IR 05000528/1985035
| ML20133N846 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/23/1985 |
| From: | Schuster M, Wieder A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19344C102 | List: |
| References | |
| 50-528-85-35, NUDOCS 8510300151 | |
| Download: ML20133N846 (1) | |
Text
.
.
The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790
'
U. S. NUCLEAR REGULATORY COMMISSION
REGION V
,
.
Report No.
50-528/85-35 (IE-V-717)
'
Docket No.
50-528 License No.
NPF-41 Licensee:
Arizona Nuclear Power Project P. O. Box 52304 Phoenix, Arizona 85072-2034
,
Facility Name:
Palo Verde Nuclear Generating Station, Unit 1 Inspection at:
Wintersburg, Arizona Inspection conducted:
October 7-10, 1985 Date of Last Material Control and Accounting Inspection: July 11-14, 1983 and August 5, 11 and 23, 1983 Type of Inspe' ton:
Reactive, Announced Inspector:
M
/d 2 [
A. V. Wieder, Safeguards Auditor Date Signed
-
,,, -
Approved By:
0 77
> Lb f,.ek
/Eh3/,tf M. D. Schuster, Chief, Safeguards Section Date Signed Inspection Summary:
_
Areas Inspected:
Follow-up on Inspector Identified Problem and Unresolved
_
Items, and Follow-up on Non-routine Events using Inspection Procedures 92201 and 90826 respectively.
.
!
The inspection began during regular hours and involved 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> onsite by one
,
NRC inspector.
Results: There were no violations of NRC regulations f ound during this inspection.
!
Ogjo300151 051024
's o
ADOCK 05000528
PDR r