Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:UTILITY
MONTHYEARIR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl IR 05000528/19860351986-12-30030 December 1986 Partially Withheld Insp Repts 50-528/86-35 & 50-529/86-35 on 861110-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Allegation RV-85-A-0068 Re Coverup of Investigation IR 05000528/19860291986-11-25025 November 1986 Insp Repts 50-528/86-29 & 50-529/86-28 on 861027-31.No Significant Deficiencies or Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise & Associated Critiques IR 05000528/19860271986-09-26026 September 1986 Insp Repts 50-528/86-27,50-529/86-26 & 50-530/86-20 on 860804-0907.No Violations Noted.Major Areas Inspected: Followup of Previously Identified Items,Review of Plant Activities,Plant Tours & Engineered Safety Sys Walkdowns IR 05000528/19860191986-07-0202 July 1986 Insp Repts 50-528/86-19,50-529/86-19 & 50-530/86-13 on 860527-0613.No Violation or Deviation Noted.Major Areas Inspected:Open Items in Units 1 & 2,LERs in Unit 1,IE Bulletins & Generic Ltrs IR 05000528/19860141986-04-30030 April 1986 Partially Deleted Enforcement Conference Repts 50-528/86-14 & 50-529/86-14 on 860410.Major Areas Discussed:Violations Re Security Noted in Insp Repts 50-528/86-07 & 50-529/86-06,NRC Concerns & Licensee Corrective Actions ML20205M5101986-04-0202 April 1986 Partially Deleted Insp Repts 50-528/86-07 & 50-529/86-06 on 860211-0313.Noncompliances Noted:Vital Area Not Limited Only to Authorized Individuals,Failure to Respond to Vital Area Alarms & Vital Area Barriers Not Adequately Maintained IR 05000528/19860011986-01-21021 January 1986 Insp Repts 50-528/86-01,50-529/86-01 & 50-530/86-01 on 860106-10.No Violation or Deviation Identified.Major Areas Inspected:Tmi Action Plan Items & Operational Safety in Unit 2 & 100% Load Rejection Test in Unit 1 IR 05000528/19850341985-11-26026 November 1985 Insp Repts 50-528/85-34 & 50-529/85-34 on 850927-28 & 0930-1004.No Violation or Deficiencies Noted.Major Areas Inspected:Emergency Preparedness Program,Including Emergency Plan Training,Emergency Facilities & Equipment IR 05000528/19850411985-11-13013 November 1985 Insp Repts 50-528/85-41,50-529/85-35,50-530/85-25 & 70-2984/85-03 on 851003-04,15-29,07-11 & 30-31.No Noncompliance or Deviation Noted.Major Areas Inspected: Preoperational Test Program for Radiation Protection IR 05000528/19850371985-11-13013 November 1985 Insp Repts 50-528/85-37,50-529/85-37 & 50-530/85-27 on 850923-1104.No Violation or Deviation Noted.Major Areas Inspected:Action on NRC Enforcement Item & Quality Records Re safety-related Piping & Components IR 05000528/19850401985-11-0707 November 1985 Insp Repts 50-528/85-40 & 50-529/85-39 on 851015-1101.No Violations or Deviations Noted.Major Areas Inspected: Operational Staffing,Design Changes,Tmi Action Plan Items, IE circulars,10CFR55.55(e) Items & Surveillance Testing IR 05000528/19850351985-10-23023 October 1985 Matl Control & Accounting Insp Rept 50-528/85-35 on 851007- 10.No Violations Noted.Major Areas Inspected:Followup on Inspector Identified Problem & Unresolved Items.Details Withheld (Ref 10CFR2.790) IR 05000529/19850361985-10-18018 October 1985 Insp Rept 50-529/85-36 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Implementation of TMI Action Plan Items & Followup of 50.55(e) Repts IR 05000528/19850331985-10-16016 October 1985 Insp Repts 50-528/85-33 & 50-529/85-33 on 850916-27.No Violation or Deviation Noted.Major Areas Inspected:Tmi Action Plan Items,Ie Bulletins & Circulars,Action on Inspector Identified Items & Temporary Mods IR 05000529/19850291985-10-11011 October 1985 Insp Repts 50-529/85-29 & 50-530/85-23 on 850923-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Program & Implementation W/Emphasis on Changes Made to Program During 1984 & 1985 IR 05000529/19850321985-10-11011 October 1985 Insp Repts 50-529/85-32 & 50-530/85-24 on 850916-19 & 0930-1004.No Violations or Deviations Noted.Major Areas Inspected:Nde of Piping,Structural Steel & Supports & Review of RCPB Piping Records IR 05000528/19850281985-10-0808 October 1985 Insp Repts 50-528/85-28,50-529/85-28 & 50-530/85-22 on 850807-0922.No Violation or Deviation Noted.Major Areas Inspected:Instrument components,safety-related Structures & Closure of Allegation RV-85-A-033 IR 05000528/19850261985-09-25025 September 1985 Insp Repts 50-528/85-26 & 50-529/85-27 on 850801-0908. Violations Noted:Failure to Properly Verify Closure of Unit 1 Doors & Tech Spec Overtime Limits Exceeded W/O Approval by Plant Manager or Designee IR 05000530/19850201985-08-28028 August 1985 Insp Rept 50-530/85-20 on 850729-0802 & 12-16.No Violation or Deviation Noted.Major Areas Inspected:Activities Re Instrument Components & Sys IR 05000528/19850271985-08-28028 August 1985 Enforcement Conference Rept 50-528/85-27 on 850808.Major Areas Discussed:Problems Associated W/Implementation of post-accident Sampling Sys Required by NUREG-0737,Item II.B.3 IR 05000528/19850291985-08-22022 August 1985 Insp Repts 50-528/85-29,50-529/85-26 & 50-530/85-21 on 850805-16.