Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:UTILITY
MONTHYEARIR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl IR 05000528/19860351986-12-30030 December 1986 Partially Withheld Insp Repts 50-528/86-35 & 50-529/86-35 on 861110-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Allegation RV-85-A-0068 Re Coverup of Investigation IR 05000528/19860291986-11-25025 November 1986 Insp Repts 50-528/86-29 & 50-529/86-28 on 861027-31.No Significant Deficiencies or Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise & Associated Critiques IR 05000528/19860271986-09-26026 September 1986 Insp Repts 50-528/86-27,50-529/86-26 & 50-530/86-20 on 860804-0907.No Violations Noted.Major Areas Inspected: Followup of Previously Identified Items,Review of Plant Activities,Plant Tours & Engineered Safety Sys Walkdowns IR 05000528/19860191986-07-0202 July 1986 Insp Repts 50-528/86-19,50-529/86-19 & 50-530/86-13 on 860527-0613.No Violation or Deviation Noted.Major Areas Inspected:Open Items in Units 1 & 2,LERs in Unit 1,IE Bulletins & Generic Ltrs IR 05000528/19860141986-04-30030 April 1986 Partially Deleted Enforcement Conference Repts 50-528/86-14 & 50-529/86-14 on 860410.Major Areas Discussed:Violations Re Security Noted in Insp Repts 50-528/86-07 & 50-529/86-06,NRC Concerns & Licensee Corrective Actions ML20205M5101986-04-0202 April 1986 Partially Deleted Insp Repts 50-528/86-07 & 50-529/86-06 on 860211-0313.Noncompliances Noted:Vital Area Not Limited Only to Authorized Individuals,Failure to Respond to Vital Area Alarms & Vital Area Barriers Not Adequately Maintained IR 05000528/19860011986-01-21021 January 1986 Insp Repts 50-528/86-01,50-529/86-01 & 50-530/86-01 on 860106-10.No Violation or Deviation Identified.Major Areas Inspected:Tmi Action Plan Items & Operational Safety in Unit 2 & 100% Load Rejection Test in Unit 1 IR 05000528/19850341985-11-26026 November 1985 Insp Repts 50-528/85-34 & 50-529/85-34 on 850927-28 & 0930-1004.No Violation or Deficiencies Noted.Major Areas Inspected:Emergency Preparedness Program,Including Emergency Plan Training,Emergency Facilities & Equipment IR 05000528/19850411985-11-13013 November 1985 Insp Repts 50-528/85-41,50-529/85-35,50-530/85-25 & 70-2984/85-03 on 851003-04,15-29,07-11 & 30-31.No Noncompliance or Deviation Noted.Major Areas Inspected: Preoperational Test Program for Radiation Protection IR 05000528/19850371985-11-13013 November 1985 Insp Repts 50-528/85-37,50-529/85-37 & 50-530/85-27 on 850923-1104.No Violation or Deviation Noted.Major Areas Inspected:Action on NRC Enforcement Item & Quality Records Re safety-related Piping & Components IR 05000528/19850401985-11-0707 November 1985 Insp Repts 50-528/85-40 & 50-529/85-39 on 851015-1101.No Violations or Deviations Noted.Major Areas Inspected: Operational Staffing,Design Changes,Tmi Action Plan Items, IE circulars,10CFR55.55(e) Items & Surveillance Testing IR 05000528/19850351985-10-23023 October 1985 Matl Control & Accounting Insp Rept 50-528/85-35 on 851007- 10.No Violations Noted.Major Areas Inspected:Followup on Inspector Identified Problem & Unresolved Items.Details Withheld (Ref 10CFR2.790) IR 05000529/19850361985-10-18018 October 1985 Insp Rept 50-529/85-36 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Implementation of TMI Action Plan Items & Followup of 50.55(e) Repts IR 05000528/19850331985-10-16016 October 1985 Insp Repts 50-528/85-33 & 50-529/85-33 on 850916-27.No Violation or Deviation Noted.Major Areas Inspected:Tmi Action Plan Items,Ie Bulletins & Circulars,Action on Inspector Identified Items & Temporary Mods IR 05000529/19850291985-10-11011 October 1985 Insp Repts 50-529/85-29 & 50-530/85-23 on 850923-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Program & Implementation W/Emphasis on Changes Made to Program During 1984 & 1985 IR 05000529/19850321985-10-11011 October 1985 Insp Repts 50-529/85-32 & 50-530/85-24 on 850916-19 & 0930-1004.No Violations or Deviations Noted.Major Areas Inspected:Nde of Piping,Structural Steel & Supports & Review of RCPB Piping Records IR 05000528/19850281985-10-0808 October 1985 Insp Repts 50-528/85-28,50-529/85-28 & 50-530/85-22 on 850807-0922.No Violation or Deviation Noted.Major Areas Inspected:Instrument components,safety-related Structures & Closure of Allegation RV-85-A-033 IR 05000528/19850261985-09-25025 September 1985 Insp Repts 50-528/85-26 & 50-529/85-27 on 850801-0908. Violations Noted:Failure to Properly Verify Closure of Unit 1 Doors & Tech Spec Overtime Limits Exceeded W/O Approval by Plant Manager or Designee IR 05000530/19850201985-08-28028 August 1985 Insp Rept 50-530/85-20 on 850729-0802 & 12-16.No Violation or Deviation Noted.Major Areas Inspected:Activities Re Instrument Components & Sys IR 05000528/19850271985-08-28028 August 1985 Enforcement Conference Rept 50-528/85-27 on 850808.Major Areas Discussed:Problems Associated W/Implementation of post-accident Sampling Sys Required by NUREG-0737,Item II.B.3 IR 05000528/19850291985-08-22022 August 1985 Insp Repts 50-528/85-29,50-529/85-26 & 50-530/85-21 on 850805-16.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration,Qa Audits,Document Control Maint,Temporary Mods,Tests & Experiments IR 05000528/19850231985-08-13013 August 1985 Insp Repts 50-528/85-23,50-529/85-24 & 50-530/85-18 on 850630-0806.No Violation or Deviation Noted.Major Areas Inspected:Observation of Work Re Electrical Cable Installation & Terminations in Unit 3 IR 05000528/19850201985-08-0909 August 1985 Insp Rept 50-528/85-20 on 850603-07.No Violation Noted.Major Areas Inspected:Program Plan,Procedures & Records Re Inservice Testing Program for Pumps & Valves & Insp Procedure 61700 IR 05000528/19850211985-08-0808 August 1985 Insp Repts 50-528/85-21 & 50-529/85-22 on 850603-0731. Violation Noted:Failure to Submit LER within 30 Days of Event IR 05000522/20060051985-08-0606 August 1985 Enhanced Team Insp Rept 50-528/85-12 on 850522-0605 & 0716. No Violations Noted.Major Areas Inspected:Operating Crews & Operational Support Activities During Initial Startup & Low Power Testing IR 05000528/19850251985-08-0101 August 1985 Insp Rept 50-528/85-25 on 850624-0724.