Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER May 13, 2002 Docket Nos.
AEP:NRC:2691-12 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P 1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for April 2002 is submitted.
Sincerely, cot Aý. Greenlee Director, Nuclear Technical Services INJ/pae Attachments N,
U. S. Nuclear Regulatory Commission AEP:NRC:2691-12 Page 2 c: ANI Nuclear Engineering Department G. P Arent A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 5/2/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit I Notes:
- 2. Reporting Period Apr-02
- 3. Licensed Thermal Power (MWt) 3250
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe:
1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 719.0 2879.0 239567.0
- 12. No. of Hrs. Reactor Was Critical 719.0 2879.0 162400.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
- 14. Hours Generator on Line 707.9 2867.9 159773.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
- 16. Gross Therm. Energy Gen. (MWH) 2245565.4 9214787.4 474720094.4
- 17. Gross Elect. Energy Gen. (MWH) 722810.0 3006190.0 154239010.0
- 18. Net Elect. Energy Gen. (MWH) 699099.8 2909764.8 148444058.8
- 19. Unit Service Factor 98.5 99.6 67.2
- 20. Unit Availability Factor 98.5 99.6 67.2
- 21. Unit Capacity Factor (MDC Net) 97.2 101.1 63.5
- 22. Unit Capacity Factor (DER Net) 95.3 99.1 62.2
- 23. Unit Forced Outage Rate 1.5 0.4 19.6
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Refueling outage 18 is scheduled to begin during the second quarter of 2002. The proposed length of the
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION n"Mnl' 15-2&2 M.9, 3
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-May-02 RAF Harris 616-465-5901 MONTH Apr-02 AVERAGE DAILY POWER LEVEL DAY 1037 1026 1035 1030 1033 1034 1032 1030 1034 1034 1024 1030 1028 1029 1027 1027 AVERAGE DAILY POWER LEVEL 4/17/02 4/18/02 4119/02 4/20/02 4/21/02 4/22/02 4/23/02 4/24/02 4/25/02 4/26/02 4/27/02 4/28/02 4/29/02 4/30/02 1022 1036 1010 1028 1021 1029 1020 1025 719 156 670 981 956 970 DAY 4/1/02 4/2/02 4/3/02 4/4/02 4/5/02 4/6/02 4/7/02 4/8/02 4/9/02 4/10/02 4/11/02 4/12/02 4/13/02 4/14/02 4/15/02 4/16102
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit I May 9, 2002 N Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE 343 020425 F
11.1 A
4 FK BKR Turbine Generator taken off-line to repair a damaged Breaker K1 disconnect. Reactor remained at 8% power.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSITM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit I: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 512102 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.C. Cook Unit 2 Notes:
- 2. Reporting Period Apr-02
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date
- 11. Hours in Reporting Period 719.0 2879.0
- 12. No. of Hrs. Reactor Was Critical 719.0 1980.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator on Line 719.0 1904.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2402037.1 6112653.9
- 17. Gross Elect. Energy Gen. (MWH) 794790.0 2008750.0
- 18. Net Elect. Energy Gen. (MWH) 770102.0 1944016.7
- 19. Unit Service Factor 100.0 66.1
- 20. Unit Availability Factor 100.0 66.1
- 21. Unit Capacity Factor (MDC Net) 101.0 63.7
- 22. Unit Capacity Factor (DER Net) 98.3 61.9
- 23. Unit Forced Outage Rate 0.0 0.5
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Cumm.
213713.0 136085.5 0.0 132306.2 0.0 412940003.2 133835260.0 129009070.6 62.6 62.6 58.1 56.5 24.4
- 25. If Shut Down At End of Report Period, Est'ed Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-May-02 RAF Harris 616-465-5901 MONTH Apr-02 AVERAGE DAILY POWER LEVEL DAY 1093 1095 1100 1059 511 937 1098 1100 1104 1099 1102 1100 1100 1100 1095 1098 AVERAGE DAILY POWER LEVEL 4/17/02 4/18/02 4/19/02 4/20/02 4/21/02 4/22/02 4/23/02 4124/02 4/25/02 4/26/02 4/27/02 4/28/02 4/29/02 4/30/02 1092 1095 1093 1096 1100 1093 1093 1092 1091 1090 1091 1092 1093 1087 DAY 4/1/02 4/2/02 4/3/02 414/02 415/02 4/6/02 4/7/02 4/8/02 4/9102 4/10/02 4/11/02 4/12/02 4/13/02 4/14102 4/15/02 4/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 May 9, 2002 IN Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE 1 HOURS REASON 2 REACTOR 3 REPORT NO.
CODE4 CODE 5 TO PREVENT RECURRENCE 342 020405 F
0.0 A
4 LER 2002-003 EJ BTRY Power reduction from approximately 100% to 40% to replace three 2AB 250V DC Station Battery cells that exhibited indications of cracking.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit 1: Same Source