Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20196D6391998-11-20020 November 1998 Notice of Violation from Insp on 981019-24.Violation Noted: Licensee Submitted Physical Security Plan Rev 40 Which Contained 10 Changes to Physical Security Plan That Decreased Safeguard Effectiveness of Plan ML20236N0381998-07-10010 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:On or About 980310, Unit 3 Operators Failed to Demonstrate Operability of Operable Offsite Power Circuits ML20138C1071997-04-22022 April 1997 Notice of Violation from Insp on 970317-21.Violation Noted:Safeguards Documents Discovered Outside Protected Area Unsecured in Terminated Employee Desk ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057C5941993-09-0909 September 1993 Notice of Violation from Insp on 930621-0709.Violation Noted:Despite Licensee Chemistry Manager Receipt of from Combustion Engineering Identifying Potential for Dilution of Sample,Licensee Failed to Establish Measures ML20056C8501993-07-0101 July 1993 Notice of Violation from Insp on 930427-0531.Violation Noted:Licensee Failed to Meet Surveillance Requirements for Testing Snubbers in Plants ML20056C8451993-07-0101 July 1993 Notice of Violation from Insp on 930426-0514.Violation Noted:Sgtr Event Involving RCS Leakage Greater than 44 Gpm & Previous Condition Involving RCS Leakage Greater than Charging Pump Capacity,Not Classified as SAE ML20127B0961992-12-22022 December 1992 Notice of Violation from Insp on 921026-30 & 1116-20. Violation Noted:On 921110,procedures Were Not Adhered to in That Survey Not Performed or Documented to Illustrate Impact of Cumulative Dose Rates ML20126E0241992-12-0808 December 1992 Notice of Violation from Insp on 921005-09.Violation Noted: Licensee Lost All Meteorological Instrumentation for Approx 7 H But Failed to Declare Unusual Event within 30 Minutes of Loss of Instrumentation on 920822 ML20126B9031992-12-0404 December 1992 Notice of Violation from Insp on Stated Date.Violation Noted:Boric Acid Make Up Pump Discharge Check Valves CHN-V154 & CHN-155 Were Not in Licensee IST Program & Were Not Being Tested Individually ML20128C2671992-11-0303 November 1992 Notice of Violation from Insp on 920825-0930.Violation Noted:On 920903,CR Personnel Inattentive to Plant Instrumentation & Failed to Respond to Abnormal Alarm Indication,Resulting in Flooding of Auxiliary Bldg ML20205E8191987-03-13013 March 1987 Notice of Violation from Insp on 861201-12 ML20199D7451986-06-16016 June 1986 Notice of Violation from Insp on 860113-24 & 0203-14. Violations Noted:Masonry Block Walls Incorrectly Classified as Quality Class & Several Class 1E Components Exhibited Poor Workmanship & Inadequate Vendor Product Quality IA-86-363, Partially Deleted Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $100,000 Due to Security Violations1986-05-0505 May 1986 Partially Deleted Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $100,000 Due to Security Violations ML20205M5801986-05-0505 May 1986 Partially Deleted Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $100,000 Due to Security Violations ML20138B5661985-10-0808 October 1985 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Program Not Established to Ensure Capability to Obtain & Analyze post-accident Containment Atmosphere Samples IR 05000801/20090081985-10-0404 October 1985 Notice of Violation from Insp on 850801-0908 IR 05000528/20070071985-08-13013 August 1985 Notice of Violation from Insp on 850528-0707 IR 05000603/20070311985-08-0808 August 1985 Notice of Violation from Insp on 850603-0731 IR 05000530/20070011985-07-30030 July 1985 Notice of Violation from Insp on 850530-0701 ML20132D5381985-07-0808 July 1985 Notice of Violation from Insp on 850429-0503 & 13-17 ML20127K8401985-06-11011 June 1985 Notice of Violation from Insp on 850325-29 ML20058D2881982-07-0909 July 1982 Notice of Violation from Insp on 820420 ML20054N0621982-06-25025 June 1982 Notice of Violation from Insp on 820329-0402 1998-07-10
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures ML20196D6391998-11-20020 November 1998 Notice of Violation from Insp on 981019-24.Violation Noted: Licensee Submitted Physical Security Plan Rev 40 Which Contained 10 Changes to Physical Security Plan That Decreased Safeguard Effectiveness of Plan ML20236N0381998-07-10010 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:On or About 980310, Unit 3 Operators Failed to Demonstrate Operability of Operable Offsite Power Circuits IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program ML20138C1071997-04-22022 April 1997 Notice of Violation from Insp on 970317-21.Violation Noted:Safeguards Documents Discovered Outside Protected Area Unsecured in Terminated