October 2002 Monthly Operating Report for Donald C Cook
ML023220187
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/15/2002
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-24
Download: ML023220187 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER November 15, 2002 AEP:NRC:2691-24 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-Pl-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for October 2002 is submitted.

Sincerely, ctA. Greenle Director, Nuclear Technical Services BWO/jen Attachments

U. S. Nuclear Regulatory Commission AEP:NRC:2691-24 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 11/4/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit I Notes:
2. Reporting Period Oct-02
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe:

1056

7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 745.0 7296.0
12. No. of Hrs. Reactor Was Critical 745.0 6363.3
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 745.0 6319.5
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2405598.0 20115443.4
17. Gross Elect. Energy Gen. (MWH) 780400.0 6490050.0
18. Net Elect. Energy Gen. (MWH) 754368.0 6272484.6
19. Unit Service Factor 100.0 866
20. Unit Availability Factor 100 0 86 6
21. Unit Capacity Factor (MDC Net) 101.3 86.0
22. Unit Capacity Factor (DER Net) 99.3 84.3
23. Unit Forced Outage Rate 0.0 1.5
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.

243984.0 165884.6 463.0 163224.9 321.0 4856207504 157722870.0 151806778.5 67.4 67.4 63.7 62.4 19.3

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 11/4/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 2 Notes:
2. Reporting Period Oct-02
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 745.0 7296.0
12. No. of Hrs. Reactor Was Critical 745.0 5999.1
13. Reactor Reserve Shutdown Hours 0 0 0.0
14. Hours Generator on Line 745.0 5874.6
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2535385.4 19405861.2
17. Gross Elect. Energy Gen. (MWH) 826980.0 6283120.0
18. Net Elect. Energy Gen. (MWH) 800342.0 6075919.4
19. Unit Service Factor 100.0 80.5
20. Unit Availability Factor 100.0 80.5
21. Unit Capacity Factor (MDC Net) 101.3 78.6
22. Unit Capacity Factor (DER Net) 98.6 764
23. Unit Forced Outage Rate 0.0 7.2
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Ested Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.

218130.0 140104.1 00 136276.5 0.0 426233210.5 138109630.0 133140973.3 63.1 63.1 58 8 57.1 24.0

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 04-Nov-02 RAF Harris 616-465-5901 MONTH Oct-02 AVERAGE DAILY POWER LEVEL 1003 999 1002 1012 947 886 1010 1011 1020 1005 1014 1013 1023 1023 1015 1024 DAY 10/17/02 10/18/02 10/19/02 10/20/02 10/21/02 10/22/02 10/23/02 10/24/02 10/25/02 10/26/02 10/27/02 10/28/02 10/29/02 10/30/02 10/31/02 AVERAGE DAILY POWER LEVEL 1028 1027 1027 1025 1021 1029 1029 1030 1030 1027 1030 1026 1035 1032 1031 DAY 10/1/02 10/2/02 10/3/02 10/4/02 10/5/02 10/6/02 10/7/02 10/8/02 10/9/02 10/10/02 10/11/02 10/12/02 10/13/02 10/14/02 10/15/02 10/16/02

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 1TWO 4-Nov-02 RAF Harris 616-465-5901 MONTH Oct-02 AVERAGE DAILY POWER LEVEL 1062 1052 1054 1061 1065 1063 1072 1071 1056 1061 1067 1063 1077 1069 1074 1081 DAY AVERAGE DAILY POWER LEVEL 10/17/02 10/18102 10/19/02 10/20/02 10/21/02 10/22/02 10/23/02 10/24/02 10/25/02 10/26/02 10/27/02 10/28/02 10/29/02 10/30/02 10/31/02 1089 1077 1080 1074 1079 1087 1081 1087 1092 1087 1089 1088 1094 1099 1099 DAY 10/1/02 10/2/02 10/3/02 10/4/02 10/5/02 10/6/02 10/7/02 10/8/02 1019/02 10/10/02 10/11/02 10/12/02 10/13102 10/14/02 10/15102 10/16/02

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1' November 6, 2002 B. O'Rourke 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 November 6, 2002 B. O'Rourke 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.

CODE 4 CODE 5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit I: Same Source