May 09, 2022

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2022001, 05000529/2022001, AND 05000530/2022001

Dear Mrs. Lacal:

On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On April 7, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000528 and 05000529, and 05000530 License Nos. NPF-41, NPF-51 and NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51 and NPF-74

Report Numbers:

05000528/2022001, 05000529/2022001 and 05000530/2022001

Enterprise Identifier:

I-2022-001-0011

Licensee:

Arizona Public Service Company

Facility:

Palo Verde Nuclear Generating Station

Location:

Tonopah, AZ

Inspection Dates:

January 1, 2022 to March 31, 2022

Inspectors:

L. Merker, Senior Resident Inspector

N. Cuevas, Resident Inspector

S. Hedger, Senior Emergency Preparedness Inspector

E. Lantz, Resident Inspector

Approved By:

John L. Dixon, Jr., Chief

Projects Branch D

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000529/2021-001-00 LER 2021-001-00 for Palo Verde Nuclear Generating Station, Unit 2, Automatic Actuation of the Reactor Protection System Resulting from a Loss of Reactor Coolant Pumps 71153 Closed LER 05000529/2021-002-01 LER 2021-002-01, Palo Verde Nuclear Generating Station (PVNGS) Unit 2,

Reactor Trip during Plant Protection System Surveillance Testing 71153 Closed

PLANT STATUS

Unit 1 entered the inspection period at full power. On March 27, 2022, the unit began a coastdown for refueling outage 1R23.

Unit 2 entered the inspection period at full power. On January 24, 2022, the unit shut down for short notice outage 2M24A to repair a nitrogen leak on safety injection tank 1A and perform repairs on high pressure feedwater heater 5A. On February 6, 2022, the reactor was made critical following completion of the short notice outage and returned to full power on February 8, 2022, where it remained for the remainder of the inspection period.

Unit 3 operated at or near full power for the duration of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1, emergency diesel generator train B during emergency diesel generator train A maintenance outage, on March 4, 2022
(2) Unit 2, essential cooling water train B following maintenance, on March 22, 2022
(3) Unit 2, emergency diesel generator train A during emergency diesel generator train B maintenance outage, on March 24, 2022
(4) Unit 3, low pressure safety injection train B following maintenance, on March 29, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1, emergency diesel generator A and emergency diesel generator A control rooms, Fire Zones 21A and 22A, on March 3, 2022
(2) Unit 3, class 1E 4kV switchgear B room, Fire Zone 5B, on March 18, 2022
(3) Unit 2, emergency diesel generator B and emergency diesel generator B control rooms, Fire Zones 21B and 22B, on March 24, 2022
(4) Unit 2, class 1E 125Vdc equipment rooms, Fire Zones 6A, 6B, 7A, and 7B, on March 30, 2022

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire department training and performance during unannounced fire drills on February 14 and March 14, 2022, and their response to smoke from a motor control center cubicle in the Unit 3 class 1E 4kV switchgear B room, on March 17, 2022.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 2 downpower and reactor trip for planned short notice outage 2M24A, on January 24, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed licensed operator simulator training activities, on January 18, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 1, emergency diesel generator train A, on March 31, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 3, high risk for planned switchyard maintenance, on February 1, 2022
(2) Unit 1, high risk for planned supplementary protection system channel calibrations, on February 11, 2022
(3) Unit 1, high risk for essential spray pond train A diving operations and elevated green risk for planned emergency diesel generator A maintenance outage, on March 4, 2022
(4) Unit 2, high risk for a containment entry at full power for emergent replacement of failed low steam generator 1 reactor coolant flow trip pressure transmitter D, on March 19, 2022
(5) Unit 2, high risk for essential spray pond train B diving operations and elevated green risk for planned emergency diesel generator B maintenance outage, on March 23, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 3, emergency diesel generator train A operability determination due to failure of emergency mode fuel control solenoid valve DG-AUV-0011, on February 10, 2022
(2) Unit 2, main steam isolation valve SGE-UV-171 operability determination due to discovery of a nitrogen leak from a seal weld defect on accumulator A, on February 18, 2022
(3) Unit 3, high pressure safety injection train A operability determination due to injection valve SIA-UV-627 failing to close, on March 7, 2022
(4) Unit 1, main steam bypass control valve SGN-PV-1004 functionality assessment due to restoration without the required warmup, on March 21, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) Unit 1, atmospheric dump valve SGA-HV-184 testing following calibration of pressure indicator J-SGE-PI-0318 and pressure control valve J-SGA-PCV-0317, on January 20, 2022
(2) Unit 2, safety injection tank 1A testing following pressure transmitter PT-333 instrument tubing fittings replacement, on January 28, 2022
(3) Unit 3, emergency diesel generator train A testing following the replacement of emergency mode fuel control solenoid valves DGA-UV-0009 and DGA-UV-0011, on February 14, 2022
(4) Unit 1, emergency diesel generator train A testing following maintenance outage, on March 25, 2022
(5) Unit 2, loop calibration testing following low steam generator 1 reactor coolant flow trip pressure transmitter D replacement, on March 25, 2022
(6) Unit 2, emergency diesel generator train B testing following maintenance outage, on March 31, 2022

