March 2003 Monthly Operating Report for Donald C. Cook Nuclear Plant, Units 1 & 2
ML031070435
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/11/2003
From: Jack Giessner
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-29
Download: ML031070435 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1373 INDIANA MICHIGAN POWER April 11, 2003 AEP:NRC:2691-29 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units I and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for March 2003 is submitted.

Sincerely, Director Design Engineering and Regulatory Affairs BWO/rdw Attachment 2*4AC

U. S. Nuclear Regulatory Commission AEP:NRC:2691-29 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health M. J. Finissi G. T. Gaffney - Canton J. B. Giessner S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 4/2103 COMPLETED BY T Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit I Notes:
2. Reporting Period Mar-03
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 744.0 2160.0
12. No. of Hrs. Reactor Was Critical 744.0 1695.2
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Une 744.0 1673.6
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2456661.4 5474006.0
17. Gross Elect. Energy Gen. (MWH) 798010.0 1777460.0
18. Net Elect. Energy Gen. (MWH) 771765.0 1718515.5
19. Unit Service Factor 100.0 77.5
20. Unit Availability Factor 100.0 77.5
21. Unit Capacity Factor (MDC Net) 103.7 79.6
22. Unit Capacity Factor (DER Net) 101.7 78.0
23. Unit Forced Outage Rate 0.0 22.5
24. Shutdowns Scheduled over Next Six Months (TypeDate,and Duration):

Cumm.

247608.0 169043.8 463.0 166362.5 321.0 495743080.6 161019890.0 154993712.0 67.7 67.7 64.0 62.8 19.2

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Apr-03 T Pham 269-465-5901 MONTH Mar-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 3/11/03 3/2103 3/3/03 3/4/03 3/5/03 3/6/03 317/03 3/8/03 3/9/03 3/10/03 3/11/03 3/12/03 3113103 3/14/03 3115/03 3/16/03 1040 1042 1035 1036 1044 1041 1037 1042 1038 1042 1035 1036 1038 1035 1036 1038 3/17/03 3/18/03 3/19103 3/20/03 3/21/03 3/22/03 3/23/03 3124/03 3125/03 3/26/03 3/27/03 3/28/03 3/29/03 3/30/03 3/31/03 1037 1040 1036 1030 1039 1039 1033 1035 1037 1035 1031 1034 1040 1031 1046

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit I April 2, 2003 B. O'Rourke 269-465-5901 1of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 4/2/03 COMPLETED BY T Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period Mar-03
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Y

11. Hours in Reporting Period 744.0
12. No. of Hrs. Reactor Was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 2536498.7 4
17. Gross Elect. Energy Gen. (MWH) 843740.0
18. Net Elect. Energy Gen. (MWH) 818582.0
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (MDC Net) 103.8
22. Unit Capacity Factor (DER Net) 100.9
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Rpfeplinn tiAenp achpduiedd fnr Mavn 2003.

'r. to Date 2160.0 1884.6 0.0

-1849.1 0.0 5215442.3 2060580.0 1997487.8 85.6 85.6 87.2 84.8 14.4 Cumm.

221754.0 143452.7 0.0 139589.6 0.0 437439139.6 141834280.0 136750227.1 63.6 63.6 59.3 57.7 23.7

25. If Shut Down At End of Report Period, Est'ed Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

v AVERAGE DAILY POWER LEVEL (MWeNet)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Apr-03 T Pham 269-465-5901 MONTH Mar-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY 311/03 312/03 3/3/03 314/03 3/5/03 3/6103 317/03 3/8/03 3/9103 3/10/03 3111/03 3112103 3113103 3114/03 3115103 3116/03 DAY 1102 1101 1101 1104 1102 1111 1103 1097 1100 1093 1095 1101 1102 1097 1101 1106 3/17/03 3118/03 3119/03 3/20/03 3/21/03 3/22/03 3/23/03 3/24/03 3/25/03 3/26/03 3/27/03 3/28/03 3/29/03 3/30/03 3/31/03 1102 1095 1101 1102 1102 1098 1094 1102 1097 1106 1101 1094 1097 1099 1103

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 April 2, 2003 B. O'Rourke 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODE 5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source