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration,Qa Audits,Document Control Maint,Temporary Mods,Tests & Experiments IR 05000528/19850231985-08-13013 August 1985 Insp Repts 50-528/85-23,50-529/85-24 & 50-530/85-18 on 850630-0806.No Violation or Deviation Noted.Major Areas Inspected:Observation of Work Re Electrical Cable Installation & Terminations in Unit 3 IR 05000528/19850201985-08-0909 August 1985 Insp Rept 50-528/85-20 on 850603-07.No Violation Noted.Major Areas Inspected:Program Plan,Procedures & Records Re Inservice Testing Program for Pumps & Valves & Insp Procedure 61700 IR 05000528/19850211985-08-0808 August 1985 Insp Repts 50-528/85-21 & 50-529/85-22 on 850603-0731. Violation Noted:Failure to Submit LER within 30 Days of Event IR 05000522/20060051985-08-0606 August 1985 Enhanced Team Insp Rept 50-528/85-12 on 850522-0605 & 0716. No Violations Noted.Major Areas Inspected:Operating Crews & Operational Support Activities During Initial Startup & Low Power Testing IR 05000528/19850251985-08-0101 August 1985 Insp Rept 50-528/85-25 on 850624-0724.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Ler/Deficiency Evaluation Rept Interface,Power Ascension Test Data at 20% Power Plateau & Control Room Activities IR 05000428/20060291985-07-19019 July 1985 Insp Repts 50-528/85-17,50-529/85-19 & 50-530/85-13 on 850428-0629.No Violation or Deviation Noted.Major Areas inspected:as-built Configuration & Documentation of Unit 2 Main Steam Supply Sys IR 05000529/19850251985-07-0505 July 1985 Insp Repts 50-529/85-25 & 50-530/85-19 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Action on IE Circulars,Followup of Previously Identified Items, Const Deficiencies & Observation of Hot Functional Testing ML20132D5421985-07-0303 July 1985 Emergency Preparedness Insp Rept 50-528/85-10 on 850429-0503 & 13-17.Violation Noted:Failure to Provide Initial Training & Annual Retraining to Employees IR 05000429/20060021985-07-0202 July 1985 Insp Repts 50-528/85-13 & 50-529/85-17 on 850429-0602.No Violation Noted.Major Areas Inspected:Plant Activities, Surveillance Testing,Plant Maint,Preoperational Testing Activities & Allegations & Commitment Followup IR 05000528/19850191985-07-0101 July 1985 Insp Repts 50-528/85-19,50-529/85-21 & 50-530/85-15 on 850513-17.No Violation or Deviation Noted.Major Areas Inspected:Activities Associated W/Implementation of Selected TMI Action Items & Routine Followup of Allegations IR 05000528/19850181985-06-28028 June 1985 Insp Repts 50-528/85-18,50-529/85-20 & 50-530/85-14 on 850513-24.No Violation or Deviation Noted.Major Areas Inspected:License Conditions & Commitments,Lers,Const Deficiencies,Ie Bulletins & TMI Action Plan Items IR 05000530/19850161985-06-10010 June 1985 Insp Rept 50-530/85-16 on 850513-17 & 28-30.No Violations or Deviations Noted.Major Areas Inspected:Steel Structures & Supports,Reactor Coolant Loop Piping & Reactor Vessel & Internals Documentation IR 05000529/19850141985-05-0808 May 1985 Insp Repts 50-529/85-14 & 50-530/85-09 on 850325-29. Violation Noted:Welding of New Fuel Storage Racks.Deviation Noted:Procurement of New Fuel Storage Racks IR 05000528/19840141984-05-11011 May 1984 IE Insp Repts 50-528/84-14 & 50-529/84-11 on 840402-30.No Noncompliance Noted.Major Areas Inspected:Startup Testing & Noncompliance Followup 1989-09-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures ML20196D6391998-11-20020 November 1998 Notice of Violation from Insp on 981019-24.Violation Noted: Licensee Submitted Physical Security Plan Rev 40 Which Contained 10 Changes to Physical Security Plan That Decreased Safeguard Effectiveness of Plan ML20236N0381998-07-10010 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:On or About 980310, Unit 3 Operators Failed to Demonstrate Operability of Operable Offsite Power Circuits IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) ML20138C1071997-04-22022 April 1997 Notice of Violation from Insp on 970317-21.Violation Noted:Safeguards Documents Discovered Outside Protected Area Unsecured in Terminated Employee Desk IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IA-98-273, Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant1994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20236U9511994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms ML20057C5941993-09-0909 September 1993 Notice of Violation from Insp on 930621-0709.Violation Noted:Despite Licensee Chemistry Manager Receipt of from Combustion Engineering Identifying Potential for Dilution of Sample,Licensee Failed to Establish Measures IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power1993-08-30030 August 1993 PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee1993-08-11011 August 1993 PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8501993-07-0101 July 1993 Notice of Violation from Insp on 930427-0531.Violation Noted:Licensee Failed to Meet Surveillance Requirements for Testing Snubbers in Plants ML20056C8451993-07-0101 July 