Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 MICHIGAN POWER September 15, 2003 AEP:NRC:2691-34 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for August 2003 is submitted.
Additionally, the following Unit Shutdowns and Power Reductions summaries are being resubmitted due to errors in the calculation of the duration hours: Unit 1 and Unit 2 - February 2003; Unit 1 - May 2003; and Unit 2 - June 2003. These summaries incorrectly reported reactor shutdown hours instead of generator shutdown hours for those periods.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.
Sincerely, John
. Zwolinski Director, Design Engineering and Regulatory Affairs JEN/jen Attachment
U. S. Nuclear Regulatory Commission AEP:NRC:2691-34 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - Department of Health M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny B. A. McIntyre T. C. Pham NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk J. A. Zwolinski
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 915/2003 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit I Notes:
- 2. Reporting Period Aug-03
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. toI
- 11. Hours in Reporting Period 744.0 58
- 12. No. of Hrs. Reactor Was Critical 744.0 45!
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 744.0 45
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2456177.7 148059
- 17. Gross Elect. Energy Gen. (MWH) 776950.0 47651:
- 18. Net Elect Energy Gen. (MWH) 750504.0 46057
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 100.9
- 22. Unit Capacity Factor (DER Net) 98.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (TypeDate,and Duration):
Refueling outage currentiy scheduled for October 2003 with a planned duration of 33 days.
)ate 31.0 53.9 0.0 18.5 0.0 19.8 33.0 47.7 77.5 77.5 79.0 77.4 22.5 Cumnm.
251279.0 171902.5 463.0 169207.4 321.0 505074994.4 164007563.0 157880944.2 67.8 67.8 64.3 63.0 19.3
- 25. If Shut Down At End of Report Period, Esfd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 05-Sep-03 R. Harris 269-465-5901 MONTH Aug-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 8/1/2003 8/2/2003 8/3/2003 8/4/2003 8/5/2003 8/6/2003 8/7/2003 8/8/2003 8/9/2003 8/10/2003 8/11/2003 8/12/2003 8/13/2003 8/14/2003 8/15/2003 8/16/2003 1010 1005 1007 1003 1013 1009 1019 1014 1018 1014 1009 1016 1010 1007 1005 1004 8/17/2003 8/18/2003 8/19/2003 8/20/2003 8/21/2003 8/22/2003 8/23/2003 8/24/2003 8/25/2003 8/26/2003 8/27/2003 8/28/2003 8/29/2003 8/30/2003 8/31/2003 1003 1010 1008 1004 1002 1002 1010 1010 1017 995 1015 989 1001 1019 1025
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit I September 5, 2003 J. Newrniller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE.
None 1 TYPE:
F: Forced 5: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit : Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 9/52003 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2
- 2. Reporting Period Aug-03
- 3. Licensed Thermal Power (MWt) 3468
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 744.0 5831.0 225425.0
- 12. No. of Hrs. Reactor Was Critical 368.1 3820.7 145388.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 354.9 3745.2 141485.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 1195294.7 12544766.0 443768463.2
- 17. Gross Elect Energy Gen. (MWH) 375660.0 4092510.0 143866210.0
- 18. Net Elect. Energy Gen. (MWH) 363190.1 3963260.8 138716000.1
- 19. Unit Service Factor 47.7 64.2 63.4
- 20. Unit Availability Factor 47.7 64.2 63.4
- 21. Unit Capacity Factor (MDC Net) 46.1 64.1 59.2
- 22. Unit Capacity Factor (DER Net) 44.8 62.4 57.6
- 23. Unit Forced Outage Rate 52.3 20.4 23.7
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
- 25. If Shut Down At End of Report Period, Estd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 5-Sep-03 R. Hams 269-465-5901 MONTH Aug-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 8/1/2003 8/2/2003 813/2003 8/4/2003 8/5/2003 8/6/2003 8/7/2003 8/8/2003 8/9/2003 8/10/2003 8/11/2003 8/12/2003 8/13/2003 8/14/2003 8/15/2003 8/16/2003 1016 1070 1072 1055 1070 1072 1077 1086 1073 1071 1068 1070 189 0
0 0
8/17/2003 8/18/2003 8/19/2003 8/20/2003 8/21/2003 8/22/2003 8/23/2003 8/24/2003 8/25/2003 8/26/2003 8/27/2003 8/28/2003 8/29/2003 8/30/2003 8/31/2003 0
0 0
0 0
0 0
0 0
0 0
0 145 907 1091
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 September 5, 2003 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE 214 030813 F
389.1 A
1 N/A N/A N/A Unit 2 was manually shut down due to a steam leak found on feedwater check valve 2-FW-1 18-2.
I TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit : Same Source
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit I September 9, 2003 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO.
CODE4 CODE 5 TO PREVENT RECURRENCE 347 030115 F
98.6 A
3 315/2003-001 EL XFMR The unit was shutdown due to a fault and subsequent fire in the Unit 1 main transformer. The cause of the fault is under investigation. The main transformer has been replaced. Actions to prevent recurrence will be identified once the cause of the transformer fault is known.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit : Same Source
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit I September 8, 2003 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - May 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE 348 030424 F
661.6 H
2 315/2003-003 n/a n/a A large influx of alewives caused a high DP on the traveling screens. The unit was manually tripped due to degraded circulating water conditions.
I TYPE:
F: Forced S: Scheduled 2 REASON:
A Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit : Same Source
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 September 8, 2003 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE 210 030205 F
213.2 A
3 316/2003-002 SJ JX Unit 2 turbine/reactortrip from 100% due to a dual failure of the 24 VDC power supplies in control group 3. The cause of the power supply failure is under investigation. The power supplies have been replaced and the unit was returned to service. Actions to prevent recurrence will be identified once the cause of the failure Is known.
211 030214 F
8.0 A
4 n/a n/a n/a The Unit 2 turbine was manually tripped due to a high-high level in the moisture separator drain Tank (MSDT). The MSDT alternate level control valve was repaired and the generator was synchronized to the grid on February 15,2003 at 0302 hours0.0035 days <br />0.0839 hours <br />4.993386e-4 weeks <br />1.14911e-4 months <br /> (the reactor remained online while the generator was offline). The cause of the valve failure is under Investigation.
I 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook UnIt 2 September 8, 2003 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - June 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.
CODE 4 CODE 5 TO PREVENT RECURRENCE 213 030505 S
477.3 C
4 n/a n/a n/a Scheduled refueling outage activities commenced while already shut down due to the fish intrusion event.
I 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit : Same Source