIU Scott A. Dailey Site Vice President MPH/sjh Enclosure:
Licensee Event Report 316/2024-004-00: 2AB Emergency Diesel Generator Inoperable for longer than allowed by Technical Specifications
U.S. Nuclear Regulatory Commission Page 2 c:
EGLE - RMD/RPS J. B. Giessner -- NRC Region Ill NRC Resident Inspector N. Quilico -- MPSC R. M. Sistevaris -- AEP Ft. Wayne S. P. Wall, NRC Washington D.C.
A. J. Williamson -- AEP Ft. Wayne AEP-NRC-2024-83
Enclosure to AEP-NRC-2024-83 Licensee Event Report 316/2024-004-00: 2AB Emergency Diesel Generator Inoperable for longer than allowed by Technical Specifications
Abstract
On May 21, 2024, with Cook Nuclear Plant (CNP) Units 1 and 2 in Mode 1 at 100% power, the 2AB EOG failed to reach the required frequency during the slow speed start surveillance, per the required acceptance criteria range of 59.5 to 60.4 Hz. The failure to reach the required frequency was originally attributed to corroded connections on the Minimum Speed Threshold and Slow Start control relays.
On July 23, 2024, the 2AB EOG, once again, failed to reach the required frequency during a surveillance run. The cause of the failure was determined to be an intermittent failure of the Digital Reference Unit (DRU). Due to the similar symptoms between the two failures of the 2AB EOG, it was determined that the 2AB EOG failure on May 21, 2024, was also due to a failure of the DRU. Due to the discovery that both EOG failures were a result of a failure of the DRU, the 2AB EOG was determined to be inoperable from the time the original condition was discovered on 05/21/2024 at 2115, until the time it successfully passed a surveillance after the DRU was replaced on 7/24/2024 at 2300.
Therefore, the identified condition is reportable, for both units, in accordance with 10 CFR 50.73(a)(2)(i)(B) as a Condition prohibited by Technical Specifications. Furthermore, during this period of time, there were instances on Unit 2 where concurrent with the 2AB EOG, the 2CD EOG was inoperable, which results in being reportable per 10 CFR 50.73(a)(2)(v) as an Event or Condition which could have prevented the fulfillment of a Safety Function. An Apparent Cause Evaluation and Root Cause Evaluation of the DRU failure are currently in progress and a supplement to this Licensee Event Report, with additional information, will be submitted upon completion.
EVENT DESCRIPTION 050 052
- 2. DOCKET NUMBER
- 3. LER NUMBER I
00316 NUMBER NO.
I YEAR SEQUENTIAL REV
~-I 004 1-0 On May 21, 2024, with Cook Nuclear Plant (CNP) Units 1 and 2 in Mode 1 at 100% power, the 2AB Emergency Diesel Generator (EDG) [DG] failed to reach the required frequency during the slow speed start surveillance, per the required acceptance criteria range of 59.5 to 60.4 Hz. The failure to reach the required frequency was originally attributed to corroded connections on the Minimum Speed Threshold and Slow Start control relays.
On July 23, 2024, the 2AB EOG, once again, failed to reach the required frequency during a surveillance run. The cause of the failure was determined to be an intermittent failure of the Digital Reference Unit (DRU). Due to the similar symptoms between the two failures of the 2AB EDG, it was determined that the 2AB EDG failure on May 21, 2024, was also due to the failure of the DRU.