1993 Notice of Violation from Insp on 930426-0514.Violation Noted:Sgtr Event Involving RCS Leakage Greater than 44 Gpm & Previous Condition Involving RCS Leakage Greater than Charging Pump Capacity,Not Classified as SAE ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined1993-03-25025 March 1993 PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage ML20127B0961992-12-22022 December 1992 Notice of Violation from Insp on 921026-30 & 1116-20. Violation Noted:On 921110,procedures Were Not Adhered to in That Survey Not Performed or Documented to Illustrate Impact of Cumulative Dose Rates IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items ML20126E0241992-12-0808 December 1992 Notice of Violation from Insp on 921005-09.Violation Noted: Licensee Lost All Meteorological Instrumentation for Approx 7 H But Failed to Declare Unusual Event within 30 Minutes of Loss of Instrumentation on 920822 ML20126B9031992-12-0404 December 1992 Notice of Violation from Insp on Stated Date.Violation Noted:Boric Acid Make Up Pump Discharge Check Valves CHN-V154 & CHN-155 Were Not in Licensee IST Program & Were Not Being Tested Individually IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI 1999-06-30
[Table view] |
Text
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report No /85-28, 50-529/85-28, and 50-530/85-22 Docket No , 50-529, and 50-530 License N NPF-41 Construction Permit. Nos. CPPR-142 and 143 Licensee: Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034 Facility Name: Palo Verde Nuclear Generating Station Units 1, 2, and Inspection Conducted: August 7 - September 22, 198 Inspectors:
_G . 11
~
I.rn e
_ w h
_enior Resident inspector
/O-B-O f Date Signed
_ aa1 &< nt iw aspector
& so-e-er Date Signed
'
Approved By:
_ .w__
F. Mil e , Chi _ ,
/ h /O-B -8,5~
Date Signed Reactor P c jects . -ion o. 2 Summary:
Inspection from August 7 - September 22, 1985 (Report Nos. 50-528/85-28, 50-529/85-28 and 50-530/85-22).
Areas Inspected: A routine, onsite inspection by the Construction Resident Inspectors of activities related to licensee action on NRC identified items; review of licensee action on a reported 50.55(c) item, inspector review of quality records related to electrical cable and terminations, instrument components, containment steel structures and supports, and safety related structures; observation of work related to safety related piping, and closure of Allegation No. RV-85-A-03 The inspection involved 354 inspector hours onsite by two NRC Resident Inspector The following I.E. Manual Chapters were covered during this inspection:
Module Nos. 30703, 48055B, 48065B, 49063B, 51065, 52051, 52055, 92700, 92701, 92702, and 9270 l Results: In the areas inspected, no deviations or violations of NRC requirements were identified.
BBA 2egggt gggggjge G
. . . DETAILS Persons Contacted Arizona Nuclear Power Project (ANPP)
E. E. Van Brunt, Jr. , Executive Vice President
- *D. B. Karner, Assistant Vice President, Nuclear Production
- W. E. Ide, Corporate Quality Assurance Manager D. B. Fasnacht, Nuclear Construction Manager
- W. F. Quinn, Licensing Manager A. C. Rogers, Nuclear Engineering Manager
L. A. Souza, Assistant Corporate Quality Assurance Manger
- C. N. Russo, Quality Assurance Audits / Monitoring Manager D. E. Fowler, Quality Control Manager T. A. Shriver, Quality Systems Engineering Manager R. J. Burgess, Field Engineering Supervisor
- S. G. Penick, Quality Assurance Monitoring Supervisor J. C. Sherrin, Quality Document Review Group Supervisor A. T. Ramey, Quality System Supervisor K. R. Daley, Quality Assurance Engineer M. L. Provost, Quality Assurance Engineer W. W. Montefour, Quality Assurance Engineer D. M. LeBoeuf, Quality Assurance Engineer H. L. Green, Quality Assurance Engineer W. J. Gratza, Quality Assurance Engineer Bechtel Power Corporation (Bechtel)
G. A. Hierzer, Field Construction Manager S. M. Nickell, Project Superintendent W. G. Bingham, Project Engineering Manager
- D. R. Anderson, Chief Resident Engineer
- T. L. Horst, Project Field Engineer D. R. Hawkinson, Project Quality Assurance Manager H. A. Foster, Project Quality Control Engineer H. A. Mear, Assistant Project Quality Control Engineer J. Waddington, Assistant Project Quality Control Engineer R. Ruff, Lead Electrical / Instrumentation Quality Cont ol En G. Griffin, Lead Civil Quality Control Engineer
- Denotes personnel attending the NRC Exit Interview conducted on September 20, 1985.
+
The inspectors also talked with other licensee and contractor personnel during the course of the inspection.
i Plant Status Unit Two: l The licensee is currently receiving fuel for Unit No. 2 with the last full shipment expected by September 23, 1985. The licensee has !
successfully completed Hot Functional Testing and Integrated Safeguards l
. - - . _ __ _ , . . _. ._ . _ _ _ _ _ . . , . . , _ ~ . . . . _ _ _ . - _
- . . . .- - -
,- .. . . _-- -- _-. . . . -. . . -
E
,
. 2 Testing. The next critical item for Unit No. 2 is fuel load which is projected for November 1, 1985.
.
