December 2002 Monthly Operating Report for Donald C. Cook
ML030170179
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/15/2003
From: Greenlee S
American Electric Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-26
Download: ML030170179 (8)


Text

American Electric Power CookNudearPNat Ome Cook Plce Bga,ý ril 491O6 AMERICANO ELECTRIC POWER January 15, 2003 AEP:NRC:2691-26 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for December 2002 is submitted Sinceiely, Scot A. Greenlee Director, Nuclear Technical Services BWO/jen Attachments AEP:

RAmerica's Energy' Partner-"

U. S. Nuclear Regulatory Commission Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health M. J. Finissi G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk AEP:NRC:2691-26

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 1/2/03 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Dec-02
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 744.0 8760.0
12. No. of Hrs. Reactor Was Critical 744.0 7827.3
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 744.0 7783.5
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2344032.6 24763767.6
17. Gross Elect. Energy Gen. (MWH) 767810.0 8009610.0
18. Net Elect. Energy Gen. (MWH) 741782.0 7740902.6
19. Unit Service Factor 100.0 88.9
20. Unit Availability Factor 100.0 88.9
21. Unit Capacity Factor (MDC Net) 99.7 88.4
22. Unit Capacity Factor (DER Net) 97.7 86.6
23. Unit Forced Outage Rate 0.0 1.2
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Cumm.

245448.0 167348.6 463.0 164688.9 321.0 490269074.6 159242430.0 153275196.5 67.6 67.6 63.9 62.7 19.2

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Jan-03 RAF Harris 269-465-5901 MONTH Dec-02 AVERAGE DAILY POWER LEVEL 1032 1032 1029 1033 1031 1032 1031 1035 1033 1028 1032 1029 1030 1032 1030 1035 DAY 12/17/02 12/18/02 12/19102 12/20102 12/21/02 12/22/02 12/23/02 12/24/02 12/25/02 12/26102 12/27/02 12/28/02 12/29/02 12/30/02 12/31/02 AVERAGE DAILY POWER LEVEL 1031 1030 1029 1032 1033 813 1020 575 651 1027 1030 1031 1033 1035 1035 DAY 12/11/02 12/2/02 12/3/02 12/4102 12/5/02 12/6/02 12/7/02 12/8/02 12/9/02 12/10102 12/11/02 12/12/02 12/13102 12/14/02 12/15/02 12/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 January 8, 2003 B. O'Rourke 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - December 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE4

'CODE 5 TO PREVENT RECURRENCE 345 021222 S

346 021223 F

0 0

B A

4 4

n/a n/a AB sJ P

n/a Unit 1 power reduced to approximately 52% to allow containment entry to add oil to the #14 Reactor Coolant Pump. A Unit 1 downpower is scheduled to repair the oil leak.

Unit 1 power reduced to approximately 58% to allow repair of a weld leak on the 1-inch West Main Feed Pump discharge pressure instrument 1-fpi-261-vl piping.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 112/03 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 2 Notes:
2. Reporting Period Dec-02
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Y

11. Hours in Reporting Period 744.0
12. No. of Hrs. Reactor Was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 2535925.7 2
17. Gross Elect. Energy Gen. (MWH) 847150.0
18. Net Elect. Energy Gen. (MWH) 820515.0
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (MDC Net) 104.0
22. Unit Capacity Factor (DER Net) 101.2
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Ppfil-finr nit nI*n*.rh jdi rd for Anril 2()03

r. to Date 8760.0 7463.1 0.0 7338.6 0.0 1396347.9 7947190.0 7687685A 83.8 83.8 82.8 80.5 5.9
25. If Shut Down At End of Report Period, Est'ed Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.

219594.0 141568.1 0.0 137740.5 0.0 431223697.3 139773700.0 134752739.3 63.4 63.4 59.1 57.4 23.8 W

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Jan-03 RAF Harris 269-465-5901 MONTH Dec-02 AVERAGE DAILY POWER LEVEL 1101 1098 1105 1099 1106 1103 1105 1101 1099 1104 1098 1103 1102 1102 1101 1103 DAY 12/17/02 12/18102 12/19/02 12/20/02 12/21/02 12/22/02 12/23/02 12/24/02 12/25/02 12/26/02 12/27/02 12/28/02 12/29/02 12/30/02 12/31/02 AVERAGE DAILY

,POWER LEVEL 1105 1102 1103 1107 1101 1103 1105 1102 1106 1104 1110 1102 1106 1099 1103 DAY 12/1/02 12/2/02 12/3/02 12/4/02 12/5102 12/6/02 12/7/02 12/8/02 12/9/02 12/10/02 12/11/02 12/12/02 12/13/02 12/14/02 12/15/02 12/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 January 8, 2003 B. O'Rourke 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - December 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.

CODE 4 CODE' TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S. Scheduled 2 REASON:

A-Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G, Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I. Same Source