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (1 Sample)

(1) Unit 2, emergency diesel generator B load rejection, 24-hour rated load, and hot start, on February 11, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 3, essential spray pond pump A inservice testing, on March 19, 2022

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the maintenance and testing of the alert and notification system between March 1, 2020, and March 14, 2022.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between March 1, 2020, and March 14, 2022. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between March 1, 2020, and March 14, 2022. The evaluation reviewed screenings and evaluations documenting implementation of the process. In addition, the inspectors evaluated emergency plan revisions 70 and 71 submitted to the NRC on July 22, 2021. The reviews of the change process documentation or the emergency plan changes do not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program between March 1, 2020, and March 14, 2022. The evaluation reviewed evidence of completing various emergency plan commitments, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated an emergency preparedness drill on February 1, 2022.

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated an emergency preparedness drill on March 8,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 1 (January 1, 2021 through December 31, 2021)
(2) Unit 2 (January 1, 2021 through December 31, 2021)
(3) Unit 3 (January 1, 2021 through December 31, 2021)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (3 Samples)

(1) Unit 1 (January 1, 2021 through December 31, 2021)
(2) Unit 2 (January 1, 2021 through December 31, 2021)
(3) Unit 3 (January 1, 2021 through December 31, 2021)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (3 Samples)

(1) Unit 1 (January 1, 2021 through December 31, 2021)
(2) Unit 2 (January 1, 2021 through December 31, 2021)
(3) Unit 3 (January 1, 2021 through December 31, 2021)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)

EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)

(1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)

EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)

(1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)

71153 - Follow Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 05000529/2021-001-00, Unit 2, Automatic Actuation of the Reactor Protection System Resulting from a Loss of Reactor Coolant Pumps (ADAMS Accession No.

ML21113A313). The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foresee and correct and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified.

(2) LER 05000529/2021-002-01, Unit 2 Reactor Trip During Plant Protection System Surveillance Testing (ADAMS Accession No. ML22032A112). The inspectors reviewed the updated LER submittal and identified no additional performance deficiencies or violations of NRC requirements. The previous LER submittal was reviewed, and an associated violation of NRC requirements was documented in Inspection Report 05000528/2021003, 05000529/2021003, and 05000530/2021003 (ADAMS accession: ML21311A00).

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 25, 2022, the inspectors presented the emergency preparedness program inspection results to Mrs. Maria Lacal, Executive Vice President, Chief Nuclear Officer, and other members of the licensee staff.

On April 7, 2022, the inspectors presented the integrated inspection results to Mrs. Maria Lacal, Executive Vice President, Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Corrective Action

Documents

16-14387, 22-02913, 16-15294, 22-03189

71111.04

Drawings

01-M-EWP-001

P & I Diagram Essential Cooling Water System

71111.04

Drawings

01-M-SIP-001

P & I Diagram Safety Injection & Shutdown Cooling System

71111.04

Drawings

2-M-DGP-001

P & I Diagram Diesel Generator System

71111.04

Procedures

40EP-9EO10-232

Appendix 232: LM - Placing Train B LPSI in Standby

71111.04

Procedures

40OP-9DG01

Emergency Diesel Generator A

71111.04

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.04

Procedures

40OP-9EW02

Essential Cooling Water System (EW) Train B

71111.04

Procedures

40ST-9DG01

Diesel Generator A Test

71111.04

Procedures

40ST-9DG02

Diesel Generator B Test

71111.04

Procedures

40ST-9SI14

Train B LPSI and CS System Alignment Verification

71111.04

Procedures

73ST-9XI52

Safety Injection Train B ECCS Throttle Valves - Inservice

Test

71111.05

Calculations

13-MC-FP-0803

Combustible Loads - Control Building

71111.05

Corrective Action

Documents

2-02653, 22-02734, 22-02766, 22-02733, 22-02739, 16-

18974, FSCCR 5423057, 22-02813

71111.05

Corrective Action

Documents

13-MC-FP-0808

Combustible Loads - Diesel Generator Building

71111.05

Drawings

13-A-ZYD-29

Fire Protection Control Building Floor Plan at Elevation 100-

71111.05

Fire Plans

Pre-fire Strategies Manual

71111.05

Miscellaneous

USFSAR, Appendix 9B, Fire Protection Evaluation Report

71111.05

Miscellaneous

UFSAR, Appendix 9B, Fire Protection Evaluation Report

20C

71111.05

Miscellaneous

Unit 1 Tamper/Vital/Security Tour, Firewatch Tour February

- March 3, 2022

03/03/2022

71111.05

Miscellaneous

PVGS Pre-Fire Strategies Manual

71111.05

Miscellaneous

14DP-0TR02

Fire Department Training Program Administration

71111.05

Miscellaneous

2-I-03-001

Emergency Response/Incident Investigation Report:

