May 09, 2022
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2022001, 05000529/2022001, AND 05000530/2022001
Dear Mrs. Lacal:
On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On April 7, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000528 and 05000529, and 05000530 License Nos. NPF-41, NPF-51 and NPF-74
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000528, 05000529 and 05000530
License Numbers:
Report Numbers:
05000528/2022001, 05000529/2022001 and 05000530/2022001
Enterprise Identifier:
I-2022-001-0011
Licensee:
Arizona Public Service Company
Facility:
Palo Verde Nuclear Generating Station
Location:
Tonopah, AZ
Inspection Dates:
January 1, 2022 to March 31, 2022
Inspectors:
L. Merker, Senior Resident Inspector
N. Cuevas, Resident Inspector
S. Hedger, Senior Emergency Preparedness Inspector
E. Lantz, Resident Inspector
Approved By:
John L. Dixon, Jr., Chief
Projects Branch D
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000529/2021-001-00 LER 2021-001-00 for Palo Verde Nuclear Generating Station, Unit 2, Automatic Actuation of the Reactor Protection System Resulting from a Loss of Reactor Coolant Pumps 71153 Closed LER 05000529/2021-002-01 LER 2021-002-01, Palo Verde Nuclear Generating Station (PVNGS) Unit 2,
Reactor Trip during Plant Protection System Surveillance Testing 71153 Closed
PLANT STATUS
Unit 1 entered the inspection period at full power. On March 27, 2022, the unit began a coastdown for refueling outage 1R23.
Unit 2 entered the inspection period at full power. On January 24, 2022, the unit shut down for short notice outage 2M24A to repair a nitrogen leak on safety injection tank 1A and perform repairs on high pressure feedwater heater 5A. On February 6, 2022, the reactor was made critical following completion of the short notice outage and returned to full power on February 8, 2022, where it remained for the remainder of the inspection period.
Unit 3 operated at or near full power for the duration of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1, emergency diesel generator train B during emergency diesel generator train A maintenance outage, on March 4, 2022
- (2) Unit 2, essential cooling water train B following maintenance, on March 22, 2022
- (3) Unit 2, emergency diesel generator train A during emergency diesel generator train B maintenance outage, on March 24, 2022
- (4) Unit 3, low pressure safety injection train B following maintenance, on March 29, 2022
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 1, emergency diesel generator A and emergency diesel generator A control rooms, Fire Zones 21A and 22A, on March 3, 2022
- (2) Unit 3, class 1E 4kV switchgear B room, Fire Zone 5B, on March 18, 2022
- (3) Unit 2, emergency diesel generator B and emergency diesel generator B control rooms, Fire Zones 21B and 22B, on March 24, 2022
- (4) Unit 2, class 1E 125Vdc equipment rooms, Fire Zones 6A, 6B, 7A, and 7B, on March 30, 2022
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire department training and performance during unannounced fire drills on February 14 and March 14, 2022, and their response to smoke from a motor control center cubicle in the Unit 3 class 1E 4kV switchgear B room, on March 17, 2022.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 2 downpower and reactor trip for planned short notice outage 2M24A, on January 24, 2022.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed licensed operator simulator training activities, on January 18, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 1, emergency diesel generator train A, on March 31, 2022
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 3, high risk for planned switchyard maintenance, on February 1, 2022
- (2) Unit 1, high risk for planned supplementary protection system channel calibrations, on February 11, 2022
- (3) Unit 1, high risk for essential spray pond train A diving operations and elevated green risk for planned emergency diesel generator A maintenance outage, on March 4, 2022
- (4) Unit 2, high risk for a containment entry at full power for emergent replacement of failed low steam generator 1 reactor coolant flow trip pressure transmitter D, on March 19, 2022
- (5) Unit 2, high risk for essential spray pond train B diving operations and elevated green risk for planned emergency diesel generator B maintenance outage, on March 23, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 3, emergency diesel generator train A operability determination due to failure of emergency mode fuel control solenoid valve DG-AUV-0011, on February 10, 2022
- (2) Unit 2, main steam isolation valve SGE-UV-171 operability determination due to discovery of a nitrogen leak from a seal weld defect on accumulator A, on February 18, 2022
- (3) Unit 3, high pressure safety injection train A operability determination due to injection valve SIA-UV-627 failing to close, on March 7, 2022
- (4) Unit 1, main steam bypass control valve SGN-PV-1004 functionality assessment due to restoration without the required warmup, on March 21, 2021
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
- (1) Unit 1, atmospheric dump valve SGA-HV-184 testing following calibration of pressure indicator J-SGE-PI-0318 and pressure control valve J-SGA-PCV-0317, on January 20, 2022
- (2) Unit 2, safety injection tank 1A testing following pressure transmitter PT-333 instrument tubing fittings replacement, on January 28, 2022
- (3) Unit 3, emergency diesel generator train A testing following the replacement of emergency mode fuel control solenoid valves DGA-UV-0009 and DGA-UV-0011, on February 14, 2022
- (4) Unit 1, emergency diesel generator train A testing following maintenance outage, on March 25, 2022
- (5) Unit 2, loop calibration testing following low steam generator 1 reactor coolant flow trip pressure transmitter D replacement, on March 25, 2022
- (6) Unit 2, emergency diesel generator train B testing following maintenance outage, on March 31, 2022
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (1 Sample)
- (1) Unit 2, emergency diesel generator B load rejection, 24-hour rated load, and hot start, on February 11, 2022
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Unit 3, essential spray pond pump A inservice testing, on March 19, 2022
71114.02 - Alert and Notification System Testing
Inspection Review (IP Section 02.01-02.04) (1 Sample)
- (1) The inspectors evaluated the maintenance and testing of the alert and notification system between March 1, 2020, and March 14, 2022.
71114.03 - Emergency Response Organization Staffing and Augmentation System
Inspection Review (IP Section 02.01-02.02) (1 Sample)
- (1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between March 1, 2020, and March 14, 2022. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between March 1, 2020, and March 14, 2022. The evaluation reviewed screenings and evaluations documenting implementation of the process. In addition, the inspectors evaluated emergency plan revisions 70 and 71 submitted to the NRC on July 22, 2021. The reviews of the change process documentation or the emergency plan changes do not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspectors evaluated the maintenance of the emergency preparedness program between March 1, 2020, and March 14, 2022. The evaluation reviewed evidence of completing various emergency plan commitments, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated an emergency preparedness drill on February 1, 2022.
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated an emergency preparedness drill on March 8,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
- (3) Unit 3 (January 1, 2021 through December 31, 2021)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (3 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
- (3) Unit 3 (January 1, 2021 through December 31, 2021)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (3 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
- (3) Unit 3 (January 1, 2021 through December 31, 2021)
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)
- (1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)
EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)
71153 - Follow Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)
The inspectors evaluated the following licensee event reports (LERs):
- (1) LER 05000529/2021-001-00, Unit 2, Automatic Actuation of the Reactor Protection System Resulting from a Loss of Reactor Coolant Pumps (ADAMS Accession No.
ML21113A313). The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foresee and correct and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified.
- (2) LER 05000529/2021-002-01, Unit 2 Reactor Trip During Plant Protection System Surveillance Testing (ADAMS Accession No. ML22032A112). The inspectors reviewed the updated LER submittal and identified no additional performance deficiencies or violations of NRC requirements. The previous LER submittal was reviewed, and an associated violation of NRC requirements was documented in Inspection Report 05000528/2021003, 05000529/2021003, and 05000530/2021003 (ADAMS accession: ML21311A00).
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On March 25, 2022, the inspectors presented the emergency preparedness program inspection results to Mrs. Maria Lacal, Executive Vice President, Chief Nuclear Officer, and other members of the licensee staff.
On April 7, 2022, the inspectors presented the integrated inspection results to Mrs. Maria Lacal, Executive Vice President, Chief Nuclear Officer, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
16-14387, 22-02913, 16-15294, 22-03189
Drawings
01-M-EWP-001
P & I Diagram Essential Cooling Water System
Drawings
01-M-SIP-001
P & I Diagram Safety Injection & Shutdown Cooling System
Drawings
2-M-DGP-001
P & I Diagram Diesel Generator System
Procedures
Appendix 232: LM - Placing Train B LPSI in Standby
Procedures
Procedures
Procedures
Essential Cooling Water System (EW) Train B
Procedures
Diesel Generator A Test
Procedures
Diesel Generator B Test
Procedures
Train B LPSI and CS System Alignment Verification
Procedures
Safety Injection Train B ECCS Throttle Valves - Inservice
Test
Calculations
13-MC-FP-0803
Combustible Loads - Control Building
Corrective Action
Documents
2-02653, 22-02734, 22-02766, 22-02733, 22-02739, 16-
18974, FSCCR 5423057, 22-02813
Corrective Action
Documents
13-MC-FP-0808
Combustible Loads - Diesel Generator Building
Drawings
13-A-ZYD-29
Fire Protection Control Building Floor Plan at Elevation 100-
Fire Plans
Pre-fire Strategies Manual
Miscellaneous
USFSAR, Appendix 9B, Fire Protection Evaluation Report
Miscellaneous
UFSAR, Appendix 9B, Fire Protection Evaluation Report
20C
Miscellaneous
Unit 1 Tamper/Vital/Security Tour, Firewatch Tour February
- March 3, 2022
03/03/2022
Miscellaneous
PVGS Pre-Fire Strategies Manual
Miscellaneous
Fire Department Training Program Administration
Miscellaneous
2-I-03-001
Emergency Response/Incident Investigation Report:
Investigate Smoke/Odor in Unit 3 Control Building
Switchgear B
03/17/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
NPL41-D-1Q1A-
Unannounced Backshift Drill Report
Miscellaneous
NPL41-D-1Q1A-
Unit 1 Palo Verde Nuclear Fire Department
Backshift/Unannounced Fire Drill A Shift Scenario
2/11/2022
Miscellaneous
NPL41-D-1Q3C-
Unannounced Backshift Drill Report
Miscellaneous
TD 280505
3EPHBM3221**CKTBRK - Diesel Gen Stator Spacehtr 1E-
DGB-H01H CKTBRK
03/17/2022
Procedures
Fire Systems Impairments and Notifications
Procedures
Emergency Notification and Response
Procedures
Control of Transient Combustibles
Procedures
Fire Protection Test Program Requirement
Procedures
Appendix R & Former Tech Spec Penetration Seal
Surveillance
Procedures
Appendix R & Former Tech Spec Penetration Seal
Surveillance
Procedures
Diesel Generator B Alarm Panel Responses
Procedures
Panel B01C Alarm Responses
Procedures
Control of Doors, Hatches and Floor Plugs
Procedures
Work Orders
28106
Corrective Action
Documents
2-00769
Miscellaneous
Unit 2 Control Room Logs
01/24/2022
Miscellaneous
01/24/2022
Miscellaneous
SES-0-09-U-08
Licensed Operator Continuing Training Simulator Evaluation
Scenario: Inad B CIAS / Degraded Vacuum / Stat Cool
Pump Trip / Loss of Both MFPs / AFN Suct Seizure / Small
Break LOCA / NBN-X03 w/ EDG Fail
Procedures
Standard Post Trip Actions
Procedures
Procedures
Feedwater pump turbine A
Procedures
Short Notice Outage
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
2-02105, 22-02118, 22-02257, 22-02214, 22-02224, 22-
231, 22-02326, 22-02181, 22-02224
Miscellaneous
Performance Criteria Formulation Bases for DG System
Miscellaneous
Performance Criteria Formulation Bases for HD System
(Diesel Building HVAC)
Miscellaneous
Unit 1 Maintenance Rule SSC Unavailability (UA) Report
01/21/2022
Miscellaneous
Unit 1 Maintenance Rule SSC Unavailability (UA) Report
03/22/2022
Miscellaneous
Unit 1 Emergency Diesel Generator Train B Performance
Monitoring Group Report
03/03/2022
Procedures
Mechanical System Cleanliness
Procedures
Installation and Removal of DG A Temporary Piping
Supports
Procedures
Cleaning, Inspection, and Testing of the Class 1E Diesel
Generator
Procedures
Maintenance Rule
Work Orders
297453, 5297477, 5297555, 5297631, 5423702
Corrective Action
Documents
2-00094, 22-00255, 22-00501, 22-00937, 22-00942, 22-
01061, 22-01477, 22-01486, 22-01518, 16-08430, 22-
2070, 22-02109, 21-12743, 22-02134, 22-02526, 22-
2778, 10-00132, 20-12656, 22-02848
Drawings
2-J-RCE-0072
Instrument Loop Wiring Diagram Reactor Coolant System
Drawings
A-774-7.2
Palo Verde 500kV Switchyard Control House Drawing Index
Miscellaneous
Palo Verde Configuration First Quarter of 2022 PowerPoint
Presentation
Miscellaneous
Work Week 2147 Schedule Risk Evaluation
Miscellaneous
Work Week 2201 Schedule Risk Evaluation
Miscellaneous
Work Week 2202 Schedule Risk Evaluation
Miscellaneous
Work Week 2203 Schedule Risk Evaluation
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary
Report as of 02/28/2022 04:10
2/28/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary
Report as of 03/01/2022 01:22
03/01/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary
03/02/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Report as of 03/02/2022 08:52
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary
Report as of 03/02/2022 15:24
03/02/2022
Miscellaneous
Unit 1 Protected Equipment Scheme for DG/EC/EW/SP A
Outage (DG/EC/EW/SP B Protected)
2/27/2022
Miscellaneous
Work Week 2209 Schedule Risk Evaluation
2/28/2022
Miscellaneous
Work Week 2212 Schedule Risk Evaluation
03/18/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary
Report as of 03/21/2022 01:08
03/21/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary
Report as of 03/22/2022 03:42
03/22/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary
Report as of 03/22/2022 12:00
03/22/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary
Report as of 03/22/2022 12:25
03/22/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary
Report as of 03/22/2022 14:20
03/22/2022
Miscellaneous
Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary
Report as of 03/23/2022 02:19
03/23/2022
Miscellaneous
Unit 2 Protected Equipment Scheme for EW, EC and SP B
INOP;
03/20/2022
Miscellaneous
Unit 2 Protected Equipment Scheme for DG B Being
INOPERABLE (DG A Protected);
03/20/2022
Miscellaneous
Unit 1 Work Week 2206 Schedule Risk Evaluation
Miscellaneous
High Risk Activity Mitigation Summary - Work Week 2206
Miscellaneous
25015
Job Hazard Analysis Form for at Power Containment Entry
to Troubleshoot and Rework RCD-FLOOP-115D
Components
03/07/2022
Miscellaneous
VTD-I204-00025
ITT Barton Models 764 Differential Pressure Electronic
Transmitter Installation and Operational Manual
Procedures
Management of Critical Evolutions and Infrequently
Performed Tests or Evolutions
Procedures
Heat Stress Prevention Program, Rev. 11 - heat stress
append G
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Online Integrated Risk
Procedures
Supplementary Protection System Channel Calibration
Procedures
Protected Equipment
Procedures
Switchyard Administrative Control
Procedures
Operations Department Online Nuclear Risk Determination
Modes 1 and 2
Procedures
Containment Entry in MODE 1 Through MODE 4
Procedures
Procedures
Procedures
Containment Cleanliness Inspection
Procedures
Inoperable Power Sources Action Statement
Work Orders
5198819, 5248005, 5297490, 5324635, 5423562, 5301642
Calculations
13-MC-SG-0821
MSIV & MFIV Accumulator Tubing Adapter Stress
Determination
Corrective Action
Documents
21-14375, 21-14538, 21-14654, 22-00155, 22-01328, 18-
201, 21-14350, 21-14377, 22-00828
Drawings
01-M-SGP-001
P & I Diagram Main Steam System (Sheet 2)
Drawings
03-M-DGP-001
P & I Diagram control Air Diesel Generator System
Drawings
03-M-SIP-0002
P & I Diagram Safety Injection and Shutdown Cooling
System
Drawings
Adapter Fitting For Hydraulic Accumulator SAE#6 Straight
Thread SPL. Male Connector with 3/8 Dia. Tubing
Drawings
M018-00119
Control Diagram Shutdown System
Engineering
Changes
18-14201-010
New Know Design/Installation Method for 910 and 911
Series Hand-switches
Engineering
Changes
2019-00761
See Design Equivalent Change - Alternate Detail Package
18-14201-010 for the Required Justification and Information
Regarding This Document Change
Miscellaneous
UFSAR, Section 9.5.6 Diesel Generator Starting System
20C
Miscellaneous
PVNGS Design Basis Manual-Diesel Generator, Class 1E
Standby Generation, Fuel Oil Storage and Transfer System
Miscellaneous
Risk Management and Readiness Plan to Troubleshoot and
Rework RCD-PDT-115D Transmitter
03/07/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
13-M-FPR-0008
Appendix R Safety Function Diagram Diesel Generator A
Miscellaneous
13-NS-C075
MSPI Bases Document
Miscellaneous
93-SI-005
HPSI Cold Leg Injection Valves (SIAUV617,627,637,647
and SIABUV616,626,636,646) HPSI Flow Control Valves to
the RCS
Miscellaneous
N001-1104-00384
Valve Assembly 2 Y Type Globe Valve Motor Operated
Miscellaneous
NKASMC041205
Licensed Operator Initial Training Classroom Lesson:
Appendix 2, Figures;
09/10/2019
Miscellaneous
VTD-C600-00001
Control Components Inc. Operation and Maintenance
Manual for Steam By-Pass Control Valves
Miscellaneous
VTD-S547-00002
SENASYS Company - BOM Parts Breakdown Lists for
Coordinated Manual Controls (CMC) 910 or 911 Series
Chart I - Multi-light Oiltight Controls - (www.SENASYS.com)
(PUB #CO-78498) Was: Micro Switch (A Honywell Division)
for CMC
Procedures
Loss of Coolant Accident Technical Guideline
Procedures
Motor Operated Valves Operating Guidelines
Procedures
Operations Condition Reporting Process and Operability
Determination/Functional Assessment
Procedures
Loss of Coolant Accident
Procedures
Appendix 2: Figures
Procedures
Train A 480V Class 1E MCC
Procedures
Procedures
Operation of the Steam Bypass Control System
Work Orders
5157751, 5393537, 5404057, 5393374, 5187527
Calculations
13-JC-DF-0202
Diesel Fuel Oil Storage Tank Level Instrument (DFN-L-33 &
43) Uncertainty Calculation
Calculations
13-JC-RC-0205
Low Reactor Coolant Flow (RCx-PD-115x, RCx-PD-125x)
Setpoint and Uncertainty Calculation
Corrective Action
Documents
2-00155, 22-01328, 22-02573, 22-02597, 21-12743, 22-
2134, 22-02526, 22-02556, 22-02778, 22-03091, 22-
03101, 22-03112, 22-03122, 22-03123, 22-03124
Drawings
01-M-SGP-001
P & I Diagram Main Steam System
Drawings
2-J-RCE-0072
Instrument Loop Wiring Diagram Reactor Coolant System
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Drawings
2-M0SIP-002
P & I Diagram Safety Injection and Shutdown Cooling
System
Drawings
03-M-DGP-001
P & I Diagram Control Air Diesel Generator System
Drawings
M018-00119
Control Diagram Shutdown System
Miscellaneous
Unit 2 Control Room logs
03/25/2022-
03/27/2022
Miscellaneous
13-VTD-T020-
00015
Target Rock Technical Manual for Pressure Regulating
Valves
Miscellaneous
VTD-I204-00025
ITT Barton Models 764 Differential Pressure Electronic
Transmitter Installation and Operational Manual
Miscellaneous
VTD-S958-00002
Swagelok Gaugeable Tube Fittings and Adapter Fittings
Procedures
PPS Transmitter Response Time Test Inside Containment
Procedures
Transmitter Calibration for PPS Parameters 5, 6, 11, 12, 14,
and the Supplementary Protection System
Procedures
PPS Input Loop Calibration for Channel D Parameters 5, 6,
11, 12, 14, and 15
Procedures
Diesel Generator Test Record
Procedures
Procedures
Procedures
Diesel Generator A Test
Procedures
Diesel Generator B Test
Procedures
ADVs - Inservice Test
Work Orders
281613, 5281576, 5388830, 5404057, 5205175, 5233342,
258982, 5298138, 5298110, 5324635, 5379903, 5423562,
27875, 5386055
Calculations
13-EC-PE-0123
Diesel Generator Voltage Meter Loop E-PEN-EI-G01/G02
Uncertainty Calculation
Calculations
13-EC-PE-0124
Diesel Generator Frequency Meter Loop E-PEN-SI-G01/G02
Uncertainty Calculation
Calculations
13-JC-SP-0201
Essential Spray Pond Flow Instruments (SPA-F-0005, SPB-
F-0006, SPN-F-0007, & SPN-F-0008) Setpoint and
Uncertainty Calculation
Corrective Action
Documents
2-00873
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
23834
Safety Function Determination Tracking Sheet for Inoperable
SPAP01
03/02/2022
Procedures
Meter Calibration
Procedures
Diesel Generator Test Record
Procedures
Safety Function Determination Procedure
Procedures
Procedures
Essential Chilled Water and Ventilation Systems Inoperable
Actions Surveillance
Procedures
Inoperable Power Sources Action Statement
Procedures
Class 1E Diesel Generator Load Rejection, 24 Hour Rated
Load and Hot Start Test Train B
Procedures
Essential Spray Pond Pumps - Inservice Test
Work Orders
5317415
Miscellaneous
Palo Verde Nuclear Generating Station, Alert and
Notification System (ANS) FEMA 350 Report, July 2019
Miscellaneous
Palo Verde Nuclear Generating Station Siren Operating
Manual
2/30/2021
Procedures
Emergency Preparedness Equipment Testing
Procedures
Emergency Preparedness Offsite Program
Procedures
Prompt Notification System
Miscellaneous
20 1st Quarter - Emergency Preparedness Augmentation
Test Report
03/19/2020
Miscellaneous
20 2nd Quarter - Emergency Preparedness Augmentation
Drill Report
06/10/2020
Miscellaneous
20 3rd Quarter - Emergency Preparedness Augmentation
Drill Report
09/17/2020
Miscellaneous
20 4th Quarter - Emergency Preparedness Augmentation
Drill Report
01/19/2021
Miscellaneous
21 1st Quarter - Emergency Preparedness Augmentation
Drill Report
2/25/2021
Miscellaneous
21 2nd Quarter - Emergency Preparedness Augmentation
Drill Report
06/18/2021
Miscellaneous
21 3rd Quarter - Emergency Preparedness Augmentation
Drill Report
09/22/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
21 4th Quarter - Emergency Preparedness Augmentation
Drill Report
01/05/2022
Procedures
EP Drills and Exercises Development Guide
Procedures
Notifications
Corrective Action
Documents
Condition Reports
20-01082
Miscellaneous
Palo Verde On-Shift Emergency Response Organization
Staffing and Capabilities Analysis (Validated for Emergency
Plan License Amendment), September 5, 2019
09/10/2019
Miscellaneous
2-07981-
MLL/MDD
Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,
and 3 and Independent Spent Fuel Storage Installation
(ISFSI); Docket Nos. STN 50-528, 50-529, 50-530 and 72-
44; Renewed Operating License Nos. NPF-41, NPF-51 and
NPF-74; License Amendment Request for Changes to
Emergency Plan Staffing Requirements
10/18/2019
Miscellaneous
2-08074-
BJR/MSC
Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,
and 3 and Independent Spent Fuel Storage Installation
(ISFSI); Docket Nos. STN 50-528, 50-529, 50-530 and 72-
44; Renewed Operating License Nos. NPF-41, NPF-51 and
NPF-74; APS Response to Request for Additional
Information for Changes to PVNGS Emergency Plan Staffing
Requirements
03/13/2020
Miscellaneous
2-08294-CS/LH
Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,
and 3 and Independent Spent Fuel Storage Installation;
Docket Nos. 50-528, 50-529, 50-530 and 72-44; License
Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency
Plan, Revision 70
07/22/2021
Miscellaneous
2-08295-CS/LH
Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2,
and 3 and Independent Spent Fuel Storage Installation;
Docket Nos. 50-528, 50-529, 50-530 and 72-44; License
Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency
Plan, Revision 71
07/22/2021
Miscellaneous
Evaluation
Tracking Number
Revision 68 of the Palo Verde Emergency Plan for
Population Update
2/16/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
20-003E
Miscellaneous
Evaluation
Tracking Number
21-002E
Palo Verde Emergency Plan Revision 71
06/25/2021
Miscellaneous
Screening
Tracking Number
20-002s
CR 20-01082 - Evaluate Transitioning the Operations
Advisor - STSC Position to a Pooled Position
03/17/2020
Miscellaneous
Screening
Tracking Number
20-005S
Update to the Palo Verde Emergency Planning Zone (EPZ)
Population
2/10/2020
Miscellaneous
Screening
Tracking Number
21-003S
Spent Fuel Pool Shuffle (Spent Fuel Pool Mitigation
Strategy) ENG WO #: 20-08024-004 Rev. 1
2/03/2021
Procedures
Emergency Plan Maintenance
14, 15, 16
Procedures
ERO/ERF Activation and Operation
Corrective Action
Documents
20-02795, 20-02903, 20-03079, 20-03080, 20-03630, 20-
04408, 20-04999, 20-06811, 20-08051, 20-08357, 20-
10632, 20-11119, 20-13380, 20-14892, 20-16262, 21-
00598, 21-02100, 21-02312, 21-03196, 21-03668, 21-
04949, 21-06745, 21-09226, 21-09589, 21-09942, 21-
13320, 21-13917, 21-13919, 21-14403, 21-15252, 22-
00329, 22-00330, 22-00558, 22-01272, 22-01759, 22-02816
Corrective Action
Documents
Resulting from
Inspection
2-02729, 22-03040, 22-3053 22-03054, 22-03055, 22-
03058
Miscellaneous
2101 Full-Scale Dress Rehearsal - ERO White Team
(February 2021)
03/08/2021
Miscellaneous
2102 Full-Scale Exercise - ERO White Team (March 2021)
04/23/2021
Miscellaneous
2112 - 1st Half 2021, Health Physics Drill Report
06/23/2021
Miscellaneous
2010 ERO Training Hybrid Drill Report - ERO Gold Team
(June 30, 2020)
07/24/2020
Miscellaneous
Medical Emergency Event Report (Actual Event)
11/24/2020
Miscellaneous
21 Onsite Contaminated Injury Medical Emergency/Health 01/05/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Physics Drill Report
Miscellaneous
2002 Full-Scale Exercise - ERO Blue Team (March 2020)
04/01/2020
Miscellaneous
2005 - Health Physics Drill Report
06/18/2020
Miscellaneous
2007 & 2008 ERO Training Hybrid Drills Report - ERO White
Team (August 11, 2020) & ERO Red Team (August 18,
20)
09/17/2020
Miscellaneous
2009 - Health Physics Drill Report
01/08/2021
Miscellaneous
20 Onsite Medical Emergency Drill Report - Rev 1
11/23/2020
Miscellaneous
2012 ERO Training Hybrid Drill Report - ERO Green Team
(December 15, 2020)
01/21/2021
Miscellaneous
2013 ERO Training Hybrid Drill Report - ERO Blue Team
(September 1, 2020)
09/17/2020
Miscellaneous
2106 ERO Drill - ERO Green Team (June 8th, 2021)
07/09/2021
Miscellaneous
2111 ERO Drill - ERO Red Team (November 23rd, 2021)
Revision 01
2/09/2022
Miscellaneous
Nuclear Assurance Department (NAD) Audit Report, Audit
20-007 Emergency Preparedness
11/20/2020
Miscellaneous
Nuclear Assurance Department (NAD) Audit Report, Audit
21-007 Emergency Preparedness
11/19/2021
Miscellaneous
20-03146-001
Actual Event Investigation - Seismic Occurrence 3/5/2020
04/07/2020
Miscellaneous
20-13380-001
Actual Event Investigation - Smoke from Circ Water Vent
Valve
11/18/2020
Miscellaneous
20-14456-001
Actual Event Investigation - Polar Crane Arc Flash
11/19/2020
Miscellaneous
21-03325
Actual Event Investigation - Substation F Failure & Smoke
05/28/2021
Miscellaneous
21-05934
Actual Event Investigation - EPlan Evaluation of Loss of
Inverter Output Coincident with Fire Alarm and Smoke
06/11/2021
Miscellaneous
21-06338-001
Actual Event Investigation - Unit 2 Trip
07/28/2021
Miscellaneous
21-13917-001
Actual Event Investigation - Smoke from the Technical
Support Center
01/26/2022
Miscellaneous
21-14185-002
Actual Event Investigation - Multiple Indications of Fire in the
Cable Spreading Room
11/19/2020
Miscellaneous
21-14696-001
Actual Event Investigation - Fire Outside the PA
01/26/2022
Miscellaneous
Evaluation 21-
00612-004
Maintenance On-Shift ERO Unqualified Worker Trend, Event
Date: 1/27/2021, Level 2 CAQ Causal Analysis Report
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
ID: 240-02890
20 Annual Review of PVGS Emergency Plan Letters of
Agreement and Offsite Program Commitments
11/12/2020
Miscellaneous
KLD TR-1210
Palo Verde Nuclear Generating Station 2020 Population
Update Analysis
2/3/2020
Procedures
Joint Public Information Procedure: Media and Public
Information Dissemination
34, 35
Procedures
Condition Reporting Process
Procedures
Condition Reporting Process Administrative Guideline
Procedures
Emergency Preparedness Drill and Exercise Program
Management
Procedures
Emergency Preparedness Equipment Out of Service
Procedures
Internal Audits
Procedures
Protective Actions
Work Orders
Work Order 29421, 5365608, 5420882, 5428712
Corrective Action
Documents
2-01144, 22-01163, 22-01169, 22-01155, 22-01157, 22-
01158, 22-00175, 22-01352
Miscellaneous
22 Emergency Preparedness Scenario 2201
Miscellaneous
The Emergency Response Organization Newsletter -
February 4, 2022, ERO Response Time
2/04/2022
22 Emergency Preparedness Scenario 2202
Miscellaneous
21 ERO Dress Rehearsal Drill - ERO Green Team
(February 1st, 2022) Drill Report
03/18/2022
Miscellaneous
[Emergency Action Level] Classification Matrix Hot
Conditions ([Reactor Coolant System] > 210°F)
Miscellaneous
[Protective Action Recommendation] Flowchart
Miscellaneous
Release Evaluation Flowchart
Miscellaneous
[Emergency Action Level] Classification Matrix All Conditions
Procedures
Steam Generator Tube Rupture
Procedures
ERO Positions, Emergency Coordinator (TSC)
001
Procedures
ERO/ERF Activation and Operation
71151
Miscellaneous
Unit 1 PI Summary Report
01/11/2022
71151
Miscellaneous
Unit 2 PI Summary Report
01/11/2022
71151
Miscellaneous
Unit 3 PI Summary Report
01/11/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71151
Miscellaneous
Palo Verde Nuclear Generating Station Siren Operating
Manual
2/30/2021
71151
Miscellaneous
Palo Verde Nuclear Generating Station, Alert and
Notification System (ANS) FEMA 350 Report, July 2019
71151
Miscellaneous
Regulatory Assessment Performance Indicator Guideline
71151
Procedures
Performance Indicator Emergency Preparedness
Cornerstone
71151
Procedures
Emergency Preparedness Equipment Testing
71151
Procedures
Prompt Notification System
Corrective Action
Documents
21-02209, 21-02212-003, 21-15270
Miscellaneous
Evaluation 21-
209-020
Unit 2 Reactor Trip due to Loss of Non-Class 13.8 kV Bus
without Fast Bus Transfer
Miscellaneous
LER
05000529/2021-
2-00
Unit 2 Reactor Trip During Plant Protection System
Surveillance Testing
07/16/2021
Miscellaneous
UFSAR, section
15.0.2.4
Loss of Off-Site Power Following Turbine Trip
20C
Procedures
Maintenance of AM-13.8-1000-4H GE Magne-Blast Circuit
Breakers
Procedures
Switchyard Administrative Control
Work Orders
253670