Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1373 INDIANA MICHIGAN POWER April 11, 2003 AEP:NRC:2691-29 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units I and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for March 2003 is submitted.
Sincerely, Director Design Engineering and Regulatory Affairs BWO/rdw Attachment 2*4AC
U. S. Nuclear Regulatory Commission AEP:NRC:2691-29 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health M. J. Finissi G. T. Gaffney - Canton J. B. Giessner S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 4/2103 COMPLETED BY T Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit I Notes:
- 2. Reporting Period Mar-03
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date
- 11. Hours in Reporting Period 744.0 2160.0
- 12. No. of Hrs. Reactor Was Critical 744.0 1695.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator on Une 744.0 1673.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2456661.4 5474006.0
- 17. Gross Elect. Energy Gen. (MWH) 798010.0 1777460.0
- 18. Net Elect. Energy Gen. (MWH) 771765.0 1718515.5
- 19. Unit Service Factor 100.0 77.5
- 20. Unit Availability Factor 100.0 77.5
- 21. Unit Capacity Factor (MDC Net) 103.7 79.6
- 22. Unit Capacity Factor (DER Net) 101.7 78.0
- 23. Unit Forced Outage Rate 0.0 22.5
- 24. Shutdowns Scheduled over Next Six Months (TypeDate,and Duration):
Cumm.
247608.0 169043.8 463.0 166362.5 321.0 495743080.6 161019890.0 154993712.0 67.7 67.7 64.0 62.8 19.2
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Apr-03 T Pham 269-465-5901 MONTH Mar-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 3/11/03 3/2103 3/3/03 3/4/03 3/5/03 3/6/03 317/03 3/8/03 3/9/03 3/10/03 3/11/03 3/12/03 3113103 3/14/03 3115/03 3/16/03 1040 1042 1035 1036 1044 1041 1037 1042 1038 1042 1035 1036 1038 1035 1036 1038 3/17/03 3/18/03 3/19103 3/20/03 3/21/03 3/22/03 3/23/03 3124/03 3125/03 3/26/03 3/27/03 3/28/03 3/29/03 3/30/03 3/31/03 1037 1040 1036 1030 1039 1039 1033 1035 1037 1035 1031 1034 1040 1031 1046
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit I April 2, 2003 B. O'Rourke 269-465-5901 1of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 4/2/03 COMPLETED BY T Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Notes:
- 2. Reporting Period Mar-03
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Y
- 11. Hours in Reporting Period 744.0
- 12. No. of Hrs. Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2536498.7 4
- 17. Gross Elect. Energy Gen. (MWH) 843740.0
- 18. Net Elect. Energy Gen. (MWH) 818582.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 103.8
- 22. Unit Capacity Factor (DER Net) 100.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Rpfeplinn tiAenp achpduiedd fnr Mavn 2003.
'r. to Date 2160.0 1884.6 0.0
-1849.1 0.0 5215442.3 2060580.0 1997487.8 85.6 85.6 87.2 84.8 14.4 Cumm.
221754.0 143452.7 0.0 139589.6 0.0 437439139.6 141834280.0 136750227.1 63.6 63.6 59.3 57.7 23.7
- 25. If Shut Down At End of Report Period, Est'ed Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
v AVERAGE DAILY POWER LEVEL (MWeNet)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Apr-03 T Pham 269-465-5901 MONTH Mar-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY 311/03 312/03 3/3/03 314/03 3/5/03 3/6103 317/03 3/8/03 3/9103 3/10/03 3111/03 3112103 3113103 3114/03 3115103 3116/03 DAY 1102 1101 1101 1104 1102 1111 1103 1097 1100 1093 1095 1101 1102 1097 1101 1106 3/17/03 3118/03 3119/03 3/20/03 3/21/03 3/22/03 3/23/03 3/24/03 3/25/03 3/26/03 3/27/03 3/28/03 3/29/03 3/30/03 3/31/03 1102 1095 1101 1102 1102 1098 1094 1102 1097 1106 1101 1094 1097 1099 1103
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 April 2, 2003 B. O'Rourke 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE 5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source