Investigate Smoke/Odor in Unit 3 Control Building

Switchgear B

03/17/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05

Miscellaneous

NPL41-D-1Q1A-

Unannounced Backshift Drill Report

71111.05

Miscellaneous

NPL41-D-1Q1A-

Unit 1 Palo Verde Nuclear Fire Department

Backshift/Unannounced Fire Drill A Shift Scenario

2/11/2022

71111.05

Miscellaneous

NPL41-D-1Q3C-

Unannounced Backshift Drill Report

71111.05

Miscellaneous

TD 280505

3EPHBM3221**CKTBRK - Diesel Gen Stator Spacehtr 1E-

DGB-H01H CKTBRK

03/17/2022

71111.05

Procedures

14DP-0FP02

Fire Systems Impairments and Notifications

71111.05

Procedures

14DP-0FP32

Emergency Notification and Response

71111.05

Procedures

14DP-0FP33

Control of Transient Combustibles

71111.05

Procedures

14DP-0FP44

Fire Protection Test Program Requirement

71111.05

Procedures

14FT-9FP70

Appendix R & Former Tech Spec Penetration Seal

Surveillance

71111.05

Procedures

14FT-9FP70

Appendix R & Former Tech Spec Penetration Seal

Surveillance

71111.05

Procedures

40AL-9DG02

Diesel Generator B Alarm Panel Responses

71111.05

Procedures

40AL-9RK1C

Panel B01C Alarm Responses

71111.05

Procedures

40DP-9ZZ17

Control of Doors, Hatches and Floor Plugs

71111.05

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.05

Work Orders

28106

71111.11Q

Corrective Action

Documents

2-00769

71111.11Q

Miscellaneous

Unit 2 Control Room Logs

01/24/2022

71111.11Q

Miscellaneous

U2C24 SNO Downpower Gameplan

01/24/2022

71111.11Q

Miscellaneous

SES-0-09-U-08

Licensed Operator Continuing Training Simulator Evaluation

Scenario: Inad B CIAS / Degraded Vacuum / Stat Cool

Pump Trip / Loss of Both MFPs / AFN Suct Seizure / Small

Break LOCA / NBN-X03 w/ EDG Fail

71111.11Q

Procedures

40EP-9EO01

Standard Post Trip Actions

71111.11Q

Procedures

40EP-9EO02

Reactor Trip

71111.11Q

Procedures

40OP-9FT01

Feedwater pump turbine A

71111.11Q

Procedures

40OP-9ZZ24

Short Notice Outage

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Corrective Action

Documents

2-02105, 22-02118, 22-02257, 22-02214, 22-02224, 22-

231, 22-02326, 22-02181, 22-02224

71111.12

Miscellaneous

Performance Criteria Formulation Bases for DG System

(Emergency Diesel Generator)

71111.12

Miscellaneous

Performance Criteria Formulation Bases for HD System

(Diesel Building HVAC)

71111.12

Miscellaneous

Unit 1 Maintenance Rule SSC Unavailability (UA) Report

01/21/2022

71111.12

Miscellaneous

Unit 1 Maintenance Rule SSC Unavailability (UA) Report

03/22/2022

71111.12

Miscellaneous

Unit 1 Emergency Diesel Generator Train B Performance

Monitoring Group Report

03/03/2022

71111.12

Procedures

30DP-9MP03

Mechanical System Cleanliness

71111.12

Procedures

31MT-9DG05

Installation and Removal of DG A Temporary Piping

Supports

71111.12

Procedures

2MT-9PE01

Cleaning, Inspection, and Testing of the Class 1E Diesel

Generator

71111.12

Procedures

70DP-0MR01

Maintenance Rule

71111.12

Work Orders

297453, 5297477, 5297555, 5297631, 5423702

71111.13

Corrective Action

Documents

2-00094, 22-00255, 22-00501, 22-00937, 22-00942, 22-

01061, 22-01477, 22-01486, 22-01518, 16-08430, 22-

2070, 22-02109, 21-12743, 22-02134, 22-02526, 22-

2778, 10-00132, 20-12656, 22-02848

71111.13

Drawings

2-J-RCE-0072

Instrument Loop Wiring Diagram Reactor Coolant System

71111.13

Drawings

A-774-7.2

Palo Verde 500kV Switchyard Control House Drawing Index

71111.13

Miscellaneous

Palo Verde Configuration First Quarter of 2022 PowerPoint

Presentation

71111.13

Miscellaneous

Work Week 2147 Schedule Risk Evaluation

71111.13

Miscellaneous

Work Week 2201 Schedule Risk Evaluation

71111.13

Miscellaneous

Work Week 2202 Schedule Risk Evaluation

71111.13

Miscellaneous

Work Week 2203 Schedule Risk Evaluation

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary

Report as of 02/28/2022 04:10

2/28/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary

Report as of 03/01/2022 01:22

03/01/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary

03/02/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Report as of 03/02/2022 08:52

