Notice of Violation from Insp on Stated Date.Violation Noted:Boric Acid Make Up Pump Discharge Check Valves CHN-V154 & CHN-155 Were Not in Licensee IST Program & Were Not Being Tested Individually
ML20126B903
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/04/1992
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20126B887 List:
References
50-528-92-36, 50-529-92-36, 50-530-92-36, NUDOCS 9212220271
Download: ML20126B903 (3)


Text

_ _ _.. -. _ _ _ _. _ _. _ - _ _

NOTICE OF VIOLATION Arizona Public Service Company Docket Nos. 50-528, 50-529, and 50-530 Palo Verde Units 1, 2, and 3 License Nos. NPF-41, NPF-51, and NPF-74 During an NRC inspection conducted during the weeks of October 19 and November 2,1992, three violations of NRC requirements were identified.

In accordance with the " General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violations are identified below:

A.

Technical Specification 4.0.5 states in part that, "... inservice testing of ASME Code Class 1, 2, and 3 pumps and valves will be performed in accordance with...Section XI of the ASME Boiler and Pressure Vessel Code and Addenda...."

Licensee drawing number 13-M-CHP-002, Revision 31, "P and I Diagram Chemical and Volume Control System," identifies Boric Acid Make Up Pump Discharge Check Valves CHN-V154 and CHN-V155 as Class QlC equipment.

Class Q10 is the licensee designation for safety related, seismic Class 1, ASME Class 3 equipment.

Contrary to the above, on November 3, 1992, the NRC inspectors identified that boric acid make up pump discharge check valves CHN-V154 and CHN-VISS were not in the licensee's Inservice Testing (IST)

Program and were not being tested individually in accordance with Section XI of the applicable ASME Boiler and Pressure Vessel Code and Addenda.

This is a Severity Level IV violation (Supplement 1), applicable to Units 1, 2, and 3.

B.

10 CFR Part 50, Appendix B, Criterion XVI states in part that,

" Measures shall be established to assure that conditions adverse to quality, such as... deviations...and nonconformances are promptly identified and corrected."

Section 8.4.2 of Revision 6 of licensee procedure 73TI-9ZZl9 states in part that "...(an EER [ Engineering Evaluation Request] per~ 73AC-OEE01 for non-quality related items) shall be initiated for all items reflecting an unacceptable condition."

Section 8.5.2 of Revision 4 of licensee procedure 73TI-9ZZl8 states-in part that "For all quality related items reflecting an unacceptable condition an HNCR [ Material Non-Conformance-Report] per 60AC-0QQ01 should be. initiated, and for all non-quality related items an EER (Engineering Evaluation Request] per 73AC-0EE01 should be initiated."

Pacific Valves drawing number 7-509-B (Licensee drawing number P2228-141-4) identified auxiliary feedwater pump AFN-P01 discharge check valve 3PAFN-V012 bonnet cap screws, piece 2, material as ASTM A193, Grade B7.

9212220271 921204 PDR ADOCK 05000528 G

PDR

2 Section A-A of Revision 5 of licensee drawing 13SI-241-H-007 identified mechanical snubber support 3S1-241-007 as size 3, Class QlB equi) ment, with an assigned load equal to 8308 pounds.

Class QlB is tie licensee designation for safety related, seismic Class 1, ASME Class 2 equipment.

Contrary to the above:

As of November 2,1992, an engineering evaluation request was not initiated following licensee identification of unacceptable conditions identified during a visual examination of auxiliary feedwater pump AFN-P01 discharge check valve 3PAFN-V012 per procedure 73TI-9ZZl9 on April 11, 1991.

The itcensee's examination identified that the internal disc hinge bracket cap screw lock plate tabs were not properly bent up to lock the cap screws in place and the external bonnet cap screws were not ASTM A193, Grade B7 material or equivalent.

As of November 5, 1992, neither an MNCR nor an EER was initiated following the licensee identification of an unacceptable condition of mechanical snubber support 351-241-007 during a visual examination on October 7, 1992.

The visual examination identified that according to its label plate, snubber 351-241-007 was rated for 6000 pounds, which was less than its assigned load of 8308 pounds.

This is a Severity Level IV Violation (supplement 1), applicable to Unit 3.

C.

Technical Specification 6.8.1 states in part that, " Written procedures shall be established, implemented, and maintained covering... applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978...." Appendix A of Regulatory Guide 1.33 specifies procedures for procedure adherence in performing inspections and maintenance.

Section G.2.2 of Revision 6 of licensee Procedure 73TI-9ZZl9,

" Visual Examination of Pump and Valve Internal Surfaces," states in part that, "For [ check valve] examinations all internal parts and surfaces shall be examined per Appendix B, as applicable."

Contrary to the above on March 29,1992,.the licensee performed a visual examination of check valve IPSGE-V003 per Revision 6 of Procedure 73TI-9ZZl9 and did not examine all internal parts and surfaces per Appendix B.

This is a Severity Level IV Violation (supplement 1), applicable to Unit 1.

Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service Company is hereby required to submit a written statement or explanation to the U. S.

X 3

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C.

20555 with a copy to the Regional Administrator, Region V, and a copy to the NRC Resident inspector at the Palo Verde Nuclear Generating Station, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).

This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, the Commission may issue an order or a demand for information as to why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

Where good cause is shown, consideration will be given to extending the responte time.

Dated at Walnut Creek, California this tih day of (tw4r) i