Unit 2 Limiting Condition of Operation (LCO) 3.8.1 requires two diesel generators (DGs) capable of supplying the onsite Class 1 E power distribution subsystem(s) to be OPERABLE in MODE 1. Additionally, Unit 1 LCO 3.8.1 requires the Unit 2 EDG(s) to be capable of supporting the associated equipment required to be OPERABLE by LCO 3.7.8, Essential Service Water (ESW) System [Bl]. If both Unit 1 ESW trains are cross-tied to Unit 2, then the two Unit 2 EDGs are required to be OPERABLE. The maximum COMPLETION TIME allowed to restore an inoperable EDG to OPERABLE status in MODE 1 is 14 days. With this COMPLETION TIME not met, then the affected Unit is required to be in MODE 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
Due to the discovery that both EDG failures were a result of a failure of the DRU, the 2AB EDG was determined to be inoperable from the time the original condition was discovered on 05/21/2024 at 2115, until the time it successfully passed a surveillance after the DRU was replaced on 7/24/2024 at 2300. The period of time that the 2AB EDG was determined to be INOPERABLE exceeds the time allowed by LCO 3.8.1. Therefore, the identified condition is reportable in accordance with 10 CFR 50.73(a)(2)(i)(B) as a Condition prohibited by Technical Specifications, for Units 1 and 2.
Additionally, during this period of time, it was determined that the redundant EDG (2CD) was INOPERABLE for surveillance and maintenance activities during the following times:
05/22/2024 21 :08 - 05/22/2024 22:33 U2 CD INOPERABLE for U1 ESW surveillance 05/30/2024 07:05 - 05/30/2024 14:50 U2 CD INOPERABLE for maintenance 06/03/2024 20: 15 - 06/04/2024 01 :25 U2 CD INOPERABLE for surveillance activities 07/09/2024 19:34 - 07/10/2024 00:15 U2 CD INOPERABLE for surveillance activities 07/10/2024 20:52 - 07/10/2024 21 :46 U2 CD INOPERABLE for U2 ESW surveillance Additionally, LCO 3.8.1 contains a Prescribed Action to declare supported systems inoperable upon discovery of the inoperability of redundant required features concurrent with DG inoperability, with a Completion Time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. During the time that the 2AB EDG was determined to be inoperable, there were instances where supported systems should have been declared inoperable. Therefore, during these instances, as well as the 5 instances that 2CD EDG was INOPERABLE for surveillance and maintenance activities, the identified condition is reportable per 10 CFR 50.73(a)(2)(v) as an Event or Condition which could have prevented the fulfillment of a Safety Function for Unit 2.
COMPONENT 2-DGAB-DRU - 2AB EDG DRU CAUSE OF THE EVENT
- 2. DOCKET NUMBER
- 3. LER NUMBER I
00316 NUMBER NO.
I YEAR SEQUENTIAL REV
~-I 004 1-0 An Apparant Cause Evaluation (ACE) is in progress at the time of the writing of this LER, to determine the cause and corrective actions associated with the 2AB EOG DRU failure. Additionally, a Root Cause Evaluation (RCE) is in progress to determine why the station failed to identify and correct the cause of the 2AB EOG Surveillance failure that occurred on May 21, 2024. A supplement to this LER will be submitted upon completion of these cause evaluations.
CORRECTIVE ACTIONS The corrective actions will be provided in a supplement to this LER upon completion of the ACE and RCE.
ASSESSMENT OF SAFETY CONSEQUENCES NUCLEAR SAFETY A probabilistic risk assessment (PRA) was performed to estimate the impact of the 2AB EOG inoperability on Core Damage Frequency (CDF) and Large Early Release Frequency (LERF). Further review of the condition was performed to identify appropriate PRA mapping for this assessment. This review concluded that for the frequencies observed during the failed surveillances, the 2AB EOG would have been able to meet its PRA success criteria. However, this review was unable to eliminate the potential for the failed DRU to result in an EOG failure during its mission time. To capture these insights, this assessment was performed by assuming a higher failure probability for the 2AB EOG.
The evaluation used the average test/maintenance internal events and fire PRAs to estimate an increase in CDF and LERF over an assumed 63-day exposure time. These results are within the bounds for "Very Low Safety Significance" as described within NRC Inspection Manual Chapter 0609.
INDUSTRIAL SAFETY There was no actual or potential industrial safety hazard resulting from the 2AB EOG lnoperability.
RADIOLOGICAL SAFETY There was no actual or potential radiological safety hazard resulting from the 2AB EOG lnoperability.
PREVIOUS SIMILAR EVENTS A review of Licensee Event Reports for the past five years found no similar events. Page 3