Employee Desk IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IA-98-273, Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant1994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20236U9511994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms ML20057C5941993-09-0909 September 1993 Notice of Violation from Insp on 930621-0709.Violation Noted:Despite Licensee Chemistry Manager Receipt of from Combustion Engineering Identifying Potential for Dilution of Sample,Licensee Failed to Establish Measures IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power1993-08-30030 August 1993 PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee1993-08-11011 August 1993 PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8501993-07-0101 July 1993 Notice of Violation from Insp on 930427-0531.Violation Noted:Licensee Failed to Meet Surveillance Requirements for Testing Snubbers in Plants ML20056C8451993-07-0101 July 1993 Notice of Violation from Insp on 930426-0514.Violation Noted:Sgtr Event Involving RCS Leakage Greater than 44 Gpm & Previous Condition Involving RCS Leakage Greater than Charging Pump Capacity,Not Classified as SAE ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined1993-03-25025 March 1993 PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage ML20127B0961992-12-22022 December 1992 Notice of Violation from Insp on 921026-30 & 1116-20. Violation Noted:On 921110,procedures Were Not Adhered to in That Survey Not Performed or Documented to Illustrate Impact of Cumulative Dose Rates ML20126E0241992-12-0808 December 1992 Notice of Violation from Insp on 921005-09.Violation Noted: Licensee Lost All Meteorological Instrumentation for Approx 7 H But Failed to Declare Unusual Event within 30 Minutes of Loss of Instrumentation on 920822 IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items ML20126B9031992-12-0404 December 1992 Notice of Violation from Insp on Stated Date.Violation Noted:Boric Acid Make Up Pump Discharge Check Valves CHN-V154 & CHN-155 Were Not in Licensee IST Program & Were Not Being Tested Individually IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI 1999-06-30
[Table view] |
Text
- __ . - - - _ _ _ - _ _ _ _ _ _ _ _ _ - - - _ - _ _ _ _ _ _-_--_-
m.
i NOTICE OF VIOLATION -
AND PROPOSED IMPOSITION OF civil PENALTY Arizona Public Service Company Docket Nos. 50-528;50-529;50-530 ,
Palo Verde Nuclear Generating Station License Nos. NPF-41; NPF-51; NPF-74 j EA 98-131 '
During an NRC investigation completed on February 13,1998, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the Nuclear Regulatory Commission proposes to impose a civil penalty pursuant to Section 234 of the Atomic Energy Act of 1954, as amended (Act),42 U.S.C. 2282,'and 10 CFR 2.205. The particular violations and associated civil penalty are set forth below:
A. . Palo Verde Nuclear Generating Station Unit 3 Technical Specification 3.8.1.1, Action b, requires that when an emergency diesel generator is out of service, operators must q demonstrate the operability of the operable offsite power circuits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. l l
' Contrary to this requirement, on or about March 10,1993, Unit 3 operators failed to demonstrate the operability of the operable offsite power circuits. The verification was I performed several hours later. (01013) '
.B. 10 CFR 50.9 requires, in part, that information required by the Commission's regulations or license conditions to be maintained by the licensee shall be complete and accurate in all material respects.
Palo Verde Nuclear Generating Station Unit 3 Technical Specification 6.8.1 requires that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Regulatory Guide 1.33, Revision 2, Appendix A, Section 1.h., requires administrative procedures for log entries, record retention, and review procedures.
Palo Verde's Nuclear Administrative and Technical Manual Procedure 40DP-90P22,
' " Operations Logkeeping," Revision 00.00, Step 3.2.9 required that the Unit log shall include entries documenting completion of required actions to comply with a limiting condition for operation (LCO).
Palo Verde's Nuclear Administrative and Technical Manual Procedure 43ST-3ZZ02,
" Inoperable Power Sources Action Statement Surveillance 3.8.1.1," Revision 01.04, L . provided for actions and verifications required to be performed by the action statements of LCO 3.8.1.1, in the event that an emery:,cy diesel generator is declared inoperable.
. Step 7.3 directed that Sections 8.1 and 8.2 be performed to verify that two offsite power sources are operable within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and that the indicated sections of the procedure be completed.