Unit Three: !
i The project expects to complete preoperational testing of all Class IE j and non-class IE electrical power supply systems by October 31, 198 Construction completion of Unit 3 is estimated at 95% by the license ! Licensee Action on NRC Identified Unresolved Items - Unit 3 (Closed) Unresolved Item No. 50-530/85-18-01, " Seismic Qualification of Clamps Used in Control Room Panels" i
During a tour of Unit No. 3, the inspector had questioned whether a number of small clamps used to support safety related electrical conduits (approximately one inch conduit) were seismically qualified. The clamps were apparently used to provide support for the conduit and to maintain the separation criteria requirement During this reporting period, the inspector reviewed the vendor seismic qualification data for the panels in question, which indicated that the panels as a complete unit had been qualified for their intended functio However, the documentation did not indicate that the clamps had been included in this qualificatio Discussion with the licensee indicated the clamps were not installed by the field since this type of clamp was not an item procured by Bechtel Power Corporation for Palo Verde, but was believed to be vendor installed equipment. As a result of discussions with the inspector, the licensee generated special Construction-Inspection Plans to determine the amount of torque currently on the clamps and to perform a comparison of the as-found torque to the minimum
, torque required by calculatio c The licensee determined that only 16 inch pounds of torque would be required and that all bolts examined exceeded this value by at least 4 inch pounds. The licensee concitted to establishing a minimum torque value for the bolts, to insure that anytime a clamp was moved or removed the clamps would be sufficiently torqued.
l'
Based on the licensee actions, the inapector considers this item closed.
i Licensee Action on NRC -Identified Enforcement Items - Units 1 and 2
- (Closed) Notice of Violation Nos. 50-528/85-16-01 and 50-529/85-10-02
!
" Failure to Perform Inspection of Raceway Installations".
The inspector previously identified two instances of a failure by the licensee to perform QC inspections of raceways. The first instance involved the inspections of manholes in Unit The licensee determined that at the time of area turnover from construction to operations it was recognized that these inspections had not been performed. However, the reviewing engineer mistakenly classified the inspections as a Category III items in accordance with the licensce's procedure No. 73AC-0ZZO5
"PVNGS Operation Open Item Completion" which meant that "No further i
,
.
em-------,m,-e - -, -- , . , , , - - - , . . - - ,,-.-,,# -r_.,,rr.mw,--m,--+, --m,v,,-w,,--
.- . . = _- .- . _ _ .
action was required". To determine the extent of the misclassification problem, the licensee conducted a 100% review of Unit 1 Area Subsystem Acceptance Packages. This review identified 18 additional items which involved missing inspections. All items, including the specific items identified by the inspector, were inspected and found to be acceptabl :
All identified deficiencies were found to be contained within packages
'
evaluated by the same enginee To prevent recurrence, the licensee revised its procedure for review of acceptance packages to more clearly define responsibilities of the reviewer and to specifically address the processing of open items such as those described in the Notice of Violatio The second instance involved the inspection of pull boxes. The inspector i initially identified two raceways in Unit 2 in which pull boxes were installed, but were not inspected when the raceway was accepted. As a result of this finding, the licensee performed a special inspection of l
all areas containing safety related conduit installation to determine where pull boxes were installed. During this inspection the licensee identified 160 raceways containing boxes. Of these 160 raceways, three
- were found to have pull boxes with support deficiencies. The following
- l nonconforming reports were issued to document these deficiencies: NCRs
! EC-5982, EC-5983 and EA-6125. The root cause of these deficiencies in both hardware and inspection records was determined to be a failure of the Field Engineers to to submit inspection records to quality control for verification of installation, following raceway modifications, and a
,
misunderstanding by the Quality Control Engineers of their responsibilities with regard to the manner in which these inspections
, were to be documented. To prevent recurrence the licensee revised its procedures for these inspections to assure clear and concise
'
documentation. The licensee also provided additional training to both ,
Field Engineers and Quality Control Engineers on the requirements for the j performance and documenting of raceway inspections.
.
Based on the licensee's corrective action as indicated above and the
'
inspector's examination of the licensee's stated actions, this violation is close . Licensee Action on 10 CFR 50.55(e) Construction Deficiencies ,
The following potential 50.55(e) item was reviewed by the inspector for
, reportability and to determine the thoroughness of the licensee's corrective action (Closed) DER No. 85-12, " Evaluation Related to Cracking in the Auxiliary ,
l Buildirig Walls" - Unit 2 I
On April 1, 1985, the licensee reported to the NRC that a number of
- cracks had been observed in four interior walls, at the 70' and 88'
i elevation of the Unit No. 2 Auxiliary Building. The identified discrepancies were observed to exceed the American Concrete Institute's
.
'
(ACI-318) recommended widths for structural concrete and were subsequently documented on Nonconformance Report No. CA-5071. The j maximum crack widths measured by the licensee was .060 and .040 inches
,
!
l l
l
. . _ , _ . , _ . - - __ - - - __...--. _ _ -_ _____ _ _ _ ._--_ _ _,._ __ _ _.~.. - , _ - --._. -. _ _
'
I
! l 4 i i
(for two cracks respectively). All other cracks were found to range f rom ;
.006 to .030 inche '
To determine the effect of the cracks on the structural integrity of the Auxiliary Building walls, the licensee's investigation included taking ;
eighteen 1 and 2 inch diameter core samples, removing floor coating in order to observe any signs of structural distress, taking compressive 1 4 strength tests of the core samples, inspection of the Auxiliary Building !
