September 2002 Monthly Operating Report for Donald C. Cook, Units 1 and 2
ML022890129
Person / Time
Site: Cook  
(DPR-058, DPR-074)
Issue date: 10/15/2002
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-21
Download: ML022890129 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER October 15, 2002 Docket Nos.

AEP:NRC:2691-21 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P 1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units I and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for September 2002 is submitted.

Sincerely, cot A. Greenlee Director, Nuclear Technical Services BWO/pae Attachments

U. S. Nuclear Regulatory Commission Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock M. K. Scarpello W. H. Schalk AEP:NRC:2691-21

NRC OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-315 10/1/02 RAF Harris 616-465-5901 OPERATING STATUS Note:

1. Unit Name D. C. Cook Unit 1
2. Reporting Period Sep-02
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If An
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Mo.

720.0 720.0 0.0 720.0 0.0 2338611.6 744160.0 718927.0 100.0 100.0 99.9 97.9 0.0 Yr. to Date 6551.0 5618.3 0.0 5574.5 0.0 17709845.4 5709650.0 5518116.6 85.1 85.1 84.2 82.6 1.7 Cumm.

243239.0 165139.6 463.0 162479.9 321.0 483215152.4 156942470.0 151052410.5 67.3 67.3 63.6 62.3 19.4

24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved

NRC OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY TELEPHONE 50-316 10/1/02 RAF Harris 616-465-5901 OPERATING STATUS Note:

1. Unit Name D.C. Cook Unit 2
2. Reporting Period Sep-02
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:
11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH)
18. Net Electrical Energy Gen. (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate This Mo.

720.0 720.0 0.0 720.0 0.0 2453193.9 781760.0 755926.0 100.0 100.0 99.0 96.3 0.0 Yr. to Date 6551.0 5254.1 0.0 5129.6 0.0 16870475.8 5456140.0 5275577.4 78.3 78.3 76.0 73.9 8.2 Cumm.

217385.0 139359.1 0.0 135531.5 0.0 423697825.1 137282650.0 132340631.3 63.0 63.0 58.6 57.0 24.1

24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 01-Oct-02 RAF Harris 616-465-5901 MONTH Sep-02 AVERAGE DAILY POWER LEVEL 1012 1002 987 986 997 992 999 999 981 986 1023 1018 1004 1002 1001 999 DAY 9/17/02 9/18/02 9/19/02 9120/02 9/21/02 9/22/02 9/23/02 9/24/02 9/25/02 9126/02 9/27/02 9/28/02 9/29/02 9/30/02 AVERAGE DAILY POWER LEVEL 993 990 990 992 988 995 998 1000 996 1001 1009 1009 1004 1004 DAY 911/02 9/2/02 913/02 9/4/02 9/5/02 9/6/02 9/7/02 918/02 919/02 9/10/02 9/11/02 9/12/02 9/13102 9114/02 9/15/02 9/16/02

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 1-Oct-02 RAF Harris 616-465-5901 MONTH Sep-02 AVERAGE DAILY POWER LEVEL 1073 1060 1045 1042 1048 1050 1056 1042 1044 1043 1078 1081 1064 1050 1050 1045 DAY 9/17/02 9/18/02 9/19102 9/20/02 9/21/02 9122/02 9/23/02 9/24/02 9/25/02 9/26102 9/27/02 9/28102 9129/02 9130/02 AVERAGE DAILY POWER LEVEL 1039 1037 1041 1048 1036 1035 1044 1048 1039 1041 1047 1064 "1054 1055 DAY 9/1/02 912/02 913/02 914/02 915/02 9/6/02 9/7/02 9/8/02 9/9102 9110/02 9111/02 9/1 2/02 9113/02 9/14/02 9115/02 9/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 October 2, 2002 B. O'Rourke 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - September 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODE 5 TO PREVENT RECURRENCE None S...

,*p,,+*--t J t'.. lJIlIf'..JIN kIl 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHUU:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 0TZ1 ft.M:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit I: Same Source

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 October 2, 2002 B. O'Rourke 616-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - September 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source