IR 05000528/1986035

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Repts 50-528/86-35 & 50-529/86-35 on 861110-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Allegation RV-85-A-0068 Re Coverup of Investigation
ML20207M921
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/30/1986
From: Schaefer D, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19292G594 List:
References
50-528-86-35, 50-529-86-35, NUDOCS 8701130337
Download: ML20207M921 (1)


Text

-

.

.,

ETERIAL TRAR9MITTED riEPP/4T1100!!TAITI I

'

'

i-U99 INf0 Gall 0B The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 l

U. S. NUCLEAR REGULATORY CCMISSION

REGION V

Report'Nos. 50-528/86-35 and 50-529/86-35'(IE-V-781)

Docket Nos. 50-528 and 50-529 License Nos. NPF-41 and NPF-51 Licensee: Arizona Nuclear Power Project P. O. Box 52034 Phoenix, Arizona 85072-2034 Facility Name:

Palo Verde Nuclear Generating Station, Units 1 and 2 Inspected at: Wintersburg, Arizona Inspection conducted:

November 10 through 13, 1986 Date of Last Physical Security Inspection:. July 28 - August 1 and 13, 1986 Type of Inspection:

Special, hysical Security Inspector:

d., U/.

/%!30!T(,

.-

D. Schaefer, 'Physica Security Inspector Date Signed

/)n O r)s//ua U (2/30/st

-

Approved By:

M. D. Schuster, Chief, Safeguards Section Date Signed

.

Inspection Summary:

!

Area Inspected:

Allegation RV-85-A-0068 titled:

Alleged Management Cover-Up of Investigation.

During this inspection, Inspection Procedures 30703 and 90713 were covered.

,

Results:

The licensee was found to be in compliance with NRC requirements

'

within the areas examined during the inspection.

!

WTERIAL TP/N!MITTCO PEPDilmi CONTAllt3 l

U'A INf0RtlAlt03 l

8701130337 870108 ADOCK0500g8

.

DR l

L I

L _