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary

Report as of 03/02/2022 15:24

03/02/2022

71111.13

Miscellaneous

Unit 1 Protected Equipment Scheme for DG/EC/EW/SP A

Outage (DG/EC/EW/SP B Protected)

2/27/2022

71111.13

Miscellaneous

Work Week 2209 Schedule Risk Evaluation

2/28/2022

71111.13

Miscellaneous

Work Week 2212 Schedule Risk Evaluation

03/18/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary

Report as of 03/21/2022 01:08

03/21/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary

Report as of 03/22/2022 03:42

03/22/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary

Report as of 03/22/2022 12:00

03/22/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary

Report as of 03/22/2022 12:25

03/22/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary

Report as of 03/22/2022 14:20

03/22/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary

Report as of 03/23/2022 02:19

03/23/2022

71111.13

Miscellaneous

Unit 2 Protected Equipment Scheme for EW, EC and SP B

INOP;

03/20/2022

71111.13

Miscellaneous

Unit 2 Protected Equipment Scheme for DG B Being

INOPERABLE (DG A Protected);

03/20/2022

71111.13

Miscellaneous

Unit 1 Work Week 2206 Schedule Risk Evaluation

71111.13

Miscellaneous

High Risk Activity Mitigation Summary - Work Week 2206

71111.13

Miscellaneous

25015

Job Hazard Analysis Form for at Power Containment Entry

to Troubleshoot and Rework RCD-FLOOP-115D

Components

03/07/2022

71111.13

Miscellaneous

VTD-I204-00025

ITT Barton Models 764 Differential Pressure Electronic

Transmitter Installation and Operational Manual

71111.13

Procedures

01DP-0AP57

Management of Critical Evolutions and Infrequently

Performed Tests or Evolutions

71111.13

Procedures

01DP-0IS17

Heat Stress Prevention Program, Rev. 11 - heat stress

append G

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.13

Procedures

2DP-0RS01

Online Integrated Risk

71111.13

Procedures

36ST-9SB14

Supplementary Protection System Channel Calibration

71111.13

Procedures

40DP-9AP21

Protected Equipment

71111.13

Procedures

40DP-9OP34

Switchyard Administrative Control

71111.13

Procedures

40DP-9RS01

Operations Department Online Nuclear Risk Determination

Modes 1 and 2

71111.13

Procedures

40DP-9ZZ01

Containment Entry in MODE 1 Through MODE 4

71111.13

Procedures

40OP-9DG01

Emergency Diesel Generator A

71111.13

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.13

Procedures

40ST-9ZZ09

Containment Cleanliness Inspection

71111.13

Procedures

40ST-9ZZ37

Inoperable Power Sources Action Statement

71111.13

Work Orders

5198819, 5248005, 5297490, 5324635, 5423562, 5301642

71111.15

Calculations

13-MC-SG-0821

MSIV & MFIV Accumulator Tubing Adapter Stress

Determination

71111.15

Corrective Action

Documents

21-14375, 21-14538, 21-14654, 22-00155, 22-01328, 18-

201, 21-14350, 21-14377, 22-00828

71111.15

Drawings

01-M-SGP-001

P & I Diagram Main Steam System (Sheet 2)

71111.15

Drawings

03-M-DGP-001

P & I Diagram control Air Diesel Generator System

71111.15

Drawings

03-M-SIP-0002

P & I Diagram Safety Injection and Shutdown Cooling

System

71111.15

Drawings

13-M234A-00093

Adapter Fitting For Hydraulic Accumulator SAE#6 Straight

Thread SPL. Male Connector with 3/8 Dia. Tubing

71111.15

Drawings

M018-00119

Control Diagram Shutdown System

71111.15

Engineering

Changes

18-14201-010

New Know Design/Installation Method for 910 and 911

Series Hand-switches

71111.15

Engineering

Changes

2019-00761

See Design Equivalent Change - Alternate Detail Package

18-14201-010 for the Required Justification and Information

Regarding This Document Change

71111.15

Miscellaneous

UFSAR, Section 9.5.6 Diesel Generator Starting System

20C

71111.15

Miscellaneous

PVNGS Design Basis Manual-Diesel Generator, Class 1E

Standby Generation, Fuel Oil Storage and Transfer System

71111.15

Miscellaneous

Risk Management and Readiness Plan to Troubleshoot and

Rework RCD-PDT-115D Transmitter

03/07/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Miscellaneous

13-M-FPR-0008

Appendix R Safety Function Diagram Diesel Generator A

71111.15

Miscellaneous

13-NS-C075

MSPI Bases Document

71111.15

Miscellaneous

93-SI-005

HPSI Cold Leg Injection Valves (SIAUV617,627,637,647

and SIABUV616,626,636,646) HPSI Flow Control Valves to

the RCS

71111.15

Miscellaneous

N001-1104-00384

Valve Assembly 2 Y Type Globe Valve Motor Operated

71111.15

Miscellaneous

NKASMC041205

Licensed Operator Initial Training Classroom Lesson:

Appendix 2, Figures;

09/10/2019

71111.15

Miscellaneous

VTD-C600-00001

Control Components Inc. Operation and Maintenance

Manual for Steam By-Pass Control Valves

71111.15

Miscellaneous

VTD-S547-00002

SENASYS Company - BOM Parts Breakdown Lists for

Coordinated Manual Controls (CMC) 910 or 911 Series

Chart I - Multi-light Oiltight Controls - (www.SENASYS.com)

(PUB #CO-78498) Was: Micro Switch (A Honywell Division)

for CMC

71111.15

Procedures

40DP-9AP08

Loss of Coolant Accident Technical Guideline

71111.15

Procedures

40DP-9OP18

Motor Operated Valves Operating Guidelines

71111.15

Procedures

40DP-9OP26

Operations Condition Reporting Process and Operability

Determination/Functional Assessment

71111.15

Procedures

40EP-9EO03

Loss of Coolant Accident

71111.15

Procedures

40EP-9EO10-002

Appendix 2: Figures

71111.15

Procedures

40OP-9PH01

Train A 480V Class 1E MCC

71111.15

Procedures

40OP-9SG01

Main Steam

71111.15

Procedures

40OP-9SH05

Operation of the Steam Bypass Control System

71111.15

Work Orders

5157751, 5393537, 5404057, 5393374, 5187527

71111.19

Calculations

13-JC-DF-0202

Diesel Fuel Oil Storage Tank Level Instrument (DFN-L-33 &

43) Uncertainty Calculation

71111.19

Calculations

13-JC-RC-0205

Low Reactor Coolant Flow (RCx-PD-115x, RCx-PD-125x)

Setpoint and Uncertainty Calculation

71111.19

Corrective Action

Documents

2-00155, 22-01328, 22-02573, 22-02597, 21-12743, 22-

2134, 22-02526, 22-02556, 22-02778, 22-03091, 22-

03101, 22-03112, 22-03122, 22-03123, 22-03124

71111.19

Drawings

01-M-SGP-001

P & I Diagram Main Steam System

71111.19

Drawings

2-J-RCE-0072

Instrument Loop Wiring Diagram Reactor Coolant System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.19

