MONTHYEARIR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0602503852006-01-13013 January 2006 December 2005 Monthly Operating Report for Donald C. Cook Units 1 & 2 ML0536300452005-12-14014 December 2005 December 2005 Monthly Operating Report for Donald C. Cook, Units 1 and 2 ML0532604202005-11-11011 November 2005 October 2005 Monthly Operating Report for Donald C. Cook Units 1 and 2 ML0529902812005-10-14014 October 2005 September 2005 Monthly Operating Report for Donald C. Cook, Units 1 and 2 ML0527002382005-09-14014 September 2005 August 2005 Monthly Operating Report for Donald C. Cook Units 1 and 2 ML0523501752005-08-12012 August 2005 July 2005 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML0520706942005-07-15015 July 2005 June 2005 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 and 2 ML0517304332005-06-14014 June 2005 May 2005 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML0514403902005-05-13013 May 2005 April 2005 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML0511602202005-04-14014 April 2005 March 2005 Monthly Operating Report for D.C. Cook, Units 1 and 2 ML0508202372005-03-15015 March 2005 February 2005 Monthly Operating Report for Donald C. Cook Nuclear Plant, Units 1 and 2 ML0505406022005-02-15015 February 2005 January 2005 Monthly Operating Report for Donald C. Cook, Units 1 and 2 ML0502601922005-01-12012 January 2005 December 2004 Monthly Operating Report for Donald C. Cook Nuclear Plant, Units 1 and 2 ML0435200892004-12-15015 December 2004 November 2004 Monthly Operating Report for Donald C Cook Nuclear Plant Units 1 and 2 ML0432805992004-11-15015 November 2004 October 2004 Monthly Operating Report for Donald C. Cook Nuclear Plant, Units 1 and 2 ML0429402642004-10-11011 October 2004 September 2004 Monthly Operating Report for Donald C. Cook, Units 1 and 2 ML0426600752004-09-0909 September 2004 August 2004 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 and 2 ML0424506062004-08-11011 August 2004 July 2004 Monthly Report for Donald C. Cook Nuclear Plant Units 1 and 2 AEP-NRC-2691-44, June 2004 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 and 22004-07-12012 July 2004 June 2004 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 and 2 ML0416901372004-06-10010 June 2004 May 2004 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 and 2 ML0414103092004-05-14014 May 2004 April 2004 Monthly Operating Report for Donald C. Cook, Unit Nos. 1 and 2 ML0411203622004-04-14014 April 2004 March 2004 Monthly Operating Report for Donald C. Cook, Units 1 & 2 ML0407806212004-03-0909 March 2004 February 2004 Monthly Operating Report for Donald C. Cook, Units 1 and 2 ML0404904732004-02-10010 February 2004 January 2004 Monthly Operating Report for D.C. Cook, Units 1 and 2 ML0402905472004-01-14014 January 2004 December 2003 Monthly Operating Report for Donald C Cook Units 1 and 2 ML0335301082003-12-0505 December 2003 November 2003 Monthly Operating Report for D.C. Cook, Units 1 and 2 ML0332800262003-11-14014 November 2003 October 2003 Monthly Operating Report for D C Cook Units 1 and 2 ML0329504582003-10-15015 October 2003 September 2003 Monthly Operating Report for Donald C. Cook, Units 1 & 2 ML0326709912003-09-15015 September 2003 August 2003 Monthly Operating Report for D.C. Cook, Units 1 and 2 ML0323406442003-08-15015 August 2003 July 2003 Monthly Operating Report for Donald C. Cook, Units 1 & 2 ML0320400552003-07-12012 July 2003 June 2003 Monthly Operating Report for Donald C. Cook, Units 1 & 2 ML0316900252003-06-13013 June 2003 May 2003 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 & 2 ML0313900242003-05-15015 May 2003 April 2003 Monthly Operating Report for Donald C. Cook Units 1 & 2 ML0310704352003-04-11011 April 2003 March 2003 Monthly Operating Report for Donald C. Cook Nuclear Plant, Units 1 & 2 ML0307705772003-03-14014 March 2003 February 2003 Monthly Operating Report for Donald C. Cook Units 1 & 2 ML0305804672003-02-14014 February 2003 January 2003 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 & 2 ML0301701792003-01-15015 January 2003 December 2002 Monthly Operating Report for Donald C. Cook ML0235200332002-12-13013 December 2002 November 2002 Monthly Operating Report for Donald C. Cook Units 1 & 2 ML0232201872002-11-15015 November 2002 October 2002 Monthly Operating Report for Donald C Cook ML0228901292002-10-15015 October 2002 September 2002 Monthly Operating Report for Donald C. Cook, Units 1 and 2 ML0226101762002-09-13013 September 2002 August 2002 Monthly Operating Report for Donald C. Cook ML0223102782002-08-15015 August 2002 July 2002 Monthly Operating Report for Donald C. Cook Nuclear Plant, Units 1 and 2 ML0213501872002-05-13013 May 2002 April 2002 Monthly Operating Report for Donald C. Cook, Units 1 & 2 ML0210600872002-04-12012 April 2002 March 2002 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 and 2 ML0209205732002-03-15015 March 2002 February 2002 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 & 2 ML0205100262002-02-14014 February 2002 January 2002 Monthly Operating Report for Donald C. Cook, Units 1 & 2 ML0201800082002-01-11011 January 2002 December 2001 Monthly Operating Report for Donald C. Cook Units 1 and 2 2006-01-13
[Table view] |
Text
Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER December 5, 2003 AEP:NRC:2691-37 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for November 2003 is submitted.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Brian D. Mann, Acting Manager of Regulatory Affairs, at (269) 697-5806.
