ML20137E521
| ML20137E521 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/08/1985 |
| From: | Kirsch D, Kirsh D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML20137E526 | List: |
| References | |
| NUDOCS 8508230272 | |
| Download: ML20137E521 (2) | |
See also: IR 05000528/1985021
Text
--
._
f
- i9
h
UNITED STATES
, ,-
8
'
NUCLEAR REGULATCRY COMMISSION
o
{-
aE
REGION V
'
0,
.7
1450 MARIA LANE.sulTE 210
f
,o '
WALNUT CREEK, CALIFORNIA 94596
AUG 0 81985
Docket Nos. 50-528
50-529
Arizona Nuclear Power Project
P. O. Box 52034
Phoenix, Arizona 85072-2034
Attention:
Mr. E. E. Van Brunt Jr.,
Executive Vice President
. Gentlemen:
Subject: NRC Inspection of Palo Verde Units 1 and 2.
This refers to the inspection conducted by Messrs. R. Zimmerman, G. Fiorelli,
and C. Bosted of this office on June 3 through July'31, 1985 of activities
authorized by NRC License No. NPF-41 and NRC Construction Permit Number
CPPR 142 and.to the discussion of our findings held with yourself and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response to this Notice is to be submitted in accordance with the
provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
.
gS*?oan BIT $R*
O
/O
1
.
__
.
._.
_
_
'
.
.
Arizona Public Service Co.
-2-
The response directed by this letter and the accompanying Notice are not
subject to the clearance procedure of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
~ortatna!znytijJ
D. F. Kirah
D. F. Kirsch, Acting Director,
Division of Reactor Safety and Projects
Enclosure:
Inspection Report
No. 50-528/85-21
50-529/85-22
cc w/ enclosure:
J.
R. Bynum, PVNGS Plant Manager
S.
R. Frost, Supervisor, Nuclear Operations Licensing
T.
D. Shriver, Manager, Quality Systems & Engineering
W.
E. Ide, Manager, Corporate QA/QC
C.
N. Russo, Manager, QA Audits / Monitoring
Ms. J. Morrison
Ms. L. Bernabei, GAP
Arthur C. Gehr, Esq.
D. Railsback, Arizona Corporation Commission
bec: RSB/ Document Control Desk (RIDS)
Mr. J. Martin
Resident Inspector
Project Inspector
G. Cook, RV
T
/
S
]
y#h
y
(Ns
/J
/
RZimmerman:dh
GFiorelli
CBosted
LMiller g/i/J CDK1
h
'
'
8///85
8/
/85
8/
/85
8/]/85
8/
/85
7 7 [j