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Ler/Deficiency Evaluation Rept Interface,Power Ascension Test Data at 20% Power Plateau & Control Room Activities IR 05000428/20060291985-07-19019 July 1985 Insp Repts 50-528/85-17,50-529/85-19 & 50-530/85-13 on 850428-0629.No Violation or Deviation Noted.Major Areas inspected:as-built Configuration & Documentation of Unit 2 Main Steam Supply Sys IR 05000529/19850251985-07-0505 July 1985 Insp Repts 50-529/85-25 & 50-530/85-19 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Action on IE Circulars,Followup of Previously Identified Items, Const Deficiencies & Observation of Hot Functional Testing ML20132D5421985-07-0303 July 1985 Emergency Preparedness Insp Rept 50-528/85-10 on 850429-0503 & 13-17.Violation Noted:Failure to Provide Initial Training & Annual Retraining to Employees IR 05000429/20060021985-07-0202 July 1985 Insp Repts 50-528/85-13 & 50-529/85-17 on 850429-0602.No Violation Noted.Major Areas Inspected:Plant Activities, Surveillance Testing,Plant Maint,Preoperational Testing Activities & Allegations & Commitment Followup IR 05000528/19850191985-07-0101 July 1985 Insp Repts 50-528/85-19,50-529/85-21 & 50-530/85-15 on 850513-17.No Violation or Deviation Noted.Major Areas Inspected:Activities Associated W/Implementation of Selected TMI Action Items & Routine Followup of Allegations IR 05000528/19850181985-06-28028 June 1985 Insp Repts 50-528/85-18,50-529/85-20 & 50-530/85-14 on 850513-24.No Violation or Deviation Noted.Major Areas Inspected:License Conditions & Commitments,Lers,Const Deficiencies,Ie Bulletins & TMI Action Plan Items IR 05000530/19850161985-06-10010 June 1985 Insp Rept 50-530/85-16 on 850513-17 & 28-30.No Violations or Deviations Noted.Major Areas Inspected:Steel Structures & Supports,Reactor Coolant Loop Piping & Reactor Vessel & Internals Documentation IR 05000529/19850141985-05-0808 May 1985 Insp Repts 50-529/85-14 & 50-530/85-09 on 850325-29. Violation Noted:Welding of New Fuel Storage Racks.Deviation Noted:Procurement of New Fuel Storage Racks IR 05000528/19840141984-05-11011 May 1984 IE Insp Repts 50-528/84-14 & 50-529/84-11 on 840402-30.No Noncompliance Noted.Major Areas Inspected:Startup Testing & Noncompliance Followup 1989-09-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures ML20196D6391998-11-20020 November 1998 Notice of Violation from Insp on 981019-24.Violation Noted: Licensee Submitted Physical Security Plan Rev 40 Which Contained 10 Changes to Physical Security Plan That Decreased Safeguard Effectiveness of Plan ML20236N0381998-07-10010 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:On or About 980310, Unit 3 Operators Failed to Demonstrate Operability of Operable Offsite Power Circuits IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) ML20138C1071997-04-22022 April 1997 Notice of Violation from Insp on 970317-21.Violation Noted:Safeguards Documents Discovered Outside Protected Area Unsecured in Terminated Employee Desk IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IA-98-273, Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant1994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20236U9511994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms ML20057C5941993-09-0909 September 1993 Notice of Violation from Insp on 930621-0709.Violation Noted:Despite Licensee Chemistry Manager Receipt of from Combustion Engineering Identifying Potential for Dilution of Sample,Licensee Failed to Establish Measures IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power1993-08-30030 August 1993 PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee1993-08-11011 August 1993 PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8501993-07-0101 July 1993 Notice of Violation from Insp on 930427-0531.Violation Noted:Licensee Failed to Meet Surveillance Requirements for Testing Snubbers in Plants ML20056C8451993-07-0101 July 1993 Notice of Violation from Insp on 930426-0514.Violation Noted:Sgtr Event Involving RCS Leakage Greater than 44 Gpm & Previous Condition Involving RCS Leakage Greater than Charging Pump Capacity,Not Classified as SAE ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined1993-03-25025 March 1993 PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage ML20127B0961992-12-22022 December 1992 Notice of Violation from Insp on 921026-30 & 1116-20. Violation Noted:On 921110,procedures Were Not Adhered to in That Survey Not Performed or Documented to Illustrate Impact of Cumulative Dose Rates IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items ML20126E0241992-12-0808 December 1992 Notice of Violation from Insp on 921005-09.Violation Noted: Licensee Lost All Meteorological Instrumentation for Approx 7 H But Failed to Declare Unusual Event within 30 Minutes of Loss of Instrumentation on 920822 ML20126B9031992-12-0404 December 1992 Notice of Violation from Insp on Stated Date.Violation Noted:Boric Acid Make Up Pump Discharge Check Valves CHN-V154 & CHN-155 Were Not in Licensee IST Program & Were Not Being Tested Individually IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI 1999-06-30
[Table view] |
Text
_ - -
'
.
