October 2002 Monthly Operating Report for Donald C Cook
ML023220187
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/15/2002
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-24
Download: ML023220187 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER November 15, 2002 AEP:NRC:2691-24 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for October 2002 is submitted.

Sincerely, ctA. Greenle Director, Nuclear Technical Services BWO/jen Attachments

U. S. Nuclear Regulatory Commission AEP:NRC:2691-24 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 11/4/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit I Notes:
2. Reporting Period Oct-02
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe: 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 745.0 7296.0 243984.0
12. No. of Hrs. Reactor Was Critical 745.0 6363.3 165884.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 745.0 6319.5 163224.9
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2405598.0 20115443.4 4856207504
17. Gross Elect. Energy Gen. (MWH) 780400.0 6490050.0 157722870.0
18. Net Elect. Energy Gen. (MWH) 754368.0 6272484.6 151806778.5
19. Unit Service Factor 100.0 866 67.4
20. Unit Availability Factor 100 0 86 6 67.4
21. Unit Capacity Factor (MDC Net) 101.3 86.0 63.7
22. Unit Capacity Factor (DER Net) 99.3 84.3 62.4
23. Unit Forced Outage Rate 0.0 1.5 19.3
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 11/4/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 2 Notes:
2. Reporting Period Oct-02
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

745.0 7296.0 218130.0

11. Hours in Reporting Period 745.0 5999.1 140104.1
12. No. of Hrs. Reactor Was Critical 00 0.0 00
13. Reactor Reserve Shutdown Hours 745.0 5874.6 136276.5
14. Hours Generator on Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 2535385.4 19405861.2 426233210.5
16. Gross Therm. Energy Gen. (MWH) 826980.0 6283120.0 138109630.0
17. Gross Elect. Energy Gen. (MWH) 800342.0 6075919.4 133140973.3
18. Net Elect. Energy Gen. (MWH) 100.0 80.5 63.1
19. Unit Service Factor 100.0 80.5 63.1
20. Unit Availability Factor 101.3 78.6 58 8
21. Unit Capacity Factor (MDC Net) 98.6 764 57.1
22. Unit Capacity Factor (DER Net) 7.2 24.0
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Ested Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 04-Nov-02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 MONTH Oct-02 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 10/1/02 1003 10/17/02 1028 10/2/02 999 10/18/02 1027 10/3/02 1002 10/19/02 1027 10/4/02 1012 10/20/02 1025 10/5/02 947 10/21/02 1021 10/6/02 886 10/22/02 1029 10/7/02 1010 10/23/02 1029 10/8/02 1011 10/24/02 1030 10/9/02 1020 10/25/02 1030 10/10/02 1005 10/26/02 1027 10/11/02 1014 10/27/02 1030 10/12/02 1013 10/28/02 1026 10/13/02 1023 10/29/02 1035 10/14/02 1023 10/30/02 1032 10/15/02 1015 10/31/02 1031 10/16/02 1024

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT 1TWO DATE 4-Nov-02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 MONTH Oct-02 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 10/1/02 1062 10/17/02 1089 10/2/02 1052 10/18102 1077 10/3/02 1054 10/19/02 1080 10/4/02 1061 10/20/02 1074 10/5/02 1065 10/21/02 1079 10/6/02 1063 10/22/02 1087 10/7/02 1072 10/23/02 1081 10/8/02 1071 10/24/02 1087 1019/02 1056 10/25/02 1092 10/10/02 1061 10/26/02 1087 10/11/02 1067 10/27/02 1089 10/12/02 1063 10/28/02 1088 10/13102 1077 10/29/02 1094 10/14/02 1069 10/30/02 1099 10/15102 1074 10/31/02 1099 10/16/02 1081

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit 1' DATE November 6, 2002 COMPLETED BY B. O'Rourke TELEPHONE 616-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE None 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

DOCKET NO. 50-316 UNIT NAME D.C. Cook Unit 2 DATE November 6, 2002 COMPLETED BY B. O'Rourke TELEPHONE 616-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE None 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)