walls of Unit Nos. I and 2, examination of the concrete records for the questionable concrete placements, and review of the building settlement data. All tests, inspections and record reviews performed by the
,
licensee were found to conform to the applicable requirements. The licensee concluded that the cracks were not caused by any structural overload condition, but were believed to be caused by the drying, shrinkage or thermal movement of the walls. The licensee's record review of concrete placement for these walls indicated that concentrated amounts
,
'
of starter mix (grout) had been placed in some locations along where the cracks were found. Additional research by the licensee determined that
- the use of too much grout in any one location had been a concern, and in order to control the amount of grout used in the beginning of any concrete placement, Specification 13-CM-365 was revised in May 1981, to limit the depth of grovt to 3 inches maximum at any location. The Auxiliary Building walls had been placed on August 17, 1978. On August 18, 1985, the NCR was closed with the repair of the cracks by the use of approved epox Further discussion with the licensee indicated that the licensee's use of ACI-318 applied only to beams and slabs subject to flexural loads. The particular walls identified in the NCR would not be subject to this type of loadin It was determined that there was no requirement in ACI-318, or in Project Specification 13-CM-365 limiting cracking in non-flexural zones resulting from drying shrinkage. This condition was evaluated by the licensee as not reportable under the requirements of 10 CFR 50.55(e)
or 10 CFR Part 21.
l The inspector's review determined that the licensee took appropriate and adequate corrective action with respect to this ite This item is close . Electrical Cable and Terminations Review of Quality Records - Unit 2 The inspector reviewed cable installation and termination records for instrumentation installed in Unit 2. The follcwing cable schemes for shutdown cooling monitoring instrumentation were reviewed:
,
Cable Numbers Instrument Description 2ESI80ACI XA, XC & XE 2JSIAFT306 Shutdown Cooling Flow Rate -
Train A I 2ESI80AC2 XA, & XE 2JSIATE303X Shutdown Cooling Heat Ex-
~
changer 1 Outlet Temperature 2ESI80AC3 XA, XC & XE 2JSIATE351X Shutdown Cooling Heat Ex-i
.
.
,.m .
, , , ..<, - .-
y ,m., , . - --y--,,r _g.--,, - e re e--re- ww ww-e=="*** ' ' * ' "'r*=-'" ' - * * * -
. _ . . . - - -- . - - . - - - __- - . - - .
i l
'
. 5 r
changer 1 Inlet Temperature 2ESI80AC4 XA, XC & XE 2JSIATE351Y Shutdown Cooling Heat Ex-changer 1 Outlet Temperature 2ESI81BC1 XA, XC & XE 2JSIBFT307 Shutdown Cooling Flow Rate -
Train B 2ESI81BC2 XA, & XE 2JSIBTE303Y Shutdown Cooling Heat Ex-changer 2 Outlet Temperature 2ESI81BC3 XA, XC & XE 2JSIBTE352X Shutdown Cooling Heat Ex-changer 2 Inlet Temperature 2ESI81BC4 XA, XC & XE 2JSIBTE352Y Shutdown Cooling Heat Ex-changer 2 Outlet Temperature The following specifications and Work Plan Procedures / Quality Control Instructions (WPP/QCIs) governing the installation of electrical cables were utilized during this inspection:
} 13-EM-300, Installation Specification for Electrical Cables in
! Cable Tray l 13-EM-301, Installation Specification for Electrical Cables in Conduit and Duct Bank EM-306, Installation Specification for Cable Splicing,
- Terminations, and Support ,
!
I
kPP/QCI 254.0, Cable Installations
WPP/QCI 255.0, Cable Terminations The records were reviewed to' determine whether they reflected that items were installed in accordance with specification requirements using proper
, materials, and required inspections were properly performed, recorded, reviewed and evaluated by qualified personne No deviations or violations of NRC requirements were identifie . Instrument Components - Review of Quality Records - Unit No. 2 i Summary of Areas Examined
,
The inspector examined quality records relating to the receipt, storage and installation of instrument r.omponents and systems in Unit 2 to determine if the records reflected that items were handled and installed in accordance with specification requirements, and required inspections were properly performed, recorded, reviewed and evaluated by qualified personnel. The inspector reviewed #
dacumentation concerning the resolution of nonconforming conditions
- identified by the licensee during the course of component installation. Records pertaining to changes in. design or modifications to equipment already installed in the plant were also reviewed. Recent audits by the licensee in these areas were reviewed, as wel Receiving Inspection and Storage of Instrument _ Components A detailed inspection of the licensee's receiving and storage activities was previously conducted by a region based inspector i
J
- w-,7 ,i,-- e,. ,-, e- yw - '-$3 w * -r-- + + w wi *~e* ea-w = - w ** e S-- c'r - * v e e c o * *? m ev e r--*r- -r*w** --
r-v ve- "*--M*"'e* w+N- - * ^ ** " ' ' * - * ' * * '
.. . - - - - __ .. _ '6 during March 1985, and was documented in NRC Report No /85-13 and 50-530/85-06. During this inspection, the inspector again toured the licensee's storage facilities to determine if the licensee was continuing to maintain components under proper storage conditions, that components were being properly
identified and controlled, and that nonconforming items were
,
identified and segregated to avoid their inadvertent use. The inspector also reviewed four recent quality assurance monitoring
,. reports written by the licensee relating to material control and
'
level of storage. The inspector reviewed the closcout of one
'
.