Drawings

2-M0SIP-002

P & I Diagram Safety Injection and Shutdown Cooling

System

71111.19

Drawings

03-M-DGP-001

P & I Diagram Control Air Diesel Generator System

71111.19

Drawings

M018-00119

Control Diagram Shutdown System

71111.19

Miscellaneous

Unit 2 Control Room logs

03/25/2022-

03/27/2022

71111.19

Miscellaneous

13-VTD-T020-

00015

Target Rock Technical Manual for Pressure Regulating

Valves

71111.19

Miscellaneous

VTD-I204-00025

ITT Barton Models 764 Differential Pressure Electronic

Transmitter Installation and Operational Manual

71111.19

Miscellaneous

VTD-S958-00002

Swagelok Gaugeable Tube Fittings and Adapter Fittings

71111.19

Procedures

36ST-9SB41

PPS Transmitter Response Time Test Inside Containment

71111.19

Procedures

36ST-9SB58

Transmitter Calibration for PPS Parameters 5, 6, 11, 12, 14,

and the Supplementary Protection System

71111.19

Procedures

36ST-9SB62

PPS Input Loop Calibration for Channel D Parameters 5, 6,

11, 12, 14, and 15

71111.19

Procedures

40DP-9OP08

Diesel Generator Test Record

71111.19

Procedures

40OP-9DG01

Emergency Diesel Generator A

71111.19

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.19

Procedures

40ST-9DG01

Diesel Generator A Test

71111.19

Procedures

40ST-9DG02

Diesel Generator B Test

71111.19

Procedures

73ST-9XI20

ADVs - Inservice Test

71111.19

Work Orders

281613, 5281576, 5388830, 5404057, 5205175, 5233342,

258982, 5298138, 5298110, 5324635, 5379903, 5423562,

27875, 5386055

71111.22

Calculations

13-EC-PE-0123

Diesel Generator Voltage Meter Loop E-PEN-EI-G01/G02

Uncertainty Calculation

71111.22

Calculations

13-EC-PE-0124

Diesel Generator Frequency Meter Loop E-PEN-SI-G01/G02

Uncertainty Calculation

71111.22

Calculations

13-JC-SP-0201

Essential Spray Pond Flow Instruments (SPA-F-0005, SPB-

F-0006, SPN-F-0007, & SPN-F-0008) Setpoint and

Uncertainty Calculation

71111.22

Corrective Action

Documents

2-00873

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.22

Miscellaneous

23834

Safety Function Determination Tracking Sheet for Inoperable

SPAP01

03/02/2022

71111.22

Procedures

2MT-9ZZ09

Meter Calibration

71111.22

Procedures

40DP-9OP08

Diesel Generator Test Record

71111.22

Procedures

40DP-9OP37

Safety Function Determination Procedure

71111.22

Procedures

40OP-9DG02

Emergency Diesel Generator B

71111.22

Procedures

40ST-9EC03

Essential Chilled Water and Ventilation Systems Inoperable

Actions Surveillance

71111.22

Procedures

40ST-9ZZ37

Inoperable Power Sources Action Statement

71111.22

Procedures

73ST-9DG08

Class 1E Diesel Generator Load Rejection, 24 Hour Rated

Load and Hot Start Test Train B

71111.22

Procedures

73ST-9SP01

Essential Spray Pond Pumps - Inservice Test

71111.22

Work Orders

5317415

71114.02

Miscellaneous

Palo Verde Nuclear Generating Station, Alert and

Notification System (ANS) FEMA 350 Report, July 2019

71114.02

Miscellaneous

Palo Verde Nuclear Generating Station Siren Operating

Manual

2/30/2021

71114.02

Procedures

16DP-0EP27

Emergency Preparedness Equipment Testing

71114.02

Procedures

16DP-0EP29

Emergency Preparedness Offsite Program

71114.02

Procedures

16DP-0EP37

Prompt Notification System

71114.03

Miscellaneous

20 1st Quarter - Emergency Preparedness Augmentation

Test Report

03/19/2020

71114.03

Miscellaneous

20 2nd Quarter - Emergency Preparedness Augmentation

Drill Report

06/10/2020

71114.03

Miscellaneous

20 3rd Quarter - Emergency Preparedness Augmentation

Drill Report

09/17/2020

71114.03

Miscellaneous

20 4th Quarter - Emergency Preparedness Augmentation

Drill Report

01/19/2021

71114.03

Miscellaneous

21 1st Quarter - Emergency Preparedness Augmentation

Drill Report

2/25/2021

71114.03

Miscellaneous

21 2nd Quarter - Emergency Preparedness Augmentation

Drill Report

06/18/2021

71114.03

Miscellaneous

21 3rd Quarter - Emergency Preparedness Augmentation

Drill Report

09/22/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.03

Miscellaneous

21 4th Quarter - Emergency Preparedness Augmentation

Drill Report

01/05/2022

71114.03

Procedures

EP-2014-01

EP Drills and Exercises Development Guide

71114.03

Procedures

EP-902

Notifications

71114.04

Corrective Action

Documents

Condition Reports

20-01082

71114.04

Miscellaneous

Palo Verde On-Shift Emergency Response Organization

Staffing and Capabilities Analysis (Validated for Emergency

Plan License Amendment), September 5, 2019

09/10/2019

71114.04

Miscellaneous

2-07981-

MLL/MDD

Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,

and 3 and Independent Spent Fuel Storage Installation

(ISFSI); Docket Nos. STN 50-528, 50-529, 50-530 and 72-

44; Renewed Operating License Nos. NPF-41, NPF-51 and

NPF-74; License Amendment Request for Changes to

Emergency Plan Staffing Requirements

10/18/2019

71114.04

Miscellaneous

2-08074-

BJR/MSC

Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,

and 3 and Independent Spent Fuel Storage Installation

(ISFSI); Docket Nos. STN 50-528, 50-529, 50-530 and 72-

44; Renewed Operating License Nos. NPF-41, NPF-51 and

NPF-74; APS Response to Request for Additional

Information for Changes to PVNGS Emergency Plan Staffing

Requirements

03/13/2020

71114.04

Miscellaneous

2-08294-CS/LH

Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,

and 3 and Independent Spent Fuel Storage Installation;

Docket Nos. 50-528, 50-529, 50-530 and 72-44; License

Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency

Plan, Revision 70

07/22/2021

71114.04

Miscellaneous

2-08295-CS/LH

Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,

and 3 and Independent Spent Fuel Storage Installation;