-, Design Engineering and Regulatory Affairs JEN/jen Attachment A
U. S. Nuclear Regulatory Commission AEP:NRC:2691-37 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - MDEQ- WHMD/HWRPS M. J. Finissi G. T. Gaffney - Canton J. B. Giessner INPO Records Center J. N. Jensen B. Lewis - McGraw-Hill Companies D. H. Malin B. D. Mann K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski
N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1 Notes:
- 2. Reporting Period Nov-03
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo. Yr. to Date Cumm.
- 11. Hours in Reporting Period 720.0 8016.0 253464.0
- 12. No. of Hrs. Reactor Was Critical 125.7 5808.7 173157.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
- 14. Hours Generator on Line 99.1 5746.7 170435.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
- 16. Gross Therm. Energy Gen. (MWH) 135025.2 18653996.0 508923070.6
- 17. Gross Elect. Energy Gen. (MWH) 37440.0 6002323.0 165244753.0
- 18. Net Elect. Energy Gen. (MWH) 33916.6 5799480.4 159074676.9
- 19. Unit Service Factor 13.8 71.7 67.7
- 20. Unit Availability Factor 13.8 71.7 67.7
- 21. Unit Capacity Factor (MDC Net) 4.7 72.3 64.2
- 22. Unit Capacity Factor (DER Net) 4.6 70.9 62.9
- 23. Unit Forced Outage Rate 0.0 18.6 19.2
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and DurationL
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO. 50-315 UNIT ONE DATE 03-Dec-03 COMPLETED BY T. Pham TELEPHONE 269-465-5901 MONTH Nov-03 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 11/1/2003 0 11/17/2003 0 11/2/2003 0 11/18/2003 0 11/3/2003 0 11/19/2003 0 11/4/2003 0 11/20/2003 0 11/5/2003 0 11/21/2003 0 11/6/2003 0 11/22/2003 0 11/7/2003 0 11/23/2003 0 11/8/2003 0 11/24/2003 0 11/9/2003 0 11/25/2003 0 11/10/2003 0 11/26/2003 12 11/11/2003 0 11/27/2003 146 11/12/2003 0 11/28/2003 239 11/13/2003 0 11/29/2003 398 11/14/2003 0 11/30/2003 618 11/15/2003 0 11/16/2003 0
DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit 1 DATE December 3, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1 HOURS REASON 2 REACTOR3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE 349 031018 S 620.9 C 2 N/A N/A N/A Scheduled refueling outage.
1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:
F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)
Ucense Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)
N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 12/3/2003 COMPLETED BY T. Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C.Cook Unit 2 Notes:
- 2. Reporting Period Nov-03
- 3. Licensed Thermal Power (MWt) 3468
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur In Capacity Ratings (items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo. Yr. to Date Cumm.
- 11. Hours in Reporting Period 720.0 8016.0 227610.0
- 12. No. of Hrs. Reactor Was Critical 720.0 6005.7 147573.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 720.0 5930.2 143670.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2495461.8 20115598.6 451339295.9
- 17. Gross Elect. Energy Gen. (MWH) 823150.0 6570670.0 146344370.0
- 18. Net Elect. Energy Gen. (MWH) 799063.0 6365971.8 141118711.1
- 19. Unit Service Factor 100.0 74.0 63.8
- 20. Unit Availability Factor 100.0 74.0 63.8
- 21. Unit Capacity Factor (MDC Net) 104.7 74.9 59.6
- 22. Unit Capacity Factor (DER Net) 101.8 72.9 58.0
- 23. Unit Forced Outage Rate 0.0 13.9 23.4
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO. 50-316 UNIT TWO DATE 3-Dec-03 COMPLETED BY T. Pham TELEPHONE 269-465-5901 MONTH Nov-03 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 11/1/2003 1102 11/17/2003 1125 11/2/2003 1106 11/18/2003 1099 11/3/2003 1101 11/19/2003 1111 11/4/2003 1102 11/20/2003 1110 11/5/2003 1106 11/21/2003 1112 11/6/2003 1105 11/22/2003 1104 11/7/2003 1107 11/23/2003 1110 11/8/2003 1110 11/24/2003 1112 11/9/2003 1112 11/25/2003 1113 11/10/2003 1111 11/26/2003 1113 11/11/2003 1109 11/27/2003 1110 11/12/2003 1109 11/28/2003 1112 11/13/2003 1112 11/29/2003 1116 11/14/2003 1113 11/30/2003 1116 11/15/2003 1115 11/16/2003 1115
I DOCKET NO. 50-316 UNIT NAME D.C. Cook Unit 2 DATE December 3, 2003 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE None
. k .
1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:
F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)
License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)