November 2003 Monthly Operating Report for D.C. Cook, Units 1 and 2
ML033530108
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/05/2003
From: Zwolinski J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-37
Download: ML033530108 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER December 5, 2003 AEP:NRC:2691-37 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2003 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Brian D. Mann, Acting Manager of Regulatory Affairs, at (269) 697-5806.

-, Design Engineering and Regulatory Affairs JEN/jen Attachment A

U. S. Nuclear Regulatory Commission AEP:NRC:2691-37 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - MDEQ- WHMD/HWRPS M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center J. N. Jensen B. Lewis - McGraw-Hill Companies D. H. Malin B. D. Mann K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Nov-03
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 8016.0 253464.0
12. No. of Hrs. Reactor Was Critical 125.7 5808.7 173157.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 99.1 5746.7 170435.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 135025.2 18653996.0 508923070.6
17. Gross Elect. Energy Gen. (MWH) 37440.0 6002323.0 165244753.0
18. Net Elect. Energy Gen. (MWH) 33916.6 5799480.4 159074676.9
19. Unit Service Factor 13.8 71.7 67.7
20. Unit Availability Factor 13.8 71.7 67.7
21. Unit Capacity Factor (MDC Net) 4.7 72.3 64.2
22. Unit Capacity Factor (DER Net) 4.6 70.9 62.9
23. Unit Forced Outage Rate 0.0 18.6 19.2
24. Shutdowns Scheduled over Next Six Months (Type,Date,and DurationL
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 03-Dec-03 COMPLETED BY T. Pham TELEPHONE 269-465-5901 MONTH Nov-03 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 11/1/2003 0 11/17/2003 0 11/2/2003 0 11/18/2003 0 11/3/2003 0 11/19/2003 0 11/4/2003 0 11/20/2003 0 11/5/2003 0 11/21/2003 0 11/6/2003 0 11/22/2003 0 11/7/2003 0 11/23/2003 0 11/8/2003 0 11/24/2003 0 11/9/2003 0 11/25/2003 0 11/10/2003 0 11/26/2003 12 11/11/2003 0 11/27/2003 146 11/12/2003 0 11/28/2003 239 11/13/2003 0 11/29/2003 398 11/14/2003 0 11/30/2003 618 11/15/2003 0 11/16/2003 0

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit 1 DATE December 3, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1 HOURS REASON 2 REACTOR3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE 349 031018 S 620.9 C 2 N/A N/A N/A Scheduled refueling outage.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

Ucense Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C.Cook Unit 2 Notes:
2. Reporting Period Nov-03
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur In Capacity Ratings (items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 8016.0 227610.0
12. No. of Hrs. Reactor Was Critical 720.0 6005.7 147573.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 720.0 5930.2 143670.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2495461.8 20115598.6 451339295.9
17. Gross Elect. Energy Gen. (MWH) 823150.0 6570670.0 146344370.0
18. Net Elect. Energy Gen. (MWH) 799063.0 6365971.8 141118711.1
19. Unit Service Factor 100.0 74.0 63.8
20. Unit Availability Factor 100.0 74.0 63.8
21. Unit Capacity Factor (MDC Net) 104.7 74.9 59.6
22. Unit Capacity Factor (DER Net) 101.8 72.9 58.0
23. Unit Forced Outage Rate 0.0 13.9 23.4
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 3-Dec-03 COMPLETED BY T. Pham TELEPHONE 269-465-5901 MONTH Nov-03 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 11/1/2003 1102 11/17/2003 1125 11/2/2003 1106 11/18/2003 1099 11/3/2003 1101 11/19/2003 1111 11/4/2003 1102 11/20/2003 1110 11/5/2003 1106 11/21/2003 1112 11/6/2003 1105 11/22/2003 1104 11/7/2003 1107 11/23/2003 1110 11/8/2003 1110 11/24/2003 1112 11/9/2003 1112 11/25/2003 1113 11/10/2003 1111 11/26/2003 1113 11/11/2003 1109 11/27/2003 1110 11/12/2003 1109 11/28/2003 1112 11/13/2003 1112 11/29/2003 1116 11/14/2003 1113 11/30/2003 1116 11/15/2003 1115 11/16/2003 1115

I DOCKET NO. 50-316 UNIT NAME D.C. Cook Unit 2 DATE December 3, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE None

. k .

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)