Insp Repts 50-528/85-13 & 50-529/85-17 on 850429-0602.No Violation Noted.Major Areas Inspected:Plant Activities, Surveillance Testing,Plant Maint,Preoperational Testing Activities & Allegations & Commitment FollowupML20129H346 |
Person / Time |
---|
Site: |
Palo Verde, 05000429 |
---|
Issue date: |
07/02/1985 |
---|
From: |
Bosted C, Fiorelli G, Miller L, Zimmerman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
---|
To: |
|
---|
Shared Package |
---|
ML20129H338 |
List: |
---|
References |
---|
50-528-85-13, 50-529-85-17, GL-83-28, NUDOCS 8507180623 |
Download: ML20129H346 (12) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:UTILITY
MONTHYEARIR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl IR 05000528/19860351986-12-30030 December 1986 Partially Withheld Insp Repts 50-528/86-35 & 50-529/86-35 on 861110-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Allegation RV-85-A-0068 Re Coverup of Investigation IR 05000528/19860291986-11-25025 November 1986 Insp Repts 50-528/86-29 & 50-529/86-28 on 861027-31.No Significant Deficiencies or Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise & Associated Critiques IR 05000528/19860271986-09-26026 September 1986 Insp Repts 50-528/86-27,50-529/86-26 & 50-530/86-20 on 860804-0907.No Violations Noted.Major Areas Inspected: Followup of Previously Identified Items,Review of Plant Activities,Plant Tours & Engineered Safety Sys Walkdowns IR 05000528/19860191986-07-0202 July 1986 Insp Repts 50-528/86-19,50-529/86-19 & 50-530/86-13 on 860527-0613.No Violation or Deviation Noted.Major Areas Inspected:Open Items in Units 1 & 2,LERs in Unit 1,IE Bulletins & Generic Ltrs IR 05000528/19860141986-04-30030 April 1986 Partially Deleted Enforcement Conference Repts 50-528/86-14 & 50-529/86-14 on 860410.Major Areas Discussed:Violations Re Security Noted in Insp Repts 50-528/86-07 & 50-529/86-06,NRC Concerns & Licensee Corrective Actions ML20205M5101986-04-0202 April 1986 Partially Deleted Insp Repts 50-528/86-07 & 50-529/86-06 on 860211-0313.Noncompliances Noted:Vital Area Not Limited Only to Authorized Individuals,Failure to Respond to Vital Area Alarms & Vital Area Barriers Not Adequately Maintained IR 05000528/19860011986-01-21021 January 1986 Insp Repts 50-528/86-01,50-529/86-01 & 50-530/86-01 on 860106-10.No Violation or Deviation Identified.Major Areas Inspected:Tmi Action Plan Items & Operational Safety in Unit 2 & 100% Load Rejection Test in Unit 1 IR 05000528/19850341985-11-26026 November 1985 Insp Repts 50-528/85-34 & 50-529/85-34 on 850927-28 & 0930-1004.No Violation or Deficiencies Noted.Major Areas Inspected:Emergency Preparedness Program,Including Emergency Plan Training,Emergency Facilities & Equipment IR 05000528/19850411985-11-13013 November 1985 Insp Repts 50-528/85-41,50-529/85-35,50-530/85-25 & 70-2984/85-03 on 851003-04,15-29,07-11 & 30-31.No Noncompliance or Deviation Noted.Major Areas Inspected: Preoperational Test Program for Radiation Protection IR 05000528/19850371985-11-13013 November 1985 Insp Repts 50-528/85-37,50-529/85-37 & 50-530/85-27 on 850923-1104.No Violation or Deviation Noted.Major Areas Inspected:Action on NRC Enforcement Item & Quality Records Re safety-related Piping & Components IR 05000528/19850401985-11-0707 November 1985 Insp Repts 50-528/85-40 & 50-529/85-39 on 851015-1101.No Violations or Deviations Noted.Major Areas Inspected: Operational Staffing,Design Changes,Tmi Action Plan Items, IE circulars,10CFR55.55(e) Items & Surveillance Testing IR 05000528/19850351985-10-23023 October 1985 Matl Control & Accounting Insp Rept 50-528/85-35 on 851007- 10.No Violations Noted.Major Areas Inspected:Followup on Inspector Identified Problem & Unresolved Items.Details Withheld (Ref 10CFR2.790) IR 05000529/19850361985-10-18018 October 1985 Insp Rept 50-529/85-36 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Implementation of TMI Action Plan Items & Followup of 50.55(e) Repts IR 05000528/19850331985-10-16016 October 1985 Insp Repts 50-528/85-33 & 50-529/85-33 