May 09, 2022
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2022001, 05000529/2022001, AND 05000530/2022001
Dear Mrs. Lacal:
On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On April 7, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Dixon, John on 05/09/22 John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Reactor Projects Docket Nos. 05000528 and 05000529, and 05000530 License Nos. NPF-41, NPF-51 and NPF-74
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000528, 05000529 and 05000530 License Numbers: NPF-41, NPF-51 and NPF-74 Report Numbers: 05000528/2022001, 05000529/2022001 and 05000530/2022001 Enterprise Identifier: I-2022-001-0011 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: Tonopah, AZ Inspection Dates: January 1, 2022 to March 31, 2022 Inspectors: L. Merker, Senior Resident Inspector N. Cuevas, Resident Inspector S. Hedger, Senior Emergency Preparedness Inspector E. Lantz, Resident Inspector Approved By: John L. Dixon, Jr., Chief Projects Branch D Division of Operating Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000529/2021-001-00 LER 2021-001-00 for Palo 71153 Closed Verde Nuclear Generating Station, Unit 2, Automatic Actuation of the Reactor Protection System Resulting from a Loss of Reactor Coolant Pumps LER 05000529/2021-002-01 LER 2021-002-01, Palo 71153 Closed Verde Nuclear Generating Station (PVNGS) Unit 2,
Reactor Trip during Plant Protection System Surveillance Testing
PLANT STATUS
Unit 1 entered the inspection period at full power. On March 27, 2022, the unit began a coastdown for refueling outage 1R23.
Unit 2 entered the inspection period at full power. On January 24, 2022, the unit shut down for short notice outage 2M24A to repair a nitrogen leak on safety injection tank 1A and perform repairs on high pressure feedwater heater 5A. On February 6, 2022, the reactor was made critical following completion of the short notice outage and returned to full power on February 8, 2022, where it remained for the remainder of the inspection period.
Unit 3 operated at or near full power for the duration of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1, emergency diesel generator train B during emergency diesel generator train A maintenance outage, on March 4, 2022
- (2) Unit 2, essential cooling water train B following maintenance, on March 22, 2022
- (3) Unit 2, emergency diesel generator train A during emergency diesel generator train B maintenance outage, on March 24, 2022
- (4) Unit 3, low pressure safety injection train B following maintenance, on March 29, 2022
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 1, emergency diesel generator A and emergency diesel generator A control rooms, Fire Zones 21A and 22A, on March 3, 2022
- (2) Unit 3, class 1E 4kV switchgear B room, Fire Zone 5B, on March 18, 2022
- (3) Unit 2, emergency diesel generator B and emergency diesel generator B control rooms, Fire Zones 21B and 22B, on March 24, 2022
- (4) Unit 2, class 1E 125Vdc equipment rooms, Fire Zones 6A, 6B, 7A, and 7B, on
March 30, 2022 Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire department training and performance during unannounced fire drills on February 14 and March 14, 2022, and their response to smoke from a motor control center cubicle in the Unit 3 class 1E 4kV switchgear B room, on March 17, 2022.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during the Unit 2 downpower and reactor trip for planned short notice outage 2M24A, on January 24, 2022.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed licensed operator simulator training activities, on January 18, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 1, emergency diesel generator train A, on March 31, 2022
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 3, high risk for planned switchyard maintenance, on February 1, 2022
- (2) Unit 1, high risk for planned supplementary protection system channel calibrations, on February 11, 2022
- (3) Unit 1, high risk for essential spray pond train A diving operations and elevated green risk for planned emergency diesel generator A maintenance outage, on March 4, 2022
- (4) Unit 2, high risk for a containment entry at full power for emergent replacement of failed low steam generator 1 reactor coolant flow trip pressure transmitter D, on March 19, 2022
- (5) Unit 2, high risk for essential spray pond train B diving operations and elevated green risk for planned emergency diesel generator B maintenance outage, on March 23, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 3, emergency diesel generator train A operability determination due to failure of emergency mode fuel control solenoid valve DG-AUV-0011, on February 10, 2022
- (2) Unit 2, main steam isolation valve SGE-UV-171 operability determination due to discovery of a nitrogen leak from a seal weld defect on accumulator A, on February 18, 2022
- (3) Unit 3, high pressure safety injection train A operability determination due to injection valve SIA-UV-627 failing to close, on March 7, 2022
- (4) Unit 1, main steam bypass control valve SGN-PV-1004 functionality assessment due to restoration without the required warmup, on March 21, 2021
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
- (1) Unit 1, atmospheric dump valve SGA-HV-184 testing following calibration of pressure indicator J-SGE-PI-0318 and pressure control valve J-SGA-PCV-0317, on January 20, 2022
- (2) Unit 2, safety injection tank 1A testing following pressure transmitter PT-333 instrument tubing fittings replacement, on January 28, 2022
- (3) Unit 3, emergency diesel generator train A testing following the replacement of emergency mode fuel control solenoid valves DGA-UV-0009 and DGA-UV-0011, on February 14, 2022
- (4) Unit 1, emergency diesel generator train A testing following maintenance outage, on March 25, 2022
- (5) Unit 2, loop calibration testing following low steam generator 1 reactor coolant flow trip pressure transmitter D replacement, on March 25, 2022
- (6) Unit 2, emergency diesel generator train B testing following maintenance outage, on March 31, 2022
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (1 Sample)
- (1) Unit 2, emergency diesel generator B load rejection, 24-hour rated load, and hot start, on February 11, 2022
Inservice Testing (IP Section 03.01) (1 Sample)
- (1) Unit 3, essential spray pond pump A inservice testing, on March 19, 2022
71114.02 - Alert and Notification System Testing
Inspection Review (IP Section 02.01-02.04) (1 Sample)
- (1) The inspectors evaluated the maintenance and testing of the alert and notification system between March 1, 2020, and March 14, 2022.
71114.03 - Emergency Response Organization Staffing and Augmentation System
Inspection Review (IP Section 02.01-02.02) (1 Sample)
- (1) The inspectors evaluated the readiness of the Emergency Preparedness Organization between March 1, 2020, and March 14, 2022. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between March 1, 2020, and March 14, 2022. The evaluation reviewed screenings and evaluations documenting implementation of the process. In addition, the inspectors evaluated emergency plan revisions 70 and 71 submitted to the NRC on July 22, 2021. The reviews of the change process documentation or the emergency plan changes do not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspectors evaluated the maintenance of the emergency preparedness program between March 1, 2020, and March 14, 2022. The evaluation reviewed evidence of completing various emergency plan commitments, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
- (1) The inspectors evaluated an emergency preparedness drill on February 1, 2022.
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated an emergency preparedness drill on March 8,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) ===
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
- (3) Unit 3 (January 1, 2021 through December 31, 2021)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
(3 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
- (3) Unit 3 (January 1, 2021 through December 31, 2021)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (3 Samples)
- (1) Unit 1 (January 1, 2021 through December 31, 2021)
- (2) Unit 2 (January 1, 2021 through December 31, 2021)
- (3) Unit 3 (January 1, 2021 through December 31, 2021)
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)
- (1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13)
(1 Sample)
- (1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)
EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) Units 1, 2, and 3 (January 1, 2021 through December 31, 2021)
71153 - Follow Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)
The inspectors evaluated the following licensee event reports (LERs):
- (1) LER 05000529/2021-001-00, Unit 2, Automatic Actuation of the Reactor Protection System Resulting from a Loss of Reactor Coolant Pumps (ADAMS Accession No.
ML21113A313). The inspectors determined that the cause of the condition described in the LER was not reasonably within the licensees ability to foresee and correct and therefore was not reasonably preventable. No performance deficiency nor violation of NRC requirements was identified.
- (2) LER 05000529/2021-002-01, Unit 2 Reactor Trip During Plant Protection System Surveillance Testing (ADAMS Accession No. ML22032A112). The inspectors reviewed the updated LER submittal and identified no additional performance deficiencies or violations of NRC requirements. The previous LER submittal was reviewed, and an associated violation of NRC requirements was documented in Inspection Report 05000528/2021003, 05000529/2021003, and 05000530/2021003 (ADAMS accession: ML21311A00).
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On March 25, 2022, the inspectors presented the emergency preparedness program inspection results to Mrs. Maria Lacal, Executive Vice President, Chief Nuclear Officer, and other members of the licensee staff.
On April 7, 2022, the inspectors presented the integrated inspection results to Mrs. Maria Lacal, Executive Vice President, Chief Nuclear Officer, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.04 Corrective Action 16-14387, 22-02913, 16-15294, 22-03189
Documents
71111.04 Drawings 01-M-EWP-001 P & I Diagram Essential Cooling Water System 33
71111.04 Drawings 01-M-SIP-001 P & I Diagram Safety Injection & Shutdown Cooling System 57
71111.04 Drawings 02-M-DGP-001 P & I Diagram Diesel Generator System 63
71111.04 Procedures 40EP-9EO10-232 Appendix 232: LM - Placing Train B LPSI in Standby 0
71111.04 Procedures 40OP-9DG01 Emergency Diesel Generator A 80
71111.04 Procedures 40OP-9DG02 Emergency Diesel Generator B 78
71111.04 Procedures 40OP-9EW02 Essential Cooling Water System (EW) Train B 29
71111.04 Procedures 40ST-9DG01 Diesel Generator A Test 51
71111.04 Procedures 40ST-9DG02 Diesel Generator B Test 56
71111.04 Procedures 40ST-9SI14 Train B LPSI and CS System Alignment Verification 2
71111.04 Procedures 73ST-9XI52 Safety Injection Train B ECCS Throttle Valves - Inservice 3
Test
71111.05 Calculations 13-MC-FP-0803 Combustible Loads - Control Building 17
71111.05 Corrective Action 22-02653, 22-02734, 22-02766, 22-02733, 22-02739, 16-
Documents 18974, FSCCR 5423057, 22-02813
71111.05 Corrective Action 13-MC-FP-0808 Combustible Loads - Diesel Generator Building 6
Documents
71111.05 Drawings 13-A-ZYD-29 Fire Protection Control Building Floor Plan at Elevation 100- 23
71111.05 Fire Plans Pre-fire Strategies Manual 29
71111.05 Miscellaneous USFSAR, Appendix 9B, Fire Protection Evaluation Report 21
71111.05 Miscellaneous UFSAR, Appendix 9B, Fire Protection Evaluation Report 20C
71111.05 Miscellaneous Unit 1 Tamper/Vital/Security Tour, Firewatch Tour February 03/03/2022
- March 3, 2022
71111.05 Miscellaneous PVGS Pre-Fire Strategies Manual 29
71111.05 Miscellaneous 14DP-0TR02 Fire Department Training Program Administration 31
71111.05 Miscellaneous 22-I-03-001 Emergency Response/Incident Investigation Report: 03/17/2022
Investigate Smoke/Odor in Unit 3 Control Building
Switchgear B
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.05 Miscellaneous NPL41-D-1Q1A- Unannounced Backshift Drill Report 0
71111.05 Miscellaneous NPL41-D-1Q1A- Unit 1 Palo Verde Nuclear Fire Department 02/11/2022
Backshift/Unannounced Fire Drill A Shift Scenario
71111.05 Miscellaneous NPL41-D-1Q3C- Unannounced Backshift Drill Report 0
71111.05 Miscellaneous TD 280505 3EPHBM3221**CKTBRK - Diesel Gen Stator Spacehtr 1E- 03/17/2022
DGB-H01H CKTBRK
71111.05 Procedures 14DP-0FP02 Fire Systems Impairments and Notifications 28
71111.05 Procedures 14DP-0FP32 Emergency Notification and Response 38
71111.05 Procedures 14DP-0FP33 Control of Transient Combustibles 33
71111.05 Procedures 14DP-0FP44 Fire Protection Test Program Requirement 5
71111.05 Procedures 14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal 13
Surveillance
71111.05 Procedures 14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal 15
Surveillance
71111.05 Procedures 40AL-9DG02 Diesel Generator B Alarm Panel Responses 35
71111.05 Procedures 40AL-9RK1C Panel B01C Alarm Responses 7
71111.05 Procedures 40DP-9ZZ17 Control of Doors, Hatches and Floor Plugs 69
71111.05 Procedures 40OP-9DG02 Emergency Diesel Generator B 78
71111.05 Work Orders 5428106
71111.11Q Corrective Action 22-00769
Documents
71111.11Q Miscellaneous Unit 2 Control Room Logs 01/24/2022
71111.11Q Miscellaneous U2C24 SNO Downpower Gameplan 01/24/2022
71111.11Q Miscellaneous SES-0-09-U-08 Licensed Operator Continuing Training Simulator Evaluation
Scenario: Inad B CIAS / Degraded Vacuum / Stat Cool
Pump Trip / Loss of Both MFPs / AFN Suct Seizure / Small
Break LOCA / NBN-X03 w/ EDG Fail
71111.11Q Procedures 40EP-9EO01 Standard Post Trip Actions 23
71111.11Q Procedures 40EP-9EO02 Reactor Trip 14
71111.11Q Procedures 40OP-9FT01 Feedwater pump turbine A 60
71111.11Q Procedures 40OP-9ZZ24 Short Notice Outage 54
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.12 Corrective Action 22-02105, 22-02118, 22-02257, 22-02214, 22-02224, 22-
Documents 02231, 22-02326, 22-02181, 22-02224
71111.12 Miscellaneous Performance Criteria Formulation Bases for DG System 5
71111.12 Miscellaneous Performance Criteria Formulation Bases for HD System 1
(Diesel Building HVAC)
71111.12 Miscellaneous Unit 1 Maintenance Rule SSC Unavailability (UA) Report 01/21/2022
71111.12 Miscellaneous Unit 1 Maintenance Rule SSC Unavailability (UA) Report 03/22/2022
71111.12 Miscellaneous Unit 1 Emergency Diesel Generator Train B Performance 03/03/2022
Monitoring Group Report
71111.12 Procedures 30DP-9MP03 Mechanical System Cleanliness 25
71111.12 Procedures 31MT-9DG05 Installation and Removal of DG A Temporary Piping 6
Supports
71111.12 Procedures 32MT-9PE01 Cleaning, Inspection, and Testing of the Class 1E Diesel 47
Generator
71111.12 Procedures 70DP-0MR01 Maintenance Rule 46
71111.12 Work Orders 5297453, 5297477, 5297555, 5297631, 5423702
71111.13 Corrective Action 22-00094, 22-00255, 22-00501, 22-00937, 22-00942, 22-
Documents 01061, 22-01477, 22-01486, 22-01518, 16-08430, 22-
2070, 22-02109, 21-12743, 22-02134, 22-02526 , 22-
2778, 10-00132, 20-12656, 22-02848
71111.13 Drawings 02-J-RCE-0072 Instrument Loop Wiring Diagram Reactor Coolant System 7
71111.13 Drawings A-774-7.2 Palo Verde 500kV Switchyard Control House Drawing Index 19
71111.13 Miscellaneous Palo Verde Configuration First Quarter of 2022 PowerPoint 20
Presentation
71111.13 Miscellaneous Work Week 2147 Schedule Risk Evaluation
71111.13 Miscellaneous Work Week 2201 Schedule Risk Evaluation
71111.13 Miscellaneous Work Week 2202 Schedule Risk Evaluation
71111.13 Miscellaneous Work Week 2203 Schedule Risk Evaluation
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary 02/28/2022
Report as of 02/28/2022 04:10
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary 03/01/2022
Report as of 03/01/2022 01:22
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary 03/02/2022
Inspection Type Designation Description or Title Revision or
Procedure Date
Report as of 03/02/2022 08:52
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 1 Current Risk Summary 03/02/2022
Report as of 03/02/2022 15:24
71111.13 Miscellaneous Unit 1 Protected Equipment Scheme for DG/EC/EW/SP A 02/27/2022
Outage (DG/EC/EW/SP B Protected)
71111.13 Miscellaneous Work Week 2209 Schedule Risk Evaluation 02/28/2022
71111.13 Miscellaneous Work Week 2212 Schedule Risk Evaluation 03/18/2022
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary 03/21/2022
Report as of 03/21/2022 01:08
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary 03/22/2022
Report as of 03/22/2022 03:42
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary 03/22/2022
Report as of 03/22/2022 12:00
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary 03/22/2022
Report as of 03/22/2022 12:25
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary 03/22/2022
Report as of 03/22/2022 14:20
71111.13 Miscellaneous Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary 03/23/2022
Report as of 03/23/2022 02:19
71111.13 Miscellaneous Unit 2 Protected Equipment Scheme for EW, EC and SP B 03/20/2022
INOP;
71111.13 Miscellaneous Unit 2 Protected Equipment Scheme for DG B Being 03/20/2022
INOPERABLE (DG A Protected);
71111.13 Miscellaneous Unit 1 Work Week 2206 Schedule Risk Evaluation
71111.13 Miscellaneous High Risk Activity Mitigation Summary - Work Week 2206
71111.13 Miscellaneous 5425015 Job Hazard Analysis Form for at Power Containment Entry 03/07/2022
to Troubleshoot and Rework RCD-FLOOP-115D
Components
71111.13 Miscellaneous VTD-I204-00025 ITT Barton Models 764 Differential Pressure Electronic 6
Transmitter Installation and Operational Manual
71111.13 Procedures 01DP-0AP57 Management of Critical Evolutions and Infrequently 2
Performed Tests or Evolutions
71111.13 Procedures 01DP-0IS17 Heat Stress Prevention Program, Rev. 11 - heat stress 11
append G
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.13 Procedures 02DP-0RS01 Online Integrated Risk 9
71111.13 Procedures 36ST-9SB14 Supplementary Protection System Channel Calibration 21
71111.13 Procedures 40DP-9AP21 Protected Equipment 7
71111.13 Procedures 40DP-9OP34 Switchyard Administrative Control 22
71111.13 Procedures 40DP-9RS01 Operations Department Online Nuclear Risk Determination 7
Modes 1 and 2
71111.13 Procedures 40DP-9ZZ01 Containment Entry in MODE 1 Through MODE 4 44
71111.13 Procedures 40OP-9DG01 Emergency Diesel Generator A 80
71111.13 Procedures 40OP-9DG02 Emergency Diesel Generator B 78
71111.13 Procedures 40ST-9ZZ09 Containment Cleanliness Inspection 25
71111.13 Procedures 40ST-9ZZ37 Inoperable Power Sources Action Statement 6
71111.13 Work Orders 5198819, 5248005, 5297490, 5324635, 5423562, 5301642
71111.15 Calculations 13-MC-SG-0821 MSIV & MFIV Accumulator Tubing Adapter Stress 0
Determination
71111.15 Corrective Action 21-14375, 21-14538, 21-14654, 22-00155, 22-01328, 18-
Documents 14201, 21-14350, 21-14377, 22-00828
71111.15 Drawings 01-M-SGP-001 P & I Diagram Main Steam System (Sheet 2) 72
71111.15 Drawings 03-M-DGP-001 P & I Diagram control Air Diesel Generator System 62
71111.15 Drawings 03-M-SIP-0002 P & I Diagram Safety Injection and Shutdown Cooling 38
System
71111.15 Drawings 13-M234A-00093 Adapter Fitting For Hydraulic Accumulator SAE#6 Straight 4
Thread SPL. Male Connector with 3/8 Dia. Tubing
71111.15 Drawings M018-00119 Control Diagram Shutdown System 6
71111.15 Engineering 18-14201-010 New Know Design/Installation Method for 910 and 911 0
Changes Series Hand-switches
71111.15 Engineering 2019-00761 See Design Equivalent Change - Alternate Detail Package 0
Changes 18-14201-010 for the Required Justification and Information
Regarding This Document Change
71111.15 Miscellaneous UFSAR, Section 9.5.6 Diesel Generator Starting System 20C
71111.15 Miscellaneous PVNGS Design Basis Manual- Diesel Generator, Class 1E 28
Standby Generation, Fuel Oil Storage and Transfer System
71111.15 Miscellaneous Risk Management and Readiness Plan to Troubleshoot and 03/07/2022
Rework RCD-PDT-115D Transmitter
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.15 Miscellaneous 13-M-FPR-0008 Appendix R Safety Function Diagram Diesel Generator A 5
71111.15 Miscellaneous 13-NS-C075 MSPI Bases Document 13
71111.15 Miscellaneous 93-SI-005 HPSI Cold Leg Injection Valves (SIAUV617,627,637,647 0
and SIABUV616,626,636,646) HPSI Flow Control Valves to
the RCS
71111.15 Miscellaneous N001-1104-00384 Valve Assembly 2 Y Type Globe Valve Motor Operated 9
71111.15 Miscellaneous NKASMC041205 Licensed Operator Initial Training Classroom Lesson: 09/10/2019
Appendix 2, Figures;
71111.15 Miscellaneous VTD-C600-00001 Control Components Inc. Operation and Maintenance 3
Manual for Steam By-Pass Control Valves
71111.15 Miscellaneous VTD-S547-00002 SENASYS Company - BOM Parts Breakdown Lists for 0
Coordinated Manual Controls (CMC) 910 or 911 Series
Chart I - Multi-light Oiltight Controls - (www.SENASYS.com)
(PUB #CO-78498) Was: Micro Switch (A Honywell Division)
for CMC
71111.15 Procedures 40DP-9AP08 Loss of Coolant Accident Technical Guideline 29
71111.15 Procedures 40DP-9OP18 Motor Operated Valves Operating Guidelines 24
71111.15 Procedures 40DP-9OP26 Operations Condition Reporting Process and Operability 47
Determination/Functional Assessment
71111.15 Procedures 40EP-9EO03 Loss of Coolant Accident 45
71111.15 Procedures 40EP-9EO10-002 Appendix 2: Figures 3
71111.15 Procedures 40OP-9PH01 Train A 480V Class 1E MCC 16
71111.15 Procedures 40OP-9SG01 Main Steam 80
71111.15 Procedures 40OP-9SH05 Operation of the Steam Bypass Control System 26
71111.15 Work Orders 5157751, 5393537, 5404057, 5393374, 5187527
71111.19 Calculations 13-JC-DF-0202 Diesel Fuel Oil Storage Tank Level Instrument (DFN-L-33 & 9
43) Uncertainty Calculation
71111.19 Calculations 13-JC-RC-0205 Low Reactor Coolant Flow (RCx-PD-115x, RCx-PD-125x) 10
Setpoint and Uncertainty Calculation
71111.19 Corrective Action 22-00155, 22-01328, 22-02573, 22-02597, 21-12743, 22-
Documents 02134, 22-02526, 22-02556, 22-02778, 22-03091, 22-
03101, 22-03112, 22-03122, 22-03123, 22-03124
71111.19 Drawings 01-M-SGP-001 P & I Diagram Main Steam System 72
71111.19 Drawings 02-J-RCE-0072 Instrument Loop Wiring Diagram Reactor Coolant System 7
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.19 Drawings 02-M0SIP-002 P & I Diagram Safety Injection and Shutdown Cooling 37
System
71111.19 Drawings 03-M-DGP-001 P & I Diagram Control Air Diesel Generator System 62
71111.19 Drawings M018-00119 Control Diagram Shutdown System 6
71111.19 Miscellaneous Unit 2 Control Room logs 03/25/2022-
03/27/2022
71111.19 Miscellaneous 13-VTD-T020- Target Rock Technical Manual for Pressure Regulating 2
00015 Valves
71111.19 Miscellaneous VTD-I204-00025 ITT Barton Models 764 Differential Pressure Electronic 6
Transmitter Installation and Operational Manual
71111.19 Miscellaneous VTD-S958-00002 Swagelok Gaugeable Tube Fittings and Adapter Fittings 2
71111.19 Procedures 36ST-9SB41 PPS Transmitter Response Time Test Inside Containment 23
71111.19 Procedures 36ST-9SB58 Transmitter Calibration for PPS Parameters 5, 6, 11, 12, 14, 18
and the Supplementary Protection System
71111.19 Procedures 36ST-9SB62 PPS Input Loop Calibration for Channel D Parameters 5, 6, 15
11, 12, 14, and 15
71111.19 Procedures 40DP-9OP08 Diesel Generator Test Record 54
71111.19 Procedures 40OP-9DG01 Emergency Diesel Generator A 80
71111.19 Procedures 40OP-9DG02 Emergency Diesel Generator B 78
71111.19 Procedures 40ST-9DG01 Diesel Generator A Test 51
71111.19 Procedures 40ST-9DG02 Diesel Generator B Test 56
71111.19 Procedures 73ST-9XI20 ADVs - Inservice Test 57
71111.19 Work Orders 5281613, 5281576, 5388830, 5404057, 5205175, 5233342,
258982, 5298138, 5298110, 5324635, 5379903, 5423562,
27875, 5386055
71111.22 Calculations 13-EC-PE-0123 Diesel Generator Voltage Meter Loop E-PEN-EI-G01/G02 4
Uncertainty Calculation
71111.22 Calculations 13-EC-PE-0124 Diesel Generator Frequency Meter Loop E-PEN-SI-G01/G02 3
Uncertainty Calculation
71111.22 Calculations 13-JC-SP-0201 Essential Spray Pond Flow Instruments (SPA-F-0005, SPB- 16
F-0006, SPN-F-0007, & SPN-F-0008) Setpoint and
Uncertainty Calculation
71111.22 Corrective Action 22-00873
Documents
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.22 Miscellaneous 5423834 Safety Function Determination Tracking Sheet for Inoperable 03/02/2022
SPAP01
71111.22 Procedures 32MT-9ZZ09 Meter Calibration 15
71111.22 Procedures 40DP-9OP08 Diesel Generator Test Record 54
71111.22 Procedures 40DP-9OP37 Safety Function Determination Procedure 11
71111.22 Procedures 40OP-9DG02 Emergency Diesel Generator B 78
71111.22 Procedures 40ST-9EC03 Essential Chilled Water and Ventilation Systems Inoperable 22
Actions Surveillance
71111.22 Procedures 40ST-9ZZ37 Inoperable Power Sources Action Statement 6
71111.22 Procedures 73ST-9DG08 Class 1E Diesel Generator Load Rejection, 24 Hour Rated 14
Load and Hot Start Test Train B
71111.22 Procedures 73ST-9SP01 Essential Spray Pond Pumps - Inservice Test 58
71111.22 Work Orders 5317415
71114.02 Miscellaneous Palo Verde Nuclear Generating Station, Alert and 5
Notification System (ANS) FEMA 350 Report, July 2019
71114.02 Miscellaneous Palo Verde Nuclear Generating Station Siren Operating 12/30/2021
Manual
71114.02 Procedures 16DP-0EP27 Emergency Preparedness Equipment Testing 20
71114.02 Procedures 16DP-0EP29 Emergency Preparedness Offsite Program 11
71114.02 Procedures 16DP-0EP37 Prompt Notification System 9
71114.03 Miscellaneous 2020 1st Quarter - Emergency Preparedness Augmentation 03/19/2020
Test Report
71114.03 Miscellaneous 2020 2nd Quarter - Emergency Preparedness Augmentation 06/10/2020
Drill Report
71114.03 Miscellaneous 2020 3rd Quarter - Emergency Preparedness Augmentation 09/17/2020
Drill Report
71114.03 Miscellaneous 2020 4th Quarter - Emergency Preparedness Augmentation 01/19/2021
Drill Report
71114.03 Miscellaneous 2021 1st Quarter - Emergency Preparedness Augmentation 02/25/2021
Drill Report
71114.03 Miscellaneous 2021 2nd Quarter - Emergency Preparedness Augmentation 06/18/2021
Drill Report
71114.03 Miscellaneous 2021 3rd Quarter - Emergency Preparedness Augmentation 09/22/2021
Drill Report
Inspection Type Designation Description or Title Revision or
Procedure Date
71114.03 Miscellaneous 2021 4th Quarter - Emergency Preparedness Augmentation 01/05/2022
Drill Report
71114.03 Procedures EP-2014-01 EP Drills and Exercises Development Guide 15
71114.03 Procedures EP-902 Notifications 19
71114.04 Corrective Action Condition Reports 20-01082
Documents
71114.04 Miscellaneous Palo Verde On-Shift Emergency Response Organization 09/10/2019
Staffing and Capabilities Analysis (Validated for Emergency
Plan License Amendment), September 5, 2019
71114.04 Miscellaneous 102-07981- Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, 10/18/2019
MLL/MDD and 3 and Independent Spent Fuel Storage Installation
(ISFSI); Docket Nos. STN 50-528, 50-529, 50-530 and 72-
44; Renewed Operating License Nos. NPF-41, NPF-51 and
NPF-74; License Amendment Request for Changes to
Emergency Plan Staffing Requirements
71114.04 Miscellaneous 102-08074- Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, 03/13/2020
BJR/MSC and 3 and Independent Spent Fuel Storage Installation
(ISFSI); Docket Nos. STN 50-528, 50-529, 50-530 and 72-
44; Renewed Operating License Nos. NPF-41, NPF-51 and
NPF-74; APS Response to Request for Additional
Information for Changes to PVNGS Emergency Plan Staffing
Requirements
71114.04 Miscellaneous 102-08294-CS/LH Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, 07/22/2021
and 3 and Independent Spent Fuel Storage Installation;
Docket Nos. 50-528, 50-529, 50-530 and 72-44; License
Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency
Plan, Revision 70
71114.04 Miscellaneous 102-08295-CS/LH Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, 07/22/2021
and 3 and Independent Spent Fuel Storage Installation;
Docket Nos. 50-528, 50-529, 50-530 and 72-44; License
Nos. NPF-41, NPF-51 and NPF-74; PVNGS Emergency
Plan, Revision 71
71114.04 Miscellaneous Evaluation Revision 68 of the Palo Verde Emergency Plan for 12/16/2020
Tracking Number Population Update
Inspection Type Designation Description or Title Revision or
Procedure Date
20-003E
71114.04 Miscellaneous Evaluation Palo Verde Emergency Plan Revision 71 06/25/2021
Tracking Number
21-002E
71114.04 Miscellaneous Screening CR 20-01082 - Evaluate Transitioning the Operations 03/17/2020
Tracking Number Advisor - STSC Position to a Pooled Position
20-002s
71114.04 Miscellaneous Screening Update to the Palo Verde Emergency Planning Zone (EPZ) 12/10/2020
Tracking Number Population
20-005S
71114.04 Miscellaneous Screening Spent Fuel Pool Shuffle (Spent Fuel Pool Mitigation 12/03/2021
Tracking Number Strategy) ENG WO #: 20-08024-004 Rev. 1
21-003S
71114.04 Procedures 16DP-0EP22 Emergency Plan Maintenance 14, 15, 16
71114.04 Procedures EP-904 ERO/ERF Activation and Operation 8
71114.05 Corrective Action 20-02795, 20-02903, 20-03079, 20-03080, 20-03630, 20-
Documents 04408, 20-04999, 20-06811, 20-08051, 20-08357, 20-
10632, 20-11119, 20-13380, 20-14892, 20-16262, 21-
00598, 21-02100, 21-02312, 21-03196, 21-03668, 21-
04949, 21-06745, 21-09226, 21-09589, 21-09942, 21-
13320, 21-13917, 21-13919, 21-14403, 21-15252, 22-
00329, 22-00330, 22-00558, 22-01272, 22-01759, 22-02816
71114.05 Corrective Action 22-02729, 22-03040, 22-3053 22-03054, 22-03055, 22-
Documents 03058
Resulting from
Inspection
71114.05 Miscellaneous 2101 Full-Scale Dress Rehearsal - ERO White Team 03/08/2021
(February 2021)
71114.05 Miscellaneous 2102 Full-Scale Exercise - ERO White Team (March 2021) 04/23/2021
71114.05 Miscellaneous 2112 - 1st Half 2021, Health Physics Drill Report 06/23/2021
71114.05 Miscellaneous 2010 ERO Training Hybrid Drill Report - ERO Gold Team 07/24/2020
(June 30, 2020)
71114.05 Miscellaneous Medical Emergency Event Report (Actual Event) 11/24/2020
71114.05 Miscellaneous 2021 Onsite Contaminated Injury Medical Emergency/Health 01/05/2022
Inspection Type Designation Description or Title Revision or
Procedure Date
Physics Drill Report
71114.05 Miscellaneous 2002 Full-Scale Exercise - ERO Blue Team (March 2020) 04/01/2020
71114.05 Miscellaneous 2005 - Health Physics Drill Report 06/18/2020
71114.05 Miscellaneous 2007 & 2008 ERO Training Hybrid Drills Report - ERO White 09/17/2020
Team (August 11, 2020) & ERO Red Team (August 18,
20)
71114.05 Miscellaneous 2009 - Health Physics Drill Report 01/08/2021
71114.05 Miscellaneous 2020 Onsite Medical Emergency Drill Report - Rev 1 11/23/2020
71114.05 Miscellaneous 2012 ERO Training Hybrid Drill Report - ERO Green Team 01/21/2021
(December 15, 2020)
71114.05 Miscellaneous 2013 ERO Training Hybrid Drill Report - ERO Blue Team 09/17/2020
(September 1, 2020)
71114.05 Miscellaneous 2106 ERO Drill - ERO Green Team (June 8th, 2021) 07/09/2021
71114.05 Miscellaneous 2111 ERO Drill - ERO Red Team (November 23rd, 2021) 02/09/2022
Revision 01
71114.05 Miscellaneous Nuclear Assurance Department (NAD) Audit Report, Audit 11/20/2020
20-007 Emergency Preparedness
71114.05 Miscellaneous Nuclear Assurance Department (NAD) Audit Report, Audit 11/19/2021
21-007 Emergency Preparedness
71114.05 Miscellaneous 20-03146-001 Actual Event Investigation - Seismic Occurrence 3/5/2020 04/07/2020
71114.05 Miscellaneous 20-13380-001 Actual Event Investigation - Smoke from Circ Water Vent 11/18/2020
Valve
71114.05 Miscellaneous 20-14456-001 Actual Event Investigation - Polar Crane Arc Flash 11/19/2020
71114.05 Miscellaneous 21-03325 Actual Event Investigation - Substation F Failure & Smoke 05/28/2021
71114.05 Miscellaneous 21-05934 Actual Event Investigation - EPlan Evaluation of Loss of 06/11/2021
Inverter Output Coincident with Fire Alarm and Smoke
71114.05 Miscellaneous 21-06338-001 Actual Event Investigation - Unit 2 Trip 07/28/2021
71114.05 Miscellaneous 21-13917-001 Actual Event Investigation - Smoke from the Technical 01/26/2022
Support Center
71114.05 Miscellaneous 21-14185-002 Actual Event Investigation - Multiple Indications of Fire in the 11/19/2020
Cable Spreading Room
71114.05 Miscellaneous 21-14696-001 Actual Event Investigation - Fire Outside the PA 01/26/2022
71114.05 Miscellaneous Evaluation 21- Maintenance On-Shift ERO Unqualified Worker Trend, Event 0
00612-004 Date: 1/27/2021, Level 2 CAQ Causal Analysis Report
Inspection Type Designation Description or Title Revision or
Procedure Date
71114.05 Miscellaneous ID: 240-02890 2020 Annual Review of PVGS Emergency Plan Letters of 11/12/2020
Agreement and Offsite Program Commitments
71114.05 Miscellaneous KLD TR-1210 Palo Verde Nuclear Generating Station 2020 Population 12/3/2020
Update Analysis
71114.05 Procedures Joint Public Information Procedure: Media and Public 34, 35
Information Dissemination
71114.05 Procedures 01DP-0AP12 Condition Reporting Process 38
71114.05 Procedures 01DP-0AP12-01 Condition Reporting Process Administrative Guideline 13
71114.05 Procedures 16DP-0EP23 Emergency Preparedness Drill and Exercise Program 15
Management
71114.05 Procedures 16DP-0EP31 Emergency Preparedness Equipment Out of Service 13
71114.05 Procedures 60DP-0QQ19 Internal Audits 33
71114.05 Procedures EP-905 Protective Actions 14
71114.05 Work Orders Work Order 5329421, 5365608, 5420882, 5428712
71114.06 Corrective Action 22-01144, 22-01163, 22-01169, 22-01155, 22-01157, 22-
Documents 01158, 22-00175, 22-01352
71114.06 Miscellaneous 2022 Emergency Preparedness Scenario 2201
71114.06 Miscellaneous The Emergency Response Organization Newsletter - 02/04/2022
February 4, 2022, ERO Response Time
71114.06 Miscellaneous 2022 Emergency Preparedness Scenario 2202
21 ERO Dress Rehearsal Drill - ERO Green Team 03/18/2022
(February 1st, 2022) Drill Report
71114.06 Miscellaneous EP-0801H [Emergency Action Level] Classification Matrix Hot
Conditions ([Reactor Coolant System] > 210°F)
71114.06 Miscellaneous EP-0803H [Protective Action Recommendation] Flowchart
71114.06 Miscellaneous EP-0804G Release Evaluation Flowchart
71114.06 Miscellaneous EP-0930B [Emergency Action Level] Classification Matrix All Conditions
71114.06 Procedures 40EP-9EO04 Steam Generator Tube Rupture 34
71114.06 Procedures EP-0900-900 ERO Positions, Emergency Coordinator (TSC) 001
71114.06 Procedures EP-0904 ERO/ERF Activation and Operation 14
71151 Miscellaneous Unit 1 PI Summary Report 01/11/2022
71151 Miscellaneous Unit 2 PI Summary Report 01/11/2022
71151 Miscellaneous Unit 3 PI Summary Report 01/11/2022
Inspection Type Designation Description or Title Revision or
Procedure Date
71151 Miscellaneous Palo Verde Nuclear Generating Station Siren Operating 12/30/2021
Manual
71151 Miscellaneous Palo Verde Nuclear Generating Station, Alert and 5
Notification System (ANS) FEMA 350 Report, July 2019
71151 Miscellaneous NEI 99-02 Regulatory Assessment Performance Indicator Guideline 7
71151 Procedures 16DP-0EP19 Performance Indicator Emergency Preparedness 23
Cornerstone
71151 Procedures 16DP-0EP27 Emergency Preparedness Equipment Testing 20
71151 Procedures 16DP-0EP37 Prompt Notification System 9
71153 Corrective Action 21-02209, 21-02212-003, 21-15270
Documents
71153 Miscellaneous Evaluation 21- Unit 2 Reactor Trip due to Loss of Non-Class 13.8 kV Bus 2
209-020 without Fast Bus Transfer
71153 Miscellaneous LER Unit 2 Reactor Trip During Plant Protection System 07/16/2021
05000529/2021- Surveillance Testing
2-00
71153 Miscellaneous UFSAR, section Loss of Off-Site Power Following Turbine Trip 20C
15.0.2.4
71153 Procedures 32MT-9ZZ33 Maintenance of AM-13.8-1000-4H GE Magne-Blast Circuit 42
Breakers
71153 Procedures 40DP-9OP34 Switchyard Administrative Control 22
71153 Work Orders 5253670
21