August 2003 Monthly Operating Report for D.C. Cook, Units 1 and 2
ML032670991
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/15/2003
From: Zwolinski J
Indiana & Michigan Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-34
Download: ML032670991 (12)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 MICHIGAN POWER September 15, 2003 AEP:NRC:2691-34 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for August 2003 is submitted.

Additionally, the following Unit Shutdowns and Power Reductions summaries are being resubmitted due to errors in the calculation of the duration hours: Unit 1 and Unit 2 - February 2003; Unit 1 - May 2003; and Unit 2 - June 2003. These summaries incorrectly reported reactor shutdown hours instead of generator shutdown hours for those periods.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.

Sincerely, John . Zwolinski Director, Design Engineering and Regulatory Affairs JEN/jen Attachment

U. S. Nuclear Regulatory Commission AEP:NRC:2691-34 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - Department of Health M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny B. A. McIntyre T. C. Pham NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk J. A. Zwolinski

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 915/2003 COMPLETED BY R.Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit I Notes:
2. Reporting Period Aug-03
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. toI )ate Cumnm.

11. Hours in Reporting Period 744.0 58 31.0 251279.0
12. No. of Hrs. Reactor Was Critical 744.0 45! 53.9 171902.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 744.0 45 18.5 169207.4
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2456177.7 148059 19.8 505074994.4
17. Gross Elect. Energy Gen. (MWH) 776950.0 47651: 33.0 164007563.0
18. Net Elect Energy Gen. (MWH) 750504.0 46057 47.7 157880944.2
19. Unit Service Factor 100.0 77.5 67.8
20. Unit Availability Factor 100.0 77.5 67.8
21. Unit Capacity Factor (MDC Net) 100.9 79.0 64.3
22. Unit Capacity Factor (DER Net) 98.9 77.4 63.0
23. Unit Forced Outage Rate 0.0 22.5 19.3
24. Shutdowns Scheduled over Next Six Months (TypeDate,and Duration):

Refueling outage currentiy scheduled for October 2003 with a planned duration of 33 days.

25. If Shut Down At End of Report Period, Esfd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 05-Sep-03 COMPLETED BY R. Harris TELEPHONE 269-465-5901 MONTH Aug-03 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 8/1/2003 1010 8/17/2003 1003 8/2/2003 1005 8/18/2003 1010 8/3/2003 1007 8/19/2003 1008 8/4/2003 1003 8/20/2003 1004 8/5/2003 1013 8/21/2003 1002 8/6/2003 1009 8/22/2003 1002 8/7/2003 1019 8/23/2003 1010 8/8/2003 1014 8/24/2003 1010 8/9/2003 1018 8/25/2003 1017 8/10/2003 1014 8/26/2003 995 8/11/2003 1009 8/27/2003 1015 8/12/2003 1016 8/28/2003 989 8/13/2003 1010 8/29/2003 1001 8/14/2003 1007 8/30/2003 1019 8/15/2003 1005 8/31/2003 1025 8/16/2003 1004

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit I DATE September 5, 2003 COMPLETED BY J. Newrniller TELEPHONE 269-465-5901 PAGE 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE5 TO PREVENT RECURRENCE.

None 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit : Same Source 5: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 9/52003 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C.Cook Unit 2
2. Reporting Period Aug-03
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur inCapacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 5831.0 225425.0
12. No. of Hrs. Reactor Was Critical 368.1 3820.7 145388.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 354.9 3745.2 141485.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 1195294.7 12544766.0 443768463.2
17. Gross Elect Energy Gen. (MWH) 375660.0 4092510.0 143866210.0
18. Net Elect. Energy Gen. (MWH) 363190.1 3963260.8 138716000.1
19. Unit Service Factor 47.7 64.2 63.4
20. Unit Availability Factor 47.7 64.2 63.4
21. Unit Capacity Factor (MDC Net) 46.1 64.1 59.2
22. Unit Capacity Factor (DER Net) 44.8 62.4 57.6
23. Unit Forced Outage Rate 52.3 20.4 23.7
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Estd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 5-Sep-03 COMPLETED BY R. Hams TELEPHONE 269-465-5901 MONTH Aug-03 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 8/1/2003 1016 8/17/2003 0 8/2/2003 1070 8/18/2003 0 813/2003 1072 8/19/2003 0 8/4/2003 1055 8/20/2003 0 8/5/2003 1070 8/21/2003 0 8/6/2003 1072 8/22/2003 0 8/7/2003 1077 8/23/2003 0 8/8/2003 1086 8/24/2003 0 8/9/2003 1073 8/25/2003 0 8/10/2003 1071 8/26/2003 0 8/11/2003 1068 8/27/2003 0 8/12/2003 1070 8/28/2003 0 8/13/2003 189 8/29/2003 145 8/14/2003 0 8/30/2003 907 8/15/2003 0 8/31/2003 1091 8/16/2003 0

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE September 5, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE4 CODE 5 TO PREVENT RECURRENCE 214 030813 F 389.1 A 1 N/A N/A N/A Unit 2 was manually shut down due to a steam leak found on feedwater check valve 2-FW-1 18-2.

I TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit : Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit I DATE September 9, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE 347 030115 F 98.6 A 3 315/2003-001 EL XFMR The unit was shutdown due to a fault and subsequent fire in the Unit 1 main transformer. The cause of the fault is under investigation. The main transformer has been replaced. Actions to prevent recurrence will be identified once the cause of the transformer fault is known.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit : Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit I DATE September 8, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - May 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE5 TO PREVENT RECURRENCE 348 030424 F 661.6 H 2 315/2003-003 n/a n/a A large influx of alewives caused a high DP on the traveling screens. The unit was manually tripped due to degraded circulating water conditions.

I TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit : Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE September 8, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE5 TO PREVENT RECURRENCE 210 030205 F 213.2 A 3 316/2003-002 SJ JX Unit 2 turbine/reactortrip from 100% due to a I dual failure of the 24 VDC power supplies in control group 3. The cause of the power supply failure is under investigation. The power supplies have been replaced and the unit was returned to service. Actions to prevent recurrence will be identified once the cause of the failure Is known.

211 030214 F 8.0 A 4 n/a n/a n/a The Unit 2 turbine was manually tripped due to a high-high level in the moisture separator drain Tank (MSDT). The MSDT alternate level control valve was repaired and the generator was synchronized to the grid on February 15,2003 at 0302 hours0.0035 days <br />0.0839 hours <br />4.993386e-4 weeks <br />1.14911e-4 months <br /> (the reactor remained online while the generator was offline). The cause of the valve failure is under Investigation.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit l: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook UnIt 2 DATE September 8, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - June 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE 213 030505 S 477.3 C 4 n/a n/a n/a Scheduled refueling outage activities commenced while already shut down I due to the fish intrusion event .

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit : Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)