Contrary to these requirements, on or about March 10,1993, information contained in a required record was not complete and accurate in all material respects. Specifically,
~
- 9907140371 990710 PDR ADOCK 05000529 G PDR ,
l 1 l i
Unit 3 operators failed to demonstrate the operability of the operable offsite power l service within one hour as required by Technical Specification 3.8.1.1, Action b, as described in Violation A; however, the Unit log was completed so as to indicate that the action statement of LCO 3.8.1.1 was satisfactorily completed. Also, the required sections of Procedure 43ST-3ZZ02 were completed so as to reflect the action was completed within the required 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> time period. (01023)
C. 10 CFR 50.73(a)(2)(1)(B), requires that the licensee shall submit a Licensee Event Report l (LER) within 30 days after discovery of the event for any operation or condition prohibited by the plant's Technical Specifications.
Palo Verde Nuclear Generating Station Unit 3 Technical Specification 3.8.1.1 requires that when an emergency diesel generator is out of service, operators must demonstrate l the operability of the operable offsite power circuits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
Contrary to this requirement, the licensee failed to submit an LER within 30 days of the discovery of an event for a condition prohibited by the plant's Technical Specifications.
Specifically, on March 10,1993, Unit 3 operators failed to demonstrate, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of removing an emergency diesel generator from service, the operability of the operable 4 offsite power circuits, as required by Action b. of Technical Specification 3.8.1.1; however, as of April 9,1993,30 days following this event, the licensee had not submitted an LER. (01033)
These violations represent a Severity Level 111 problem (Supplements I and Vil).
Civil Penalty - $50,000.
Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service Company (Licensee)is hereby required to submit a written statement or explanation to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, within 30 days of the date of this Notice of Violation and Proposed imposition of Civil Penalty (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each alleged violation: (1) admission or denial of the alleged violation, (2) the reasons for the violation if admitted, and if denied, the reasons why, (3) the corrective steps that have been taken and the results achieved, (4) the corrective steps that will be taken to avoid further violations, and (5) the date when full compliance will be achieved. If an adequate reply is not received within the time specif;ed in this Notice, an order or a Demand for Information may be issued as why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken. Consideration may be given to extending the response time for good cause shown.
Under the authority of Section 182 of the Act,42 U.S.C. 2232, this response shall be submitted under oath or affirmation.
l Within the same time as provided for the response required above under 10 CFR 2.201, the l Licensee may pay the civil penalty by letter addressed to the Director, Office of Enforcement,
) U.S. Nuclear Regulatory Commission, with a check, draft, money order, or electronic transfer l
payable to the Treasurer of the United States in the amount of the civil penalty proposed above, or the cumulative amount of the civil penalties if more than one civil penalty is proposed, or may
1 protest imposition of the civil penalty in whole or in part, by a written answer addressed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission. Should the Licensee fail 3
to answer within the time specified, an order imposing the civil penalty will be issued. Should the j Licensee elect to file an answer in accordance with 10 CFR 2.205 protesting the civil penalty, in l whole or in part, such answer should be clearly marked as an " Answer to a Notice of Violation" and may: (1) deny the violations listed in this Notice, in whole or in part, (2) demonstrate ];
extenuating circumstances, (3) show error in this Notice, or (4) show other reasons why the {
penalty should not be imposed. In addition to protesting the civil penalty in whole or in part. such answer may request remission or mitigation of the penalty, in requesting mitigation of the proposed penalty, the factors addressed in Section VI.B.2 of the Enforcement Policy should be addressed. Any written answer in accordance with 10 CFR 2.205 should be set forth separately from the statement or explanation in reply pursuant to j 10 CFR 2.201, but may incorporate parts of the 10 CFR 2.201 reply by specific reference (e.g., j citing page and paragraph numbers) to avoid repetition. The attention of the Licensee is l
directed to the other provisions of 10 CFR 2.205, regarding the procedure for imposing a civil penalty.
j Upon failure to pay any civil penalty due which subsequently has been determined in accordance with the applicable provisions of 10 CFR 2.205, this matter may be referred to the Attorney General, and the penalty, unless compromised, remitted, or mitigated, may be collected by civil action pursuant to Section 234c of the Act. 42 U.S.C. 2282c.
The response noted above (Reply to Notice of Violation, letter with payment of civil penalty, and Answer to a Notice of Violation) should be addressed to: James Lieberman, Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, One White Flint North,11555 Rockville Pike, Rockville, MD 20852-2738, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011, and a copy to the NRC Resident lnspector at the facility that is the subject of this Notice.
Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptan response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you_mtst specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by
- l. 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information).' If safeguards information is necessary to provide an acceptable response, please I
provide the level of protection described in 10 CFR 73.21.
Dated at Arlington, Texas, this10th July 1998 t
- _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ~