| | Issue date | Site | Title | Topic |
|---|
| ML26086A426 | 27 March 2026 | Palo Verde | Present Levels of Financial Protection | |
| ML26065A290 | 18 March 2026 | Palo Verde | Relief Request 74 - Proposed Alternative for Steam Generator and Pressurizer Pressure Retaining Welds (EPID L-2025-LLR-0084) - Letter | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis Flow Accelerated Corrosion Microbiologically influenced corrosion Stress corrosion cracking Through-Wall Leakage |
| ML26072A324 | 13 March 2026 | Palo Verde | Notice of Intent to Pursue Subsequent License Renewal | License Renewal Subsequent License Renewal Subsequent License Renewal Application |
| ML26071A243 | 12 March 2026 | Palo Verde | Licensed Operator Positive Fitness-For-Duty | Affidavit |
| ML26064A216 | 4 March 2026 | Palo Verde | License Amendment Request to Modify Required Actions for Reactor Coolant System (RCS) Leak Detection Instrumentation | Grab sample Safe Shutdown Earthquake Weld Overlay Enforcement Discretion Probabilistic Risk Assessment Aging Management Surveillance Frequency Control Program Large early release frequency Stress corrosion cracking Earthquake Pressure Boundary Leakage Pressure boundary leak Unidentified leakage Pre-submittal Leak-Before-Break Leak Before Break |
| 05000530/LER-2025-001, Unintentional Uncontrolled Vital Area Keys | 13 February 2026 | Palo Verde | Unintentional Uncontrolled Vital Area Keys | |
| ML26041A357 | 10 February 2026 | Palo Verde 07201031 | Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX193 and AMZDFX195 Vertical Concrete Cask Identification Numbers AMZDNE193 and AMZDNE197 | |
| ML26040A293 | 9 February 2026 | Palo Verde | Inservice Inspection Request for Information | Boric Acid Nondestructive Examination Scaffolding |
| ML26036A204 | 5 February 2026 | Palo Verde | Fourth 10-Year Interval, Third Period Owners Activity Report Number 3R25 | |
| IR 05000528/2025004 | 4 February 2026 | Palo Verde | Integrated Inspection Report 05000528/2025004 and 05000529/2025004 and 05000530/2025004 | Boric Acid Shutdown Margin Mission time Nondestructive Examination Functionality Assessment Foreign Material Exclusion Operability Determination Liquid penetrant Fire Protection Program Dissimilar Metal Weld Government shutdown |