Corrective Action Report (CAR) related to performance of preventive maintenance to assure the integrity of materials in storage. The inspector also reviewed a Nonconformance Report (NCR) which identified a lack of weather tightness in Warehouse "C" (which is used by the licensee as a Level B storage area). The licensee was proceeding to repair the structure in order to bring it into compliance with procedural requirements at the conclusion of this inspectio No deviations or violations of NRC requireraents were identifie Installation of Instrument Components and Systems The inspector reviewed documentation for installation of twelve resistance temperature detectors, four flow meters, and two dif ferential pressure transmitters to determine if instrument installations were accomplished in accordance with the latest specifications, drawings and procedures and that appropriate i inspections were conducted and documented. The following installed instruments were selected for inspection:
f Instrument Transmitter Description Channel System Number Shutdown Cooling Heat Exchanger 1 A
'
Monitoring 2JSIATE303X Outlet Temperature 2JSIATE351X&Y Heat Exchanger 1 A
, Differential
'
Temperature
,
'
2JSIBTE303Y Heat Exchanger 2 B Outlet Temperature 2]SIBTE352XSY Heat Exchanger 2 B Differential Temperature
! 2JSIAFT306, Hot Leg Injection A Flowrate 2JSIBFT307 Hot Leg Injection B l Flowrate
I l
l l
. . - _ . - . _ . . . . _ _ _ . _ - . - _ _ - . ._ _~ . __ _ ... . . , . _ . . _ _ , . , _ _ . . . . . . . . . . , _
i
Safety Injection 2JSIAFT390 llot Leg Injection A Monitoring Flowrate 2JSIBFT391 Hot Leg Injection B l Flowrate i i
Plant Protection 2JRCBPDT115B Steam Generator B :
System No. I Differential Pressure 2JRCDPDT115D Steam Generator D No. 1 Differential Pressure i
Reactor Coolant
2JRCATE115 A Loop 1B Cold Leg Temperature 2JRCDTE112CD Reactor Coolant D IB Cold Leg Temperature 2JRCBTE125 Reactor Coolant B Loop 2B Cold Leg Temperature 2JRCCTE122CC Reactor Coolant C Loop 2A Cold Leg Temperature The following specification and Work Plan Procedures / Quality Control Instructions (WPP/QCIs) were used as a basis for this inspection activity:
13JM702 Installation Specification for Instrumentation and Controls.
WPP/QCI 258.9 Electrical Instrumentation Installation.
"
WPP/QCI 302.0 Instrumentation Installation.
The inspector also reviewed applicable instrumentation loop diagrams, sensing line isometrics, and vendor documents for the selected instrumentation installations.
The inspector determined that the licensee's construction inspection plans called for the installation of a gasket and application of a specified torque to certain resistance temperature detector connection heads in accordance with the vendor's recommendation. At the time of installation, this task was apparently not being accomplished by construction or startup personnel. In discussions with the licensee, the inspector was informed that this task was '
being accomplished by operations subsequent to system turnover.
Review of the licensee procedures for calibration of these
_ _ _ _ _ _
. _ _ _ . _ - _ _ _ . . . .- __ . . _ .
i
.
instruments indicated that these tasks were indeed being accomplished by the licensee's Instrument and Control (I&C) staff subsequent to completion of startup activities. The licensee indicated that the construction inspection plans would be identified
'
to reflect current practic The inspector also found during this inspection that the licensee had, in one instance, been inconsistent in the manner in which the
,
final as-built. configuratio:. of an instrument tubing run had been documented. The inspector found that the licensee had doctunented the as-built configuration of sensing lines for 2JSIBFf391 differently on two separate field generated drawings, Numbers
.
62,954-J and 81,094- The licensee indicated that the apparent inconsistency between the two drawings was the result of a failure to use the correct revision of an earlier drawing during the preparation of 81,094- As a result of the inspector's concern, the licensee reviewed all other instrument sensing line isometrics and found five additional instances out of approximately 900 possible installations in which more than one drawing had been used ~
to document the as-huilt configuration of a single installatio However, the licensee stated that in each of these five cases no inconsistencies were found with the as-built condition or the
'
drawing In these cases, the engineer has failed to indicate that one revision of one drawing had been superseded by another revisio Based on the licensee's review of these drawings the inspector concluded that the identified drawing error was an isolated
. occurrenc '
"
Based on the inspector's observations, except for the aforementioned six cases, it vas found that all instrument installation had been installed as specified by design documents and in accordance with approved procedure No deviations or violations of NRC requirements were identified.
1 Construction Testing and Calibration I
This activity is no longer being performed by construction. All testing and calibration activities are done by the startup grou e Review of Nonconformance and Deviation Reports The inspector reviewed ten NCRs, four written by construction, four by startup, and two by operations, which were related to instrument components or system installation In each case, the inspector observed the records to be complete, adequately reviewed and appropriately dispositioned. The records were found to be properly identified and easily retrievabl No deviations or violations of NRC requirements were identified.
. - - . - _ . _ _ - - , - _ . _ . . . -
. , . _ . . ~ . _ . . - _ - _ . _ _ , , , _ , _ _ . - . . , . _ , _ . _ . . _ . - - . _ . . . . _
. . - . .- -, . - . _ - - _ - . _ _.- - - . . ~ . _ - _ _ - - _ - - - .
, . 9 4 Design and Field Change Records (FCRs)
The inspector reviewed records for eight design change packages
(DCPs) related to instrumentation installations. The inspector found the records to reflect that design changes were subject to
,
adequate controls. The inspector found the changes to have received the appropriate reviews and that appropriate inspection records were found to exist for the modifications to the installed equipmen No deviations or violations of NRC requirements were identifie ! 8. Containment Structural Steel and Supports - Review of Quality Records -
Unit 3 The inspector reviewed documentation related to the installation of the upper seismic supports for the four safety injection tanks in Unit ,
The following drawings and specifications were reviewed:
N001-11.02-27 Technical Instruction Manual for Safety Injection Tanks - ANPP Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision l
N001-11.02-13 ANPP Palo Verde Nuclear Generating Station Units 1,.2, and 3 Safety Injection Tank Outline Drawin *
13-C-ZCS-378 Containment Internals, Reinfarcing Concrete, Pressurizer and Safety Injec sion Tank and Foundation *
i 13-C-ZCS-573 Containment Internals Structural Steel Sections and Detail The inspector reviewed the completed construction inspection plans (CIP
- Nos. 350-79-3, 350-80-3, 350-81-3, 350-82-3 and 350-190-3) for each of f the four safety injection tanks in Unit 3. The inspector also reviewed I two nonconformance reports written against the installatior of the i supports (NCRs CC4671 and CC4688) and the final disposition of these reports. The inspector also reviewed one related design change package, DCP 3CC-ZC-157 and one field change request, FCR 32,656- .
No deviations or violations of NRC requirements were identifie i Safety Related Structures - Structural Steel and Supports I - Unit 3 f Review of Quality Records
- The inspector reviewed the pertinent work and quality records associated I with structural steel and supports outside of containment, to ascertain f whether these records meet established procedures and whether these }
i records reflect work accomplishment consistent with RRC requirements and
'
FSAR commitments. The inspector noted that due to the design of the plant very few major components (located outside of containment) are
!
I
-._.,7 ., x,__ . -_,,m -.my, ,r._ m _...,_._ ,.__.~,., _ _, __e,.mm----.,_mm-m,._ .-m_
_ _ _ __.- . . _ - _ . . . _ _ _ _ _ . - _ _ _ . . _ _. ._.
i t
.
. 10 i
i supported by structural steel. Most major components located outside of containment are bolted directly to the floor to embed plates. The only major components located outside containment supported by structural steel are the Low Pressure Safety Injection (LPSI) and Containment Spray pumps, which had been examined previously in NRC Inspection Report N /82-01. Therefore, after consulting with licensee personnel, the
inspector selected four large structural steel pipe supports assemblies in the Auxiliary Building supperting 18" Safety Injection System lines, for examination.
I s
The inspector examined the following pipe supports and the associated
structural stee *
13-SI-009-H-001
13-SI-009-H-002
13-SI-009-H-004
l 13-SI-009-H-005 i
- The inspector examined the associated records for these supports which
! included the material tests and certification records the receiving j inspection, nonconformance, construction installation, and inspection reports for the structural steel. Additionally, the qualification
! records of the quality control inspectors who had accepted the structures
were examine l No deviations or violations of NRC requirements were identifie ,
1 Safety Related Piping - Unit 3
} Review of Quality Assurance Implementing Procedures
The inspector reviewed the following piping specifications and procedures to assure conformance to standard industry practices, the l facility FSAR, the applicable codes and NRC regulatory requirement *
WPP/QCI No. 202, Piping System Installatio *
Specification 13-PM-204, Field Fabrication and Installation of Nuclear Pipin Specification 13-PM-205, Field Fabrication and Installation of Non-Nuclear Pipin *
! Specification 13-PM-302, Field Fabrication and Erection of
! Embeded Drainage, Domestic Water Piping and Floor and Equipment
.
Drain System.
Specification 13-CH-335, Underground Utilities.
,
Specification 13-JM-702, Installation Specification for Instrumentation and Controls.
!
- No deviations or violations of NRC requirements were identified.
!
,
- ,,--,.e-.---,r..,, , . n -- n ,- - v - ,e w n ,- n ,,-,-, , _.n-.nne,,,.,,nn,,.wn-,r,_,n-~,n ,_~,,.,me~,-- . - - , , , - , , , ~ ~ ~ ,
. ~ - _- . . - . - _ _ _ - .-
.
. 11
.
h. Observation of Work and Work Activities
The inspector examined safety related piping activities in Unit N to ascertain whether the piping activities conformed to the established licensee specifications and procedures. The inspector verified that the licensee was performing quality control inspection
'
for such activities as receiving, protection and storage, nondestructive examinations, hydrostatic testing, and installation of safety related piping. The following attributes were included in ascertaining whether the activities examined met the licensee's requirement *
Conformance with inspection and work performance procedures.
'
- Conformance with record keeping requirement * Conformance with construction / installation specification *
Issuance and use of materials as specifie *
Performance of prescribed inspection *
Performance of prescribed NDE activities.
i
'
Calibration and use of proper measuring and test i equipment.
- Utilization of qualified inspection and NDE personnel.
! Findings
The inspector examined ongoing work related to Nonconformance Report No. PA-ll101 wherein, upon removal of a butterfly valve,
'
the mating flanges were found to have moved beyond allowable tolerances. The mating flanges were found to have a mismatch
- of about 11/16 inches in the vertical direction and about 9/16
, inches in the horizontal direction. The interim disposition prcvided by the NCR was to cut a vertical section of the pipe and install a longer pipe spool, thus allowing the field the
, opportunity to align the mating flanges. However, because of l the large mismatch of the mating surfaces the inspector became l concerned that the field had " cold sprung" the pipe spools into
- place during the initial installation of the butterfly valve i and thereby may have potentially exceeded the pipe stress and
- nozzle loading.
i Discussion with licensee personnel indicated that they had i
previously addressed the subject of " cold springing of pipe" as a result of an NRC concern (see NRC Report 50-528/83-02). The i
licensee's engineering evaluation of the cold springing
' indicated that in all cases examined the resulting pipe" stresses and nozzle loading were within acceptable limits.
l Further discussions with the licensee indicated that cold i
l
. . .-
. . . - - - .- - -. _-. . - - - . - ... - ... .-
l
. . -
1 I
. springing incidents are evaluated on a case by case basis and that based on the mismatch as indicated in NCR No. PA-11101 and
- the mismatches previously evaluated, the pipe stress could be !
i considered within acceptable limit However, because the NCR l l was still open, this particular case had not yet been l l specifically evaluated. The inspector's review of Bechtel i
Power Corporation letter No. B/ANPP-E-121742, dated l September 25, 1984, and letter No. B/ANPP-E-136927, dated i
July 12, 1985, indicated that the licensee had evaluated the l cold springing incidents on a number of cases involving g significant mismatch or deflection of the pipe greater than i
that indicated in NCR No. PA-1110 In these case, all pipe stresses and nozzle loading were found within acceptable i limits.
l No deviations or violations of NRC requirements were i identified.
l The inspector examined ongoing work related to Design Change
- Package (DCP) No. 3-CJ-SG-12 This DCP required the addition
'
of drain lines to the Main Steam Bypass and Atmosphere Dump
. System. The inspector examined the cut-out of the elbows and j the ongoing work related to the addition of the drain to the l system. The inspector examined the new spool pieces on all
four lines to verify conformance to the DCP, the isometric l
'
drawings (No. 13-P-SGF-158 and 13-P-SGF-159) and the piping and welding procedures. The inspector determined that for the two completed lines (SG-E-103-DLBB and SG-E-070-DLBB) the as-built
- condition complied with the drawing requirements.
,
No deviations or violations of NRC requirements were identified.
I The inspector examined completed work activities related to
! small and large piping installation. The fo'. lowing pipe spool were examined to assure conformance to the licensee's '
specificat. ions procedures, and drawing .
i Spool Tag Number Size
-
. 3EC189N00A 1" ,
l . 3EC180N00B 1"
. 3EC062S004 6"
, . 3EC062S005 6"
. 3EC063S001 6"
. 3EC062S002 6" i No deviations or violations of NRC requirements were l identified.
>
i j
, . ,_.-- . . . , - - ~ . ~ . . . _ _,.,,_-m-.-c., . . . . . . ,, _ %,, ,r-.. ,,g..m, . m .~. . , _~._,-.,,,..._ _, - .,.. ,-.
. _ _ . _ _ _ _ _ _ _ . __ .-- ___ _ __ . . _. _
. . 13
1 Closure of Allegation No. RV-85-A-033
. Characterization:
Inadequate review of startup testing packages by document reviewers.
t Implied Safety Significance to Plant Design, Construction, or Operations i
Inadequate review of startup testing packages could effect the ability to determine whether required preoperational tests or maintenance actions had been performed as required.
j Assessment of Safety Significance:
On May 15, 1985, the Senior Resident Inspector received a telephone call from an individual who stated that persons reviewing startup acceptance
! testing packages were marking "Not Applicable" (N/A) in places where the documentation asked whether a particular test or preventive maintenance l' action had been taken or would be required. This individual later contacted the licensee and provided the licensee with this and other allegation The inspector reviewed the licensee's investigation of this individual's allegations, reviewed the applicable licensee procedures utilized by document reviewers, and examined startup acceptance testing packages reviewed during the time the individual was in the document review grou The inspector found that the alleger had identified to his supervisors in October 1984 that document reviewers were marking "N/A" on the document review report to indicate that they had not looked at a particular test
,
or maintenance action during their review. The alleger indicated to his
'
supervisor that if a particular test was not examined, then the correct
'
entry in the document should be an explanation indicating that at the time of the review the particular test or maintenance had not been
'
performed, was not required, or had not been examined. The alleger's supervisor agreed, and directed that the alleger and another Quality '
j Assurance engineer review completed packages, correct the entries, and
'
provide revised copies of the document review report ,
The inspector reviewed fifteen original copies, and the fifteen revised copies of the document review reports. The reports examined appeared to have been processed in accordance with ANPP Instruction No. 61417.12.01, which states in paragraph No. 4.3.1 that document reviewers sample
,~
selected preoperational, maintenance, and prerequisite tests required in the subsystem. Therefore, the document reviews were not required to review all preoperational test or maintenance required for the particular i y system, but only sample a number of the test In some cases when a l i particular test had not been completed prior to the review and therefore I could not be reviewed at that time, the reviewers indicated this by t marking "N/A". However, after the concern was raised by the alleger, the concern was addressed and corrected as indicated above.
i i
I
'
_ _ _ - - . . ~ . _ . _ . _ _ __ - . _ _ _ _ _ _ _ _ - . . . - _ _ _ _ _ _ . - _ _ _ . - , . - , _ _ _ . _ , - _
.
. . 14 '
l Staff Position:
The allegation was substantiated; however, it had been previously addressed by the licensee and appropriately correcte This allegation is closed. No violations or deviations were identifie . Plant Tour of the Site On a weekly basis, the inspector and licensee representatives tour the site to observe general housekeeping conditions, care and preservation of equipment, handling of components, tagging and identification of material. During this reporting period the inspector noted that housekeeping had deteriorated in certain levels of the Containment Building. After discussion with the licensee, the inspector noted that during subsequent housekeeping tours of both Unit Nos. 2 and 3, the housekeeping had substantially improved. The licensee has made a concerted effort to improve housekeeping at both units, by conducting
'
meetings with craft and stressing the importance of housekeepin Additionally, steps have been taken to limit food in the buildings, eliminate graffiti, and the establishment of a Housekeeping Marshall program. The Housekeeping Marshall has responsibility for conducting walkdowns of his particular area and assuring the cleanliness of his area.
1, No deviations or violations of NRC requirements were identifie . Exit Interview The NRC inspectors met on September 20, 1985, with licensee management '
representatives denoted in paragraph The scope of the inspection and inspection findings as noted in this report were discussed.
,
.
!