Docket Nos. 50-528, 50-529, 50-530 and 72-44; License

Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency

Plan, Revision 71

07/22/2021

71114.04

Miscellaneous

Evaluation

Tracking Number

Revision 68 of the Palo Verde Emergency Plan for

Population Update

2/16/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20-003E

71114.04

Miscellaneous

Evaluation

Tracking Number

21-002E

Palo Verde Emergency Plan Revision 71

06/25/2021

71114.04

Miscellaneous

Screening

Tracking Number

20-002s

CR 20-01082 - Evaluate Transitioning the Operations

Advisor - STSC Position to a Pooled Position

03/17/2020

71114.04

Miscellaneous

Screening

Tracking Number

20-005S

Update to the Palo Verde Emergency Planning Zone (EPZ)

Population

2/10/2020

71114.04

Miscellaneous

Screening

Tracking Number

21-003S

Spent Fuel Pool Shuffle (Spent Fuel Pool Mitigation

Strategy) ENG WO #: 20-08024-004 Rev. 1

2/03/2021

71114.04

Procedures

16DP-0EP22

Emergency Plan Maintenance

14, 15, 16

71114.04

Procedures

EP-904

ERO/ERF Activation and Operation

71114.05

Corrective Action

Documents

20-02795, 20-02903, 20-03079, 20-03080, 20-03630, 20-

04408, 20-04999, 20-06811, 20-08051, 20-08357, 20-

10632, 20-11119, 20-13380, 20-14892, 20-16262, 21-

00598, 21-02100, 21-02312, 21-03196, 21-03668, 21-

04949, 21-06745, 21-09226, 21-09589, 21-09942, 21-

13320, 21-13917, 21-13919, 21-14403, 21-15252, 22-

00329, 22-00330, 22-00558, 22-01272, 22-01759, 22-02816

71114.05

Corrective Action

Documents

Resulting from

Inspection

2-02729, 22-03040, 22-3053 22-03054, 22-03055, 22-

03058

71114.05

Miscellaneous

2101 Full-Scale Dress Rehearsal - ERO White Team

(February 2021)

03/08/2021

71114.05

Miscellaneous

2102 Full-Scale Exercise - ERO White Team (March 2021)

04/23/2021

71114.05

Miscellaneous

2112 - 1st Half 2021, Health Physics Drill Report

06/23/2021

71114.05

Miscellaneous

2010 ERO Training Hybrid Drill Report - ERO Gold Team

(June 30, 2020)

07/24/2020

71114.05

Miscellaneous

Medical Emergency Event Report (Actual Event)

11/24/2020

71114.05

Miscellaneous

21 Onsite Contaminated Injury Medical Emergency/Health 01/05/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Physics Drill Report

71114.05

Miscellaneous

2002 Full-Scale Exercise - ERO Blue Team (March 2020)

04/01/2020

71114.05

Miscellaneous

2005 - Health Physics Drill Report

06/18/2020

71114.05

Miscellaneous

2007 & 2008 ERO Training Hybrid Drills Report - ERO White

Team (August 11, 2020) & ERO Red Team (August 18,

20)

09/17/2020

71114.05

Miscellaneous

2009 - Health Physics Drill Report

01/08/2021

71114.05

Miscellaneous

20 Onsite Medical Emergency Drill Report - Rev 1

11/23/2020

71114.05

Miscellaneous

2012 ERO Training Hybrid Drill Report - ERO Green Team

(December 15, 2020)

01/21/2021

71114.05

Miscellaneous

2013 ERO Training Hybrid Drill Report - ERO Blue Team

(September 1, 2020)

