October 2003 Monthly Operating Report for D C Cook Units 1 and 2
ML033280026
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/14/2003
From: Zwolinski J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-36
Download: ML033280026 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER November 14, 2003 AEP:NRC:2691-36 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for October 2003 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Brian D. Mann, Acting Manager of Regulatory Affairs, at (269) 697-5806.

Sincerely, John

. Zwolinski Director, Design Engineering and Regulatory Affairs JEN/jen Attachment An'~~~~~

U. S. Nuclear Regulatory Commission AEP:NRC:2691-36 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - MDEQ-WHMD/HWRPS M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center J. N. Jensen B. Lewis - McGraw-Hill Companies D. H. Malin B. D. Mann K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 11/4/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Oct-03 Unit 1 was shut d
3. Licensed Thermal Power (MWt) 3304 beginning Octobe
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons own for refueling er 18, 2003.
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

11. Hours in Reporting Period 744.0
12. No. of Hrs. Reactor Was Critical 408.1
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 408.1
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 1335630.1
17. Gross Elect. Energy Gen. (MWH) 432550.0
18. Net Elect. Energy Gen. (MWH) 418123.1
19. Unit Service Factor 54.9
20. Unit Availability Factor 54.9
21. Unit Capacity Factor (MDC Net) 56.2
22. Unit Capacity Factor (DER Net) 55.1
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Yr. to Date 7296.0 5683.0 0.0 5647.6 0.0 18518970.8 5964883.0 5765563.8 77.4 77.4 79.0 77.5 18.9 Cumm.

252744.0 173031.6 463.0 170336.5 321.0 508788045.4 165207313.0 159040760.3 67.9 67.9 64.4 63.1 19.2

25. If Shut Down At End of Report Period, Estd Date of Startup:

Nov-2003

26. Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 04-Nov-03 T. Pham 269-465-5901 MONTH Oct-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 10/1/2003 10/2/2003 10/3/2003 10/4/2003 10/5/2003 10/6/2003 10/7/2003 10/8/2003 10/9/2003 10/10/2003 10/11/2003 10112/2003 10113/2003 10/14/2003 10/15/2003 10/16/2003 1034 1037 1040 1038 1037 1034 1037 1032 1032 1027 1037 1033 1040 1032 1047 1034 10/17/2003 10/18/2003 10/19/2003 10120/2003 10/21/2003 10/22/2003 10/23/2003 10/24/2003 10/25/2003 10/26/2003 10127/2003 10/28/2003 10/29/2003 10/30/2003 10/31/2003 847 2

0 0

0 0

0 0

0 0

0 0

0 0

0

ea)

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 -315 D.C. Cook Unit I November 6, 2003 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT.

CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODEs TO PREVENT RECURRENCE 349 031018 S

335.9 C

2 N/A N/A N/A Scheduled refueling outage.

I TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 11/412003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period Oct-03
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe) 1 0. Reasons For Restrictions.

This Mo.

Yr. to Date Cumm.

1 1. Hours in Reporting Period 744.0 7296.0 226890.0

12. No. of Hrs. Reactor Was Critical 744.0 5285.7 146853.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 744.0 5210.2 142950.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2579268.1 17620136.8 448843834.1
17. Gross Elect. Energy Gen. (MWH) 845960.0 5747520.0 145521220.0
18. Net Elect. Energy Gen. (MWH) 819817.0 5566908.8 140319648.1 1 9. Unit Service Factor 100.0 71.4 63.6
20. Unit Availability Factor 100.0 71.4 63.6
21. Unit Capacity Factor (MDC Net) 104.0 72.0 59.5
22. Unit Capacity Factor (DER Net) 101.1 70.0 57.8
23. Unit Forced Outage Rate 0.0 15.6 23.5
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Estd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 4-Nov-03 T. Pham 269-465-5901 MONTH Oct-03 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 10/1/2003 10/2/2003 10/3/2003 10/4/2003 10/5/2003 10/6/2003 10/7/2003 10/8/2003 10/9/2003 10/10/2003 10/11/2003 10/12/2003 10/13/2003 10/14/2003 10/15/2003 10/16/2003 1091 1096 1102 1097 1106 1099 1108 1096 1091 1092 1096 1092 1097 1099 1100 1099 10/17/2003 10/18/2003 10/19/2003 10/20/2003 10/21/2003 10/22/2003 10/23/2003 10/24/2003 10/25/2003 10/26/2003 10/27/2003 10/28/2003 10/29/2003 10/30/2003 10/31/2003 1097 1100 1104 1108 1102 1107 1108 1108 1109 1108 1108 1113 1114 1106 1105

1, I-DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 November 6, 2003 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source