ML052350175

From kanterella
Jump to navigation Jump to search
July 2005 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2
ML052350175
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/12/2005
From: Fadel D
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-57
Download: ML052350175 (8)


Text

G=

INDIANA MICHIGAN OIWER' A unit of American Electric Power Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 AEPcom August 12, 2005 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 AEP:NRC:2691-57 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT In accordance with the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for July 2005 is submitted.

There are no new comnmitments associated with this submittal.

Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Supervisor, at (269) 466-2649.

Sincerely, aniel P. Fadel Engineering Vice President JEN/jen Attachment

U. S. Nuclear Regulatory Commission AEP:NRC:2691-57 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. 'Brandon - MDEQ - WHMD/HWRPS D. P. Fadel G. T. Gaffney - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk L. J. Weber J. A. Zwolinski

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 8/5/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Jul-05
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

11. Hours in Reporting Period 744.0
12. No. of Hrs. Reactor Was Critical 744.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 744.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 2455701.6
17. Gross Elect. Energy Gen. (MWH) 769407.0
18. Net Elect. Energy Gen. (MWH) 742952.0
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (MDC Net) 99.9
22. Unit Capacity Factor (DER Net) 97.9
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Yr. to Date 5087.0 4344.8 0.0 4291.4 0.0 13967704.3 4482947.0 4331421.7 84.4 84.4 85.1 83.5 0.0 Cummi.

268079.0 186846.0 463.0 184059.9 321.0 553639762.3 179659670.0 173008183.4 69.1 69.1 65.9 64.6 18.0

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 05-Aug-05 R. Harris 269-465-5901 MONTH Jul-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 7,/1/2005 7/2/2005 7/3/2005 7,/4/2005 7,/5/2005 7./6/2005 7.17/2005 7/8/2005 7/9/2005 7/10/2005 7/11/2005 7/12/2005 7/13/2005 7/14/2005 7/15/2005 7/16/2005 989 996 1013 990 994 1009 1024 1031 1026 1020 1016 1017 1014 1016 995 986 7/17/2005 7/18/2005 7/19/2005 7/20/2005 7/21/2005 7/22/2005 7/23/2005 7/24/2005 7/25/2005 7/26/2005 7/27/2005 7/28/2005 7/29/2005 7/30/2005 7/31/2005 985 988 982 987 971 972 968 965 967 991 1016 1021 1009 998 999

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 August 5, 2005 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - July 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.

CODE4 CODE 5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 8/5/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period Jul-05
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 5087.0 242225.0
12. No. of Hrs. Reactor Was Critical 744.0 5062.0 160811.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Cienerator on Line 744.0 5052.4 156814.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2577099.7 17446759.6 496329097.3
17. Gross Elect. Energy Gen. (MWH) 818600.0 5744210.0 161059778.0
18. Net Elect. Energy Gen. (MWH) 792332.0 5565336.0 155368750.6
19. Unit Service Factor 100.0 99.3 65.4
20. Unit Availability Factor 100.0 99.3 65.4
21. Unit Capacity Factor (MDC Net) 100.5 103.2 61.6
22. Unit Capacity Factor (DER Net) 97.7 100.4 59.9
23. Unit Forced Outage Rate 0.0 0.0 22.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 5-Aug-05 R. Harris 269-465-5901 MONTH Jul-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 7/1/2005 72/2005 7/3/2005 7/4/2005 7/5/2005 7/6/2005 7/7/2005 7/8/2005 7/9/2005 7/10/2005 7,11/2005 7/12/2005 7/13/2005 7/14/2005 7/15/2005 7/16/2005 1059 1076 1071 1066 1062 1069 1092 1103 1103 1100 1075 1086 1081 1089 1061 1057 7/17/2005 7/18/2005 7/19/2005 7/20/2005 7/21/2005 7/22/2005 7/23/2005 7/24/2005 7/25/2005 7/26/2005 7/27/2005 7/28/2005 7/29/2005 7/30/2005 7/31/2005 1054 1052 1043 1039 1039 1044 1034 1026 1044 1043 1080 1095 1064 1050 1057

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 August 5, 2005 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - July 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source