09/17/2020

71114.05

Miscellaneous

2106 ERO Drill - ERO Green Team (June 8th, 2021)

07/09/2021

71114.05

Miscellaneous

2111 ERO Drill - ERO Red Team (November 23rd, 2021)

Revision 01

2/09/2022

71114.05

Miscellaneous

Nuclear Assurance Department (NAD) Audit Report, Audit

20-007 Emergency Preparedness

11/20/2020

71114.05

Miscellaneous

Nuclear Assurance Department (NAD) Audit Report, Audit

21-007 Emergency Preparedness

11/19/2021

71114.05

Miscellaneous

20-03146-001

Actual Event Investigation - Seismic Occurrence 3/5/2020

04/07/2020

71114.05

Miscellaneous

20-13380-001

Actual Event Investigation - Smoke from Circ Water Vent

Valve

11/18/2020

71114.05

Miscellaneous

20-14456-001

Actual Event Investigation - Polar Crane Arc Flash

11/19/2020

71114.05

Miscellaneous

21-03325

Actual Event Investigation - Substation F Failure & Smoke

05/28/2021

71114.05

Miscellaneous

21-05934

Actual Event Investigation - EPlan Evaluation of Loss of

Inverter Output Coincident with Fire Alarm and Smoke

06/11/2021

71114.05

Miscellaneous

21-06338-001

Actual Event Investigation - Unit 2 Trip

07/28/2021

71114.05

Miscellaneous

21-13917-001

Actual Event Investigation - Smoke from the Technical

Support Center

01/26/2022

71114.05

Miscellaneous

21-14185-002

Actual Event Investigation - Multiple Indications of Fire in the

Cable Spreading Room

11/19/2020

71114.05

Miscellaneous

21-14696-001

Actual Event Investigation - Fire Outside the PA

01/26/2022

71114.05

Miscellaneous

Evaluation 21-

00612-004

Maintenance On-Shift ERO Unqualified Worker Trend, Event

Date: 1/27/2021, Level 2 CAQ Causal Analysis Report

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Miscellaneous

ID: 240-02890

20 Annual Review of PVGS Emergency Plan Letters of

Agreement and Offsite Program Commitments

11/12/2020

71114.05

Miscellaneous

KLD TR-1210

Palo Verde Nuclear Generating Station 2020 Population

Update Analysis

2/3/2020

71114.05

Procedures

Joint Public Information Procedure: Media and Public

Information Dissemination

34, 35

71114.05

Procedures

01DP-0AP12

Condition Reporting Process

71114.05

Procedures

01DP-0AP12-01

Condition Reporting Process Administrative Guideline

71114.05

Procedures

16DP-0EP23

Emergency Preparedness Drill and Exercise Program

Management

71114.05

Procedures

16DP-0EP31

Emergency Preparedness Equipment Out of Service

71114.05

Procedures

60DP-0QQ19

Internal Audits

71114.05

Procedures

EP-905

Protective Actions

71114.05

Work Orders

Work Order 29421, 5365608, 5420882, 5428712

71114.06

Corrective Action

Documents

2-01144, 22-01163, 22-01169, 22-01155, 22-01157, 22-

01158, 22-00175, 22-01352

71114.06

Miscellaneous

22 Emergency Preparedness Scenario 2201

71114.06

Miscellaneous

The Emergency Response Organization Newsletter -

February 4, 2022, ERO Response Time

2/04/2022

22 Emergency Preparedness Scenario 2202

71114.06

Miscellaneous

21 ERO Dress Rehearsal Drill - ERO Green Team

(February 1st, 2022) Drill Report

03/18/2022

71114.06

Miscellaneous

EP-0801H

[Emergency Action Level] Classification Matrix Hot

Conditions ([Reactor Coolant System] > 210°F)

71114.06

Miscellaneous

EP-0803H

[Protective Action Recommendation] Flowchart

71114.06

Miscellaneous

EP-0804G

Release Evaluation Flowchart

71114.06

Miscellaneous

EP-0930B

[Emergency Action Level] Classification Matrix All Conditions

71114.06

Procedures

40EP-9EO04

Steam Generator Tube Rupture

71114.06

Procedures

EP-0900-900

ERO Positions, Emergency Coordinator (TSC)

001

71114.06

Procedures

EP-0904

ERO/ERF Activation and Operation

71151

Miscellaneous

Unit 1 PI Summary Report

01/11/2022

71151

Miscellaneous

Unit 2 PI Summary Report

01/11/2022

71151

Miscellaneous

Unit 3 PI Summary Report

01/11/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71151

Miscellaneous

Palo Verde Nuclear Generating Station Siren Operating

Manual

2/30/2021

71151

Miscellaneous

Palo Verde Nuclear Generating Station, Alert and

Notification System (ANS) FEMA 350 Report, July 2019

71151

Miscellaneous

NEI 99-02

Regulatory Assessment Performance Indicator Guideline

71151

Procedures

16DP-0EP19

Performance Indicator Emergency Preparedness

Cornerstone

71151

Procedures

16DP-0EP27

Emergency Preparedness Equipment Testing

71151

Procedures

16DP-0EP37

Prompt Notification System

71153

Corrective Action

Documents

21-02209, 21-02212-003, 21-15270

71153

Miscellaneous

Evaluation 21-

209-020

Unit 2 Reactor Trip due to Loss of Non-Class 13.8 kV Bus

without Fast Bus Transfer

71153

Miscellaneous

LER

05000529/2021-

2-00

Unit 2 Reactor Trip During Plant Protection System

Surveillance Testing

07/16/2021

71153

Miscellaneous

UFSAR, section

15.0.2.4

Loss of Off-Site Power Following Turbine Trip

20C

71153

Procedures

2MT-9ZZ33

Maintenance of AM-13.8-1000-4H GE Magne-Blast Circuit

Breakers

71153

Procedures

40DP-9OP34

Switchyard Administrative Control

71153

Work Orders

253670