April 2002 Monthly Operating Report for Donald C. Cook, Units 1 & 2
ML021350187
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/13/2002
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-12
Download: ML021350187 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER May 13, 2002 Docket Nos.

AEP:NRC:2691-12 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P 1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for April 2002 is submitted.

Sincerely, cot Aý. Greenlee Director, Nuclear Technical Services INJ/pae Attachments N,

U. S. Nuclear Regulatory Commission AEP:NRC:2691-12 Page 2 c: ANI Nuclear Engineering Department G. P Arent A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 5/2/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit I Notes:
2. Reporting Period Apr-02
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe:

1056

7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 719.0 2879.0 239567.0
12. No. of Hrs. Reactor Was Critical 719.0 2879.0 162400.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 707.9 2867.9 159773.3
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2245565.4 9214787.4 474720094.4
17. Gross Elect. Energy Gen. (MWH) 722810.0 3006190.0 154239010.0
18. Net Elect. Energy Gen. (MWH) 699099.8 2909764.8 148444058.8
19. Unit Service Factor 98.5 99.6 67.2
20. Unit Availability Factor 98.5 99.6 67.2
21. Unit Capacity Factor (MDC Net) 97.2 101.1 63.5
22. Unit Capacity Factor (DER Net) 95.3 99.1 62.2
23. Unit Forced Outage Rate 1.5 0.4 19.6
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Refueling outage 18 is scheduled to begin during the second quarter of 2002. The proposed length of the

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION n"Mnl' 15-2&2 M.9, 3

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-May-02 RAF Harris 616-465-5901 MONTH Apr-02 AVERAGE DAILY POWER LEVEL DAY 1037 1026 1035 1030 1033 1034 1032 1030 1034 1034 1024 1030 1028 1029 1027 1027 AVERAGE DAILY POWER LEVEL 4/17/02 4/18/02 4119/02 4/20/02 4/21/02 4/22/02 4/23/02 4/24/02 4/25/02 4/26/02 4/27/02 4/28/02 4/29/02 4/30/02 1022 1036 1010 1028 1021 1029 1020 1025 719 156 670 981 956 970 DAY 4/1/02 4/2/02 4/3/02 4/4/02 4/5/02 4/6/02 4/7/02 4/8/02 4/9/02 4/10/02 4/11/02 4/12/02 4/13/02 4/14/02 4/15/02 4/16102

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit I May 9, 2002 N Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE 343 020425 F

11.1 A

4 FK BKR Turbine Generator taken off-line to repair a damaged Breaker K1 disconnect. Reactor remained at 8% power.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSITM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit I: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 512102 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 2 Notes:
2. Reporting Period Apr-02
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 719.0 2879.0
12. No. of Hrs. Reactor Was Critical 719.0 1980.5
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 719.0 1904.3
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2402037.1 6112653.9
17. Gross Elect. Energy Gen. (MWH) 794790.0 2008750.0
18. Net Elect. Energy Gen. (MWH) 770102.0 1944016.7
19. Unit Service Factor 100.0 66.1
20. Unit Availability Factor 100.0 66.1
21. Unit Capacity Factor (MDC Net) 101.0 63.7
22. Unit Capacity Factor (DER Net) 98.3 61.9
23. Unit Forced Outage Rate 0.0 0.5
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Cumm.

213713.0 136085.5 0.0 132306.2 0.0 412940003.2 133835260.0 129009070.6 62.6 62.6 58.1 56.5 24.4

25. If Shut Down At End of Report Period, Est'ed Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-May-02 RAF Harris 616-465-5901 MONTH Apr-02 AVERAGE DAILY POWER LEVEL DAY 1093 1095 1100 1059 511 937 1098 1100 1104 1099 1102 1100 1100 1100 1095 1098 AVERAGE DAILY POWER LEVEL 4/17/02 4/18/02 4/19/02 4/20/02 4/21/02 4/22/02 4/23/02 4124/02 4/25/02 4/26/02 4/27/02 4/28/02 4/29/02 4/30/02 1092 1095 1093 1096 1100 1093 1093 1092 1091 1090 1091 1092 1093 1087 DAY 4/1/02 4/2/02 4/3/02 414/02 415/02 4/6/02 4/7/02 4/8/02 4/9102 4/10/02 4/11/02 4/12/02 4/13/02 4/14102 4/15/02 4/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 May 9, 2002 IN Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE 1 HOURS REASON 2 REACTOR 3 REPORT NO.

CODE4 CODE 5 TO PREVENT RECURRENCE 342 020405 F

0.0 A

4 LER 2002-003 EJ BTRY Power reduction from approximately 100% to 40% to replace three 2AB 250V DC Station Battery cells that exhibited indications of cracking.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT: