IR 05000528/1986035
| ML20207M921 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/30/1986 |
| From: | Schaefer D, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19292G594 | List: |
| References | |
| 50-528-86-35, 50-529-86-35, NUDOCS 8701130337 | |
| Download: ML20207M921 (1) | |
Text
-
.
.,
ETERIAL TRAR9MITTED riEPP/4T1100!!TAITI I
'
'
i-U99 INf0 Gall 0B The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 l
U. S. NUCLEAR REGULATORY CCMISSION
REGION V
Report'Nos. 50-528/86-35 and 50-529/86-35'(IE-V-781)
Docket Nos. 50-528 and 50-529 License Nos. NPF-41 and NPF-51 Licensee: Arizona Nuclear Power Project P. O. Box 52034 Phoenix, Arizona 85072-2034 Facility Name:
Palo Verde Nuclear Generating Station, Units 1 and 2 Inspected at: Wintersburg, Arizona Inspection conducted:
November 10 through 13, 1986 Date of Last Physical Security Inspection:. July 28 - August 1 and 13, 1986 Type of Inspection:
Special, hysical Security Inspector:
d., U/.
/%!30!T(,
.-
D. Schaefer, 'Physica Security Inspector Date Signed
/)n O r)s//ua U (2/30/st
-
Approved By:
M. D. Schuster, Chief, Safeguards Section Date Signed
.
Inspection Summary:
!
Area Inspected:
Allegation RV-85-A-0068 titled:
Alleged Management Cover-Up of Investigation.
During this inspection, Inspection Procedures 30703 and 90713 were covered.
,
Results:
The licensee was found to be in compliance with NRC requirements
'
within the areas examined during the inspection.
!
WTERIAL TP/N!MITTCO PEPDilmi CONTAllt3 l
U'A INf0RtlAlt03 l
8701130337 870108 ADOCK0500g8
.
DR l
L I
L _