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report Nos: 50-528/85-21, 50-529/85-22 Docket Nos: '50-528, 50-529 License Nos: NPF-41; CPPR-142 Licensee: Arizona Nuclear Power Project P. O. Box'52034 Phoenix, AZ. 85072-2034 Facility Name: Palo Verde Nuclear Generating Station Units 1 &-2 Inspection Conducted; Jqne r gh Ju 31, 1985 Inspectors: ) (A/ h ($
R. Ziffnmerman, Sedfo Date Signed b
.
Reside nweg
- d G. Pi6t lli, [/
p q
3 4%C Date Signed Reside ispg /
C. Ifo thd, aUd &_ ;/
~
Ms Date Signed Resi ent Ing c
Approved By': 6 '
L Date Signed R[/tiiller, Chi, eJ,'Section eactor Projects 2'
Summary:
Inspection on June 3 - July 31, 1985'(Report Nos. 50-528/85-21 and 50-529/85-22)
Areas Inspected: Routine, onsite, regular and backshift inspection by the i three resident inspectors (Unit 1'-'326.'hou'rs; Unit 2 - 233 hours0.0027 days <br />0.0647 hours <br />3.852513e-4 weeks <br />8.86565e-5 months <br />). Areas inspected included: review of plant activities; surveillance testing; plant maintenance; preoperational testing activities; fire team training and staffing; Unit I license commitment followup; enginsered safety features configurations; microbiological corrosion inspection; IE Information Notice followup; Temporary Instruction 2515/67 followup; Generic Letter 85-05 followup; 10 CFR Part 21 followup; in-office Licensee Event Report review; periodic and special report review and plant' tour During this inspection the following Inspection Procedures were covered:
30703, 41700, 61700, 61726, 62703, 70304, 70306, 70308-, 70312, 70314, 70325,
~70349, 70437, 70438, 70441, 70447, 70449, 70450, 70451, 70549, 70553, 71302, 71707, 71710, 97012, 90713, 92701, 92704, 92705, 93701, 93702, 9470 ,Results: Of the fourteen areas inspected, one violation was identifie (Failure ~to submit a Licensee Event Report within thirty days of cvent discovery - paragraph 8).
8508230276 850808 PDR G ADOCK 05000528 PDR
.
.
.
DETAILS Persons Contacted:
The below listed technical and supervisory personnel were among those contacted:
Arizona Nuclear Power Project (ANPP)
R. Adney, Operations Superintendent, Unit 2 J. Allen, Operations Manager J. R. Bynum, PVNGS Plant Manager J. Donahue, Shift Test Director Supervisor
. Fernow, Plant Services Manager J. Haynes, Vice. President, Nuclear Production R. Gouge, Operations Supervisor, Unit 1
- W. E. Ide, Corporate Quality Assurance Manager
- D. B. Karner, Assistant Vice President, Nuclear Production
- R. Meyer, Fire Protection Supervisor D. Nelson, Operations Security Manager R. Nelson, Maintenance Manager J. Pollard, Operations Supervisor, Unit 2
- C. Russo, Quality Audits Manager T. Shriver, Quality Systems and Engineering Manager L. Souza, Assistant Quality Assurance Manager E. E. Van Brunt, Jr. , Executive Vice President R. Younger, Operations Superintendent, Unit 1 0. Zeringue, Technical Support Manager The inspectors also talked with other licensee and contractor personnel during the course of the inspectio * Attended the Exit Meeting on July 12, 198 . Previously Identified Items (Closed) Inspector Followup Item (50-528/84-18-04): Low Pressure Safety Injection (LPSI) and Containment Spray (CS) anomalous noise at specific flow rate A low frequency " rumbling" noise was detected when flow was
.
throttled through the LPSI pumps in the 3000 - 3400 gpm range and CS pumps in the 2400 - 2800 gpm range. An engineering evaluation was performed by the licensee to determine the cause of th'e noise and whether a potential problem existe The results of the licensee's evaluation were submitted to the NRC staff by letter dated September 26, 1984. After reviewing the engineering evaluation the staff concurred with the licensee that the LPSI and CS pumps were capable of' carrying out their intended safety functions without requiring any modification Further details are documented in the Safety Evaluation Report, Supplement 7, related to the operation of Palo Verde Nuclear
_ _ _ _ _
. 2
.
.
Generating Station; Units 1, 2 and 3, dated December l'84, 9 (pages 14.5 and 14.6).
This item is close (Closed) Inspector Followup Item (50-528/84-63-01): Loss of headset parts during fuel loading activitie An operator's. headset came apart while the operator was on the Spent Fuel Machine above the transfer canal in the Unit 1 Fuel Buildin Two plastic washers (1/4"_and 1 1/16" diameters) and a 1/4" stainless steel screw were unaccounted for,'following several searches by the licensee, both prior to and following draining the canal. An Engineering Evaluation Report (EER) was prepared by the licensee in which the potential damage was assessed in.the event that the missing parts were transported into the RCS while loading a fuel assembl The. inspector. reviewed EER 85-FH-005 which determined that no thermodynamic or chemistry problems would result. Potential fretting wear to a fuel rod by the metal screw was determined to result in less'than the 1% failed fuel assumption in the Final Safety Analysis Repor This item is close (Closed) Inspector Followup Item (50-528/84-63-03): Radwaste reduction through housekeepin During previous tours of various equipment rooms in the Unit 1 Auxiliary and Radwaste Buildings, prior to initial criticality, a substantial amount of miscellaneous tools and equipment such as ladders, welding cable, temporary lights, mops, and buckets were stored in areas which would soon be in the Radiological Controlled Area (RCA), and become a potential radwaste proble During the current inspection period, the inspector verified by routine tours in the above areas, and through discussions with Radiation Protection management, that the rooms in the Fuel, Auxiliary, and Radwaste buildings had been cleaned, all nonrequired materials had been removed, and radiation protection personnel had been instructed to report any future miscellaneous equipment to Radiation Protection management ~.
This item is closed'. (Closed) Inspector Followup Item (50-528/84-63-04): The licensee committed to proceduralize color coded bag control prior to initial criticalit The inspector verified that prior to criticality, a Radwaste Department instruction had been written, implemented, and was in
- effect, requiring the use of colored bags for radioactive contaminated material _
.
-
.
.
At the close of the current inspection period, a plant policy on waste segregation ha.d been proposed, written and was in the final stages of implementation. The policy formalized the practice of using yellow colored poly bags for radioactive contaminated material and green colored bags for non-contaminated material The inspector reviewed the proposed plant policy and observed the proper use of the colored bags during plant tour Thi's item is close . Review of Plant Activities Units 1 and 2 Unit 1 At the start of the reporting period, Unit I was in Mode 2 performing low power physics testing. This was completed on June 4, 1985. On June 6, 1985, the plant entered Mode 1 for the first tim On June 14, the reactor tripped from 20% power on high pressurizer pressure following a manual turbine trip and a main feedwater pump (MFP) trip on low suction pressure. The MFP trip was determined to be caused by one of the operating main condensate pumps tripping from a loose condensate pump valve position switch. This caused a low feed pump suction pressure because the mini-recirculation valve on the operating condensate pump failed to close down as total condensate flow decreased. These problems were corrected, and power was returned to 20% for the completion of the 20% power plateau testing. Power was increased to 30% and then 40% as the next plateau of 50% was approache On July 1, 1985, the reactor again tripped on high pressurizer
. pressure from 42% power, followin'g a loss of a main feedwater pump and a manual turbine trip. The MFP tripped on low suction pressure during a feedwater perturbatio Further trouble shooting revealed that the low suction pressure condition was aggravated by
,
construction filters in the MFP suction lines which had 40-50 psid
'
across the filters. The filters were removed and changed. The plant subsequently' achieved 50% full power on July 6, 1985.
- On July 11, 1985 at 8
- 30 AM an Unusual Event was declared in
.
'
accordance with plant procedures, when efforts to locate a calculated reactor coolant system leakage in excess of Technical
,
Specification 3.4.5.2 proved unsuccessful, and a plant shutdown to Mode 3 was initiated in accordance with the associated Technical i Specification Action Statement. The calculated unidentified RCS l leak rate was a constant 1.2 gpm. Technical Specification 3.4.5.2 l limits unidentified leakage to 1.0 gpm. The unit entered Mode 3 at 1:31 PM and efforts continued unsuccessfully to identify the source of leakage. The Unusual Event was terminated at 9:28 PM when unidentified leakage was calculated to be .88 gpm. No apparent explanation for the decrease in RCS unidentified leakage was evident. 'With the plant remaining in Mode 3, steps were taken on July 12 and 13 to refine the method of calculating the wa'ter balance inventory for the RCS. Additionally, instrument accuracies used in
. - - - . . _ . .-. _ .- - - . _ -
.
- 4
.
.
the water balance calculation were verified and system walkdowns to identify RCS leakage paths continued with no problems identifie .On July 14 at 10:00 PM the unit was taken critical after successive RCS leakage calculations confirmed Technical Specification compliance. Power was restored to the 50% testing plateau on July 16. On July 17 at 3:40 PM a reactor trip occurred when a faulty memory load in Control Element Assembly Calculator #2 generated erroneous penalty factors to the Core Protection Calculato On July 18 at 10:10 PM, the reactor was taken critical, and power was again restored to the 50% testing plateau on July 1 On July 22 at 7:05 AM, a circulating water leak into the main condenser was observed by increases in conductivity and hotwell level. A load reduction to Mode 2 (2-3% power) was begun at 8:30 AM for steam generator chemistry considerations. On July 23 at 2:00 AM, with the plant in Mode 2, RCS unidentified leakage was again calculated to exceed the Technical Specification limit (1.16 gpm).
