Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER September 9, 2004 AEP:NRC:2691-46 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Conmmission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for August 2004 is submitted.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Toby K. Woods, Compliance Supervisor, at (269) 466-2798.
Sincerely, John A. Zwolinski Safety Assurance Director JEN/jen Attachment jl'
U. S. Nuclear Regulatory Commission AEP:NRC:2691-46 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/HWRPS D. P. Fadel M. J. Finissi G. T. Gaffney - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk J. A. Zwolinski
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 9/2/2004 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1
- 2. Reporting Period Aug-04
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7)
Notes:
Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe) 1 0. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 744.0
- 12. No. of Hrs. Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2455432.4
- 17. Gross Elect. Energy Gen. (MWH) 780630.0 1 8. Net Elect. Energy Gen. (MWH) 754209.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 101.4
- 22. Unit Capacity Factor (DER Net) 99.4
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Yr. to Date 5856.0 5670.9 0.0 5659.9 0.0 18633909.8 6008340.0 5808847.8 96.7 96.7 99.2 97.2 0.0 Cumm.
260064.0 179572.2 463.0 176839.5 321.0 530002437.4 172050143.0 165654131.7 68.5 68.5 65.1 63.8 18.6
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Sep-04 R. Harris 269-465-5901 MONTH Aug-04 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 8/112004 812/2004 8/3/2004 8/4/2004 8/5/2004 8/6/2004 8/7/2004 8/8/2004 8/9/2004 8/10/2004 8/11/2004 8/12/2004 8/13/2004 8/14/2004 8/15/2004 8/16/2004 1014 1009 1005 1009 1032 1036 1024 1013 1020 1012 1014 1014 1016 1014 1013 1018 8/17/2004 8/1812004 8/19/2004 8/20/2004 8/21/2004 8/22/2004 8/23/2004 8/24/2004 8/25/2004 8/26/2004 8/27/2004 8/28/2004 8/29/2004 8/30/2004 8/31/2004 1011 1010 1014 1009 1011 1016 1010 1002 1007 1009 1005 1002 1028 1020 1011
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 September 2, 2004 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2004 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE None.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and Ucense Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 9/2/2004 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Notes:
- 2. Reporting Period Aug-04
- 3. Licensed Thermal Power (MWt) 3468
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 744.0 5856.0 234210.0
- 12. No. of Hrs. Reactor Was Critical 744.0 5601.0 153884.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 744.0 5567.2 149921.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2576221.8 19084115.4 472759974.9
- 17. Gross Elect. Energy Gen. (MWH) 817360.0 6199358.0 153313388.0
- 18. Net Elect. Energy Gen. (MWH) 790491.0 6000934.5 147865841.2
- 19. Unit Service Factor 100.0 95.1 64.6
- 20. Unit Availability Factor 100.0 95.1 64.6
- 21. Unit Capacity Factor (MDC Net) 100.2 96.7 60.7
- 22. Unit Capacity Factor (DER Net) 97.5 94.0 59.0
- 23. Unit Forced Outage Rate 0.0 4.9 22.8
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Refueling outage currently scheduled for October 2004 with a planned duration of 35 days.
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Sep-04 R. Harris 269-465-5901 MONTH Aug-04 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 8/1/2004 8/2/2004 8/3/2004 8/4/2004 8/5/2004 8/6/2004 8/7/2004 8/8/2004 8/9/2004 8/10/2004 8/11/2004 8/12/2004 8/13/2004 8/14/2004 8/15/2004 8/16/2004 1051 1055 1052 1053 1085 1092 1076 1055 1062 1063 1059 1067 1064 1065 1047 1062 8/17/2004 8/18/2004 8/19/2004 8/20/2004 8/21/2004 8/22/2004 8/23/2004 8/24/2004 8/25/2004 8/26/2004 8/27/2004 8/28/2004 8/29/2004 8/30/2004 8/31/2004 1061 1062 1062 1056 1057 1058 1060 1054 1066 1052 1058 1074 1082 1061 1066
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 September 2, 2004 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2004 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source