on 850916-27.No Violation or Deviation Noted.Major Areas Inspected:Tmi Action Plan Items,Ie Bulletins & Circulars,Action on Inspector Identified Items & Temporary Mods IR 05000529/19850321985-10-11011 October 1985 Insp Repts 50-529/85-32 & 50-530/85-24 on 850916-19 & 0930-1004.No Violations or Deviations Noted.Major Areas Inspected:Nde of Piping,Structural Steel & Supports & Review of RCPB Piping Records IR 05000529/19850291985-10-11011 October 1985 Insp Repts 50-529/85-29 & 50-530/85-23 on 850923-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Program & Implementation W/Emphasis on Changes Made to Program During 1984 & 1985 IR 05000528/19850281985-10-0808 October 1985 Insp Repts 50-528/85-28,50-529/85-28 & 50-530/85-22 on 850807-0922.No Violation or Deviation Noted.Major Areas Inspected:Instrument components,safety-related Structures & Closure of Allegation RV-85-A-033 IR 05000528/19850261985-09-25025 September 1985 Insp Repts 50-528/85-26 & 50-529/85-27 on 850801-0908. Violations Noted:Failure to Properly Verify Closure of Unit 1 Doors & Tech Spec Overtime Limits Exceeded W/O Approval by Plant Manager or Designee IR 05000530/19850201985-08-28028 August 1985 Insp Rept 50-530/85-20 on 850729-0802 & 12-16.No Violation or Deviation Noted.Major Areas Inspected:Activities Re Instrument Components & Sys IR 05000528/19850271985-08-28028 August 1985 Enforcement Conference Rept 50-528/85-27 on 850808.Major Areas Discussed:Problems Associated W/Implementation of post-accident Sampling Sys Required by NUREG-0737,Item II.B.3 IR 05000528/19850291985-08-22022 August 1985 Insp Repts 50-528/85-29,50-529/85-26 & 50-530/85-21 on 850805-16.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration,Qa Audits,Document Control Maint,Temporary Mods,Tests & Experiments IR 05000429/20080141985-08-21021 August 1985 Insp Rept 50-461/85-26 on 850429-0814.Violation Noted: Unacceptable Methods Used to Identify Nonconforming Conditions Re Installation of Travelers IR 05000528/19850231985-08-13013 August 1985 Insp Repts 50-528/85-23,50-529/85-24 & 50-530/85-18 on 850630-0806.No Violation or Deviation Noted.Major Areas Inspected:Observation of Work Re Electrical Cable Installation & Terminations in Unit 3 IR 05000528/19850201985-08-0909 August 1985 Insp Rept 50-528/85-20 on 850603-07.No Violation Noted.Major Areas Inspected:Program Plan,Procedures & Records Re Inservice Testing Program for Pumps & Valves & Insp Procedure 61700 IR 05000528/19850211985-08-0808 August 1985 Insp Repts 50-528/85-21 & 50-529/85-22 on 850603-0731. Violation Noted:Failure to Submit LER within 30 Days of Event IR 05000522/20060051985-08-0606 August 1985 Enhanced Team Insp Rept 50-528/85-12 on 850522-0605 & 0716. No Violations Noted.Major Areas Inspected:Operating Crews & Operational Support Activities During Initial Startup & Low Power Testing IR 05000528/19850251985-08-0101 August 1985 Insp Rept 50-528/85-25 on 850624-0724.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Ler/Deficiency Evaluation Rept Interface,Power Ascension Test Data at 20% Power Plateau & Control Room Activities IR 05000428/20060291985-07-19019 July 1985 Insp Repts 50-528/85-17,50-529/85-19 & 50-530/85-13 on 850428-0629.No Violation or Deviation Noted.Major Areas inspected:as-built Configuration & Documentation of Unit 2 Main Steam Supply Sys IR 05000429/20060111985-07-10010 July 1985 Insp Rept 50-461/85-27 on 850429-0611.No Violation or Deviation Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings IR 05000529/19850251985-07-0505 July 1985 Insp Repts 50-529/85-25 & 50-530/85-19 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Action on IE Circulars,Followup of Previously Identified Items, Const Deficiencies & Observation of Hot Functional Testing ML20132D5421985-07-0303 July 1985 Emergency Preparedness Insp Rept 50-528/85-10 on 850429-0503 & 13-17.Violation Noted:Failure to Provide Initial Training & Annual Retraining to Employees IR 05000429/20060021985-07-0202 July 1985 Insp Repts 50-528/85-13 & 50-529/85-17 on 850429-0602.No Violation Noted.Major Areas Inspected:Plant Activities, Surveillance Testing,Plant Maint,Preoperational Testing Activities & Allegations & Commitment Followup IR 05000528/19850191985-07-0101 July 1985 Insp Repts 50-528/85-19,50-529/85-21 & 50-530/85-15 on 850513-17.No Violation or Deviation Noted.Major Areas Inspected:Activities Associated W/Implementation of Selected TMI Action Items & Routine Followup of Allegations IR 05000528/19850181985-06-28028 June 1985 Insp Repts 50-528/85-18,50-529/85-20 & 50-530/85-14 on 850513-24.No Violation or Deviation Noted.Major Areas Inspected:License Conditions & Commitments,Lers,Const Deficiencies,Ie Bulletins & TMI Action Plan Items IR 05000429/20060031985-06-26026 June 1985 Insp Repts 50-440/85-22 & 50-441/85-12 on 850429-0603.No Violations or Significant Safety Issues Noted.Major Areas Inspected:Previous Insp Findings,Ser Followup Items & Preoperational Test Program Implementation 1989-09-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld ML20196D6391998-11-20020 November 1998 Notice of Violation from Insp on 981019-24.Violation Noted: Licensee Submitted Physical Security Plan Rev 40 Which Contained 10 Changes to Physical Security Plan That Decreased Safeguard Effectiveness of Plan IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures ML20236N0381998-07-10010 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:On or About 980310, Unit 3 Operators Failed to Demonstrate Operability of Operable Offsite Power Circuits IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) ML20138C1071997-04-22022 April 1997 Notice of Violation from Insp on 970317-21.Violation Noted:Safeguards Documents Discovered Outside Protected Area Unsecured in Terminated Employee Desk IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IA-98-273, Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant1994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20236U9511994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms ML20057C5941993-09-0909 September 1993 Notice of Violation from Insp on 930621-0709.Violation Noted:Despite Licensee Chemistry Manager Receipt of from Combustion Engineering Identifying Potential for Dilution of Sample,Licensee Failed to Establish Measures IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power1993-08-30030 August 1993 PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee1993-08-11011 August 1993 PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8451993-07-0101 July 1993 Notice of Violation from Insp on 930426-0514.Violation Noted:Sgtr Event Involving RCS Leakage Greater than 44 Gpm & Previous Condition Involving RCS Leakage Greater than Charging Pump Capacity,Not Classified as SAE ML20056C8501993-07-0101 July 1993 Notice of Violation from Insp on 930427-0531.Violation Noted:Licensee Failed to Meet Surveillance Requirements for Testing Snubbers in Plants IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined1993-03-25025 March 1993 PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage ML20127B0961992-12-22022 December 1992 Notice of Violation from Insp on 921026-30 & 1116-20. Violation Noted:On 921110,procedures Were Not Adhered to in That Survey Not Performed or Documented to Illustrate Impact of Cumulative Dose Rates ML20126E0241992-12-0808 December 1992 Notice of Violation from Insp on 921005-09.Violation Noted: Licensee Lost All Meteorological Instrumentation for Approx 7 H But Failed to Declare Unusual Event within 30 Minutes of Loss of Instrumentation on 920822 IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items ML20126B9031992-12-0404 December 1992 Notice of Violation from Insp on Stated Date.Violation Noted:Boric Acid Make Up Pump Discharge Check Valves CHN-V154 & CHN-155 Were Not in Licensee IST Program & Were Not Being Tested Individually IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI 1999-06-30
[Table view] |
Inspection Report - - 2006002 |
---|
|
|
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _
_
,
~
s
-
~
'
y.
,
I
,
'U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report Nos: 50'528/85-13,50-529/85-17
-
Docket Nos: 50-528, 50-529 License Nos.: NPF-41; CPPR-142 Licensee: Arizona Nuclear Power Project P. O. Box 52034 Phoenix, AZ. 85072-2034 Facility Name: Palo Verde Nuclear Generating Station Units 1 & 2 Inspection Conducted:, Ap - 2,- une 2, 1985 Inspectors: d1 0 b[
R. Fimmerman,[)fenib Date Signed Resid t Ins d'
G. FVd elli, tEr
'/
7tattr Date Signed Resid Inspg'(e r j 7/^/h C. B ted, (/ '
Date Signed Res' nt I r
~
Approved By:
LUMiller, 7bbdh Date Signed f,
Reactor Pro ts Section 2 Summary:
Inspection on April 29 - June 2, 1985 (Report Nos. 50-528/85-13 and 50-529/
85-17)
Areas Inspected: Routine, onsite, regular and backshift inspection by the three resident inspectors (Unit 1 - 283 hours0.00328 days <br />0.0786 hours <br />4.679233e-4 weeks <br />1.076815e-4 months <br />; Unit 2 - 128 hours0.00148 days <br />0.0356 hours <br />2.116402e-4 weeks <br />4.8704e-5 months <br />). Anibs inspected included: review of plant activities, surveillance testing, plant maintenance, preoperational testing activities, allegation followup, Unit 1 license commitment followup, Engineered Safety Features (ESF) configurations, Licensee Event Reports, fitness for duty program; periodic and special reports and plant tour Results: Of the eleven areas inspected, no violations were identifie .
8507180623 850703 -
PDR ADOCK 05000528 G ,
PDR
.
.
-
DETAILS Persons Contacted:
The below listed technical and supervisory personnel were among those contacted:
,
Arizona Nuclear Power Project (ANPP)
- R. Adney, - Operations Superintendent, Unit 2 J. Allen, Operations Manager L. Auterino, Nuclear Steam Supply System Test Supervisor, Unit-2
- J. R. Bynum, PVNGS Plant Manager
.
Shift Test Director Supervisor
- W. Fernow, Plant ~ Services Manager R. Gouge, Operations: Supervisor, Unit 1 F.-Hicks,
'
Training-Manager
- W.'E. Ide, Corporate Quality Assurance Manager
- D. B. Karner, Assistant Vice President, Nuclear Production R. Meye '
Fire Protection Supervisor
- D. Nelson, Operations Security Manager
- R. Nelson, Maintenance Manager J. Pollard, Operations Supervisor, Unit 2
- C. Russo, Quality Audits Manager T. Shriver, Quality Systems and Engineering Manager
~
L. Souza,_ , Assistant Quality Assurance Manager
- E. E. Van Brunt, Jr., Executive Vice President
- R. Younger, Operations Superintendent, Unit 1
- 0. Zeringue, Technical Su'pport Manager The inspectors also talked with other licensee and contractor personnel during the course of the inspectio * Attended the Exit Meeting on June 5, 198 . Review of Plant Activities (Including Initial Criticality at Unit 1) At the start of the inspection period Unit 1 was in Mode 4, and entered Mode 3 on April 29, 1985 for post core hot functional
,
testing. Testing was completed on May 15, 1985. The plant was cooled down to Mode 5 on May 16 to replace two weeping pressurizer
.
code safety valves and two main steam safety valves. The plant
,
'
entered Mode 4 on May 20, and initial criticality was achieved at
> 1:45 AM, May 25 with the reactor coolant system at 320 F and 600 ps Low power physics testing was performed from May 25 through June 1, 1985. Inspection findings and conclusions associated with the licensee's performance during initial criticality and low power physics testing will be documented in NRC Inspection Report 50-528/85-1 Unit 2 continued to perform preoperational tests in preparation for the Hot Functional Test which is scheduled for June, 198 _ _ _ _ , ._
__ ._ ___ __
.
b. An Unusual Event was declared on May 5, 1985 when