The licensee was unable to identify the source of leakage and a reactor shutdown was commenced with the unit achieving cold shutdown on July 24, 1985, at 6:54 A Licensee inspection of the "A" Main Condenser identified a cracked baffle at the heater drain tank return to the condenser, which resulted in mechanically damaging two condenser tubes, and unrelated damage to the 2A low pressure heater shroud. The cause of the problem is believed to have been from steam impingment at high recirculation flow rates back to the main condenser from the heater drain tank and feedwater syst' ems. Repairs were ongoing at the conclusion of the inspection perio ,
Licensee efforts to locate the source of the RCS unidentified leakage while in Mode 5 determined .that the predominant source appeared to be packing leakage fro'm the l'A" Charging Pump to the non-engineered safety features (ESF) sump located in the Auxiliary Building and associated with the liquid radwaste system. The packing was replaced and the licensee intends on performing the required RCS leakage surveillances in accordance with' Technical Specifications prior to returning to power operatio The unit remained in Mode 5 at the end of the inspection period, Unit 2 Hot Functional Testing was on going throughout the inspection period. Details are documented in paragraph 1 Plant Tours - Units 1 and 2 The following plant areas at Units 1 and 2 were toured by the inspector during the course of the inspection:
o Auxiliary Building
'
.
.
o Containment Building o Control Complex Building o Diesel Generator Building o Radwaste Building o Technical Support Center o Turbine Building o Yard Area and Perimeter d. The following areas were observed during the tours: Operating logs and' Records. Records were reviewed against Technical Specification and administrative control procedure requirement . Monitoring Instrumentatio Process instruments were observed for correlation between channels and for conformance with Technical Specification requirement . Shift Mannin Control room and shift manning were observed for conformance with 10 CFR 50.54.(k), Technical Specifications, and administrative procedure . Equipment Lineups. Valve and electrical breakers were verified to be in the position or condition required by Technical Specifications and by plant lineup procedures for the applicable plant mode. This verification included routine control board indication reviews.and conduct of partial system lineups. Details as provided in paragraphs 4.and 10 . Equipment Tagging. Selected equipment, for which tagging requests had been initiated, was observed to verify that tags were in place and the equipment in the condition specifie . Fire Protection. Fire fighting equipment and controls were observed for conformance with Technical Specifications and administrative procedures. Results of inspector review in the area of fire team staffing and training are documented in paragraph . Plant Chemistry. Chemical analysis results were reviewed for conformance with Technical Specifications and administrative control procedure . Security. Activities observed for conformance with regulatory requirements, implementation of the site security plan, and administrative procedures included vehicle and personnel access, and protected and vital area integrit . Plant Housekeepin Plant conditions and material equipment storage were observed with respect to the prevention of fire and safety hazards as well as the general state of cleanlines Housekeeping was also evaluated with respect to controlling the spread of surface and airborne contaminatio F
,
. 6
..
.
No violations or deviations were identifie . Engineered Safety Feature Systems Walk'Down - Unit 1 Selected _ engineered safety feature sys't' ems were walked down by the inspector to confirm that*the systems were aligned in accordance with plant procedures. During the walkdown of the' systems, items such as hangers, supports, electrical cabinets, and cables were inspected to determine that they were operable, and in condition to perform their required functions. The inspector also verified that the system valves were in the required position, and locked,as appropriate. The local and remote position indication and controls were also confirmed to be in the required position and operabl Portions of the following systems were walked down on June 4, 7 and 27, 198 High Pressure Safety Injection Trains "A" and "B" Low Pressure Safety Injection Trains "A" and "B" Containment Spray Systems Trains "A" and "B" Diesel Generator Trains "A" and "B" Auxiliary Feedwater Systems "A" and "B" No violations or deviations were identifie . Surveillance Testing - Unit 1 Surveillance tests required to be performed by the Technical Specifications were reviewed on a sampling basis to verify that: 1)
the surveillance tests were correctly included on the facility schedule; 2) a technically adequate procedure existed for performance of the surveillance tests; 3) the surveillance tests had been performed at the frequency specified in the Technical Specifications; ands 4) test results satisfied acceptance criteria or were properly dispositione The'following completed surveillance tests were reviewed:
37ST-9PM01 Seven Day Surveillance of Station Batteries, performed May 15 and 22, 198 ST-9GR02 Gaseous Rad Waste Explosive Gas Monitoring System Calibration, performed May 22, 198 ST-9SE05 Boron Dilution Alarm Functional Check, performed April 12, 1985, and May 17, 198 ST-9SE01 Quality Safety Parameter Display System, performed May 6,1985.
I l
36ST-9SB13 Supplemental Protective System Functional, performed May 15, 198 ST-1ZZ18 Routine Surveillance Mode 1-4 log, performed June 12 and 13, 1985.
L1
r --
.
- 7
.
. Portions of the following surveillance tests were observed to verify that: 1)_ testing was being accomplished by. qualified personnel in accordance with approved, technically adequate procedures; 2) the system was properly returned to service; and 3) measuring and test equipment satisfied calibration requirement ST-1ZZ18 Routine Surveillanc'e Mode 1-4 log, observed June 7, 14, and 25, 198 ST-9SE02 Excore Linear Power Sub-Channel' Calibration, observed June 20, 198 ST-1ZZ23 CEA Position Data Log, observed June 24, 1985 36ST-9SB02 Monthly Functional Check of PPS, observed June 25, 198 No violations or deviations were identifie . Plant Maintenance - Units 1 and 2 During the inspection period, the inspector observed maintenance and problem investigation activities to verify compliance with regulatory requirements, compliance with administrative and maintenance procedures, required QA/QC involvement, proper use of
. safety tags, proper equipment alignment and use of jumpers, and personnel qualifications. The inspector verified reportability, as required by Technical Specifications for these activities, was co rrec t.- The inspector witnessed portions of the following maintenance activities:
o Troubleshooting on main turbine electro-hydraulic control system on June 21, 198 o Trouble shooting on "B" Plant Protective System Sub-Channel on June 21, 198 o Repairs on main steam lines, following a steam leak on the main turbine header on June 24, 198 o Preventative maintenance under work order WO87619 on instrumentation ^ loop'for Control Room Heating, Ventilation and Air Conditioning normal chill water supply on June 25, 198 o Trouble shooting on reactor regulating system on June 27, 198 o Maintenance on main turbine electro-hydraulic oil leak on July 8, 198 o Trouble shooting on variable over power spurious trips on July 9, 198 _- _ ._
b
,
. 8
.
o ' Replacement of the "B" Nuclear Cooling Pump Motor (Unit 2) on July 9 and 10, 198 No violations or deviations were identifie . -Licensee Event Reports (LERs)
The inspector reviewed the following LERs to verify that the details of the event were clearly reported, the description of the cause was accurate, and adequate corrective action was taken. The inspector also determined whether further information was required, and whether generic implications were involved. The inspector further verified that the reporting requirements of Technical Specifications had been met; and that continued operation of the facility was conducted within Technical Specification limit LER 85-32 (Closed): Fuel Building Ventilation Flow Monitor Misalignment On April 23, 1985, prior to initial criticality, a radiation protection technician discovered during a routine sample media change out, that the exiting particulate and charcoal sampling media in the Fuel Building Ventilation Monitor (RV-145) had not been in the sample flow pat Sample flow can be routed through either of two parallel channel Licensee investigation determined that on April 19, a technician placed a particulate and a charcoal cartridge into Channel 1; however, the individual failed to realize that Channel I was isolated and flow was passing through Channel 2. The technician'who made the error was counseled on verifying proper valve lineups and ensuring sampling media is maintained in both channels. During the time RV-145 was inoperable, a portable monitor was sampling for particulates, but not iodine, as required by Technical Specification 3.3.3.9.b. The corrective measures associated with LER 85-32 were considered acceptable and technically close this LER; however, during the inspector's review it was noted that although the event was discovered on April 23, 1985, a report was not submitted to the NRC until June 14, 1985. Failure to submit a LER within thirty days -af ter discovery of a condition prohibited by Technical Specifications is contrary to Technical Specification 6.6.1.a and 10 CFR 50.7 (528/85-21-01)
In addition, the inspector noted that recently submitted LER 85-34 also exceeded the thirty day requirement. The failure to submit LER 85-34 within the required time frame was license identified; however, the LER did not include any reference to corrective action to assure timely submittals. Both examples of late LERs.were discussed with licensee management, who stated that corrective action to assure timely submittals would be taken by the license . Fire Te.am Training Record Review A review of the training records for the fire team members was conducted to verify that the requirements of 10 CFR 50, Appendix R, Section III and plant procedure 83TR-0ZZ07, " Fire Team Training," were being properly implemente .
,
. 9
.
.
The following observations were made during the above review:
o Training records did not accurately reflect the current status of fire team members, which made it difficult for the inspector and licensee representatives to determine which personnel were qualified and could be considered available to be part of the five member. fire team required by Technical Specification 6.2.2.1.e to be on site at all times. The licensee took immediate action to update the training records and ensure that only qualified personnel were being credited as fire team member o -The inspector noted several instances where individuals had not attended 1) periodic retraining sessions, and 2) meetings to address changes in the PVNGS fire protection program, at least every.92 days as required by procedure 83TR-0ZZ07. With regard to retraining sessions, the inspector noted that the above procedure was more restrictive than 10 CFR Part 50, Appendix R, which only requires that periodic refresher training repeat the initial class room training over a two-year period. The inspector was informed by Fire Protection sepervision that a decision had been made as a result of this inconsistency to submit a procedure change to make the retraining frequency statement in 83TR-0ZZ07 consistent with Appendix With regard to the 92 day meeting interval to discuss program changes, Fire Protection supervision stated that there had been no changes to the fire protection program which warranted a meetin The supervisory staff did state; however, that the fact that the meetings were overdue was not known until the inspector raised questions on the adequacy of the training records.,,The licensee has subsequently held the meetings on program changes.and used the opportunity to highlight certain fire team t' raining topics. The inspector concluded that although meetings to discuss plant changes had not been held within the prescribed time frame, the fact that no changes occurred, indicated solely an administrative problem with no safety significance to the finding. - .
o A sample review of reco'rds maintained in the Unit 1 Control Room Log confirmed that fire team staffing and qualifications (training and medical) were acceptable, .with one exception of an individual whose respirator fit test had lapsed. .In this instance, the p'roblem had been identified by the licensee and the individual removed from the !
qualified list of available' fire team members. The" inspector's log review also identified that on mid-shift,for the dates of June 19 and 20, respectively, (only) three'and four fire team members were logged for the respective shifts. Further inspector review determined that five qualified fire team members were present on the above shif ts, but their names were not logged. - The inspector stated that greater attention to proper logging of fire team personnel appeared necessary including improvements in the spelling of members' names. The licensee representative acknowledged the inspector's comment, and a night order was written to alert the operators to the need for improved log keeping regarding fire team staffin _ _ _ - - _ _ _ _ - . . _ _ - _ _ - _ - - - -
,
. 10
.
.
The above problem relating to the difficulty in determining fire team member qualification due to training records not being maintained current is similar to discrepancies identified in emergency planning training records and documented in NRC Region V Inspection Report 50-528/85-1 This issue was discussed with licensee management, who indicated that steps were underway to improve overall train ~ing record statu Additional inspection in the area of fire team training and staffing will be conducted during a future NRC inspection. This review will also include inspector verification that no fire protection program changes had occurred, as stated above. (528/85-21-02) Unit 1 Operating Licensee Commitment Followup Facility Operating license NPF-34, item 2c(12), required the licensee to install and satisfactorily test the auxiliary.feedwater pump compartment flood protection seals prior to initial criticalit The inspector reviewed the following Design Change Packages (DCPs) and Work Orders (W0s) associated with the installation and testing of the auxiliary feedwater pump compartment flood protection seals. The following documentation was reviewed for completeness, and the
~
suitability of the sealant was verified:
o DCP'15A-ZM-011 WO 67749
'
o DCP 10A-ZM-015 WO 85462 o DCP 10A-ZM-800 WO 77249 o DCP 10A-ZY-147 WO 86121 The inspector did not identify any discrepancies with the DCPs or W0 During a tour of the auxiliary feedwater pump compartments, several seals were examined with no discrepancies note No violations or deviations were identifie . Review of Preoperational Testing Activities - Unit 2 Major Test Activities The major preoperational test activities in progress 'during the reporting period were associated with the conduct of the precore Hot Functional Test (HFT). Systems tested included the auxiliary feedwater system, steam generator main steam isolation system, steam bypass control system, chemical and volume control system, and the reactor coolant syste On July 8, 1985, during the conduct of the precore HFT, the control room operators noted a unexplained drop in pressurizer pressure, and received several annunciator lights indicating changes in equipment
. status. The plant was operating at a temperature of 565 degrees F and a pressure of 2250 psig. Equipment indicating abnormal operation were a pressurizer auxiliar; spray valve, two safety injection tank vent valves, the steam supply valve to the auxiliary feedwater turbine, four atmospheric dump permissive valves, two
%
.
.~ 11
..
.
auxiliary feedwater isolation valves, and the isolation valve on the reactor coolant pump seal return;line to-the volume control tan The control room operators responded quickly to the event and were able to regain control of the primary coolant l pressure without a significant decrease in pressure (250 psig). .The' problem was diagnosed as originating from the remote shutdown panel and operating staff were dispatched to the area. An inspection of the equipment revealed that switches in this area had been used to operate the equipment listed without the permission of the operating staf APS is conducting an investigation into the incident. Law enforcement authorities were notified by APS. Security measures during the conduct of the remaining portion of'HFT have been strengthened. The inspector will follow the licensee's actions (529/85-22-01).
b. Preoperational Test Procedure Review - Unit 2 The inspector reviewed the following preoperational test procedures:
90HF-2ZZ01 - Precore Hot Functional Controlling Document 93PE-2SA01 - Integrated Test of Engineered Safety Features 91HF-2RC05 - Reactor Coolant System Leak Rate Measurement The inspector verified the procedures were formally reviewed and approved, formatted, and contained the information required by Administrative Control Procedure 90AC-0ZZ14, "PVNGS Startup Procedures, Preparation, Review and Approval." A sample of acceptance criteria contained in the procedures was compared with design documents. The inspector verified the design values and required equipment performance were consisten l'
i c. Preoperational Test Witnessing - Unit 2
, The inspector witnessed portions of the following tests:
91PE-2SG04 - Steam Generator Isolation 91PE-2AF01 - Auxiliary Feedwater System p 91PE-2SG03 - Atmospheric Dump Valve Test 92HF-2ZZ01 - Instrument Correlation
'
90HF-27Z01 - Precore Hot Functional Controlling Document 93PE-2PE01 - Diesel Generator Electrical Tests
91HF-2RC02 - Pressurizer Performance 91HF-2SF03 - Turbine Bypass Control System l 91HF-2SI01 - Safety Injection Check Valve Test
) 91HF-2AF01 - Precore Emergency and Auxiliary Feedwater System l Test 91HF-2RC05 - Reactor Coolant System Leak Rate Measurement 91HF-2CH01 - Boration Dilution 91HF-1CH01 - CVCS Integrated Test The inspector verified that approved procedures were used, test personnel were knowledgeable of the test requirements, and data was
'--
_ _ _ _ _ _ _ _ _ _ - . - -
. . . ..
, . . . . . .. .
. ._ . _
'
.. 12
.
properly collected. Procedure changes and test exceptions were identified and significant events were. recorded in the test lo Other test.related activities such as the use-of calibrated measuring and test equipment, and completion of test prerequisites were also verified to have been accomplished in accordance with ;
administrative control procedure In addition the inspector verified on a sampling basis that valve and electrical equipment alignments were also accomplished in accordance with procedures or instructions. These checks were performed in conjunction with the testing of the following equipment:
l 0 Reactor Coolant System o Shutdown Cooling System o Chemical and Volume Control System o Auxiliary Feedwater System o Essential Cooling Water System
, Preoperational Test Results Review The results of the following preoperational tests were reviewed by the inspector:
92PE-2SB10 - Plant Protection System (Channel A)
92PE-2SB11 - Plant Protection System (Channel B)
92PE-2SB12 - Plant Protection System (Channel C)
i 92PE-2SB13 - Plant Protection System (Channel D)
91PE-2FH03 - New Fuel Elevator 91PE-2FH07 .150/15-Ton Cook Handling Crane 91PE-2FH08 - 10-Ton New Fuel Handling Crane
!
91HF-2RC05 - Reactor Coolant System Leak Rate Measurement The inspector verified that activities such.as test exception resolution, test data acquisition,; test report issuance, test modifications and acceptance criteria verification had been
. accomplished in accordance with procedure No violations or deviations.were identifie >. .
.1 Followup of Information Notice 85-23: Inadequate Surveillance and Post Maintenance / Post Modification System Testing - Units 1 and 2
'
This notification discusses several nuclear plant problems.which resulted because of inadequate post maintenance / post modification testing. A review of APS work procedures by the inspector confirmed that formal
. controls have been developed for the testing of equipment following maintenance or modifications in both the startup and operational phase These controls are identified in~ procedure 30AC-92Z01 entitled " Work Control" and require formal documented reviews. Retesting is identified by generic test procedures, surveillance test procedures, or portions of preoperational test procedures which have already been developed to meet the startup test program acceptance criteria / design performance or Technical Specification requirement . .. .
_ _ _ _ _ _ _ _ _ __ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ ______
,
.
!
Based on this review and plant performance to date, the inspector concluded that the licensee's program incorporates adequate controls to include proper retesting following post maintenance / modification wor This item is close . 10 CFR Part 21 Report: Brown Boveri Inc. Voltage Balance Relay TITE-60) - Units 1 and 2 By letter dated October 29, 1984, Brown Boveri, Inc. submitted a 10 CFR Part 21 to the NRC documenting slow operation of Model ITE-60 voltage balance relays, used predominately in emergency diesel generator protection scheraes. Based on a review conducted by Bechtel Engineering at the request of APS, this type of relay is not used at the Palo Verde sit This item is close . Corrosion by Microbiological Organisms - Unit 2 An inspection of the Unit 2 "A" Essential Cooling Water Heat Exchanger (ECWHX) and the "A" Diesel Generator Jacket Cooling Water Heat Exchanger
, was conducted by APS and Bechtel as part. of the commitment made by ANPP l
to the NRC in its letter to the NRC dated May 30, 1985. The inspector l independently observed the condition.of the ECWID(. Heat exchanger tubes
! were boroscoped and no evidence of microbiological corrosion was
'
observed. The corrosion phenomenon is further discussed in NRC inspection report 529/85-1 No violations or deviations were identified.
l 14. Temporary Instruction 2515/67: Survey of Licensee's Response to l Splected Safety Issue - Unit 1 (Closed)
This instruction was to determine the actions that licensees of operating reactors have taken to address a selected sample of safety issues. Two l issues were identified: 1) potential steam bindings of auxiliary
! feedwater pumps due to back leakage, and 2) procedural changes and operator training to identify and cope with mispositioned control rod The inspector verified that the piping of the Auxiliary Feedwater pumps was not hot to the touch during normal plant operating conditions and that the auxiliary operators are routinely monitoring the piping and pump temperature These temperature checks were recorded on the auxiliary operators' shift log. The check valves were being tested once every 92 days per 36ST-9MT01 Examination of Stop, Control and Intercept Valve The inspector also verified that procedures 41AO-12Z10 " Immovable Control Rod" and 41AO-1ZZ11 " Dropped or Slipped Control Element Assembly" were adequate to define the steps necessary for recovery from a mispositioned control rod or to identify rod position when one form of normal indication is lost. Operator training in proper movement of control rods, consequences of improper movement of control rods, and the consequences of operation with a mispositioned control rod, was also reviewed to verify that the operators were initially trained, and that these subjects were covered in requalification training. This item is considered close _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _-
. 14
.
1 Generic Letter 85-05: Inadvertent Boron Dilution Events'- Unit 1 The purpose of this letter was to inform each licensee of operating pressurized water reactors of the staff position resulting from the evaluations of Generic Issue 22, " Inadvertent Boron Dilution Events" regarding the need for upgrading the instrumentation for detection of boron dilution events. The letter contained-no requirements or actions, other than an urging of each licensee to assure themselves that adequate protection against boron dilution events was in effect at their plant A boron dilution alarm from the startup range nuclear instrumentation wa being used to provide alarm indication for a 1/3 of a decade increase in j shutdown neutron level. The inspector verified that procedures whic I addressed a boron dilution accident were available, and through discussion with several operators of the required actions upon a possible j inadvertent boron dilution alarm, verified that the operators have been trained in the use of these procedure This item is close . Review of Periodic and Special Reports i
The monthly operating report for May, 1985 was reviewed. The report l contained the information required to be reported by NRC requirements, and the report appeared vali No violations or deviations were ideutifie . Exit Meeting i The inspector met with licensee management representatives periodically during the inspection and held an exit meeting on July 12, 1985. The
! scope of the-inspection and the inspector's findings, as noted in this
report, were discussed and acknowledged by the licensee representatives.
,
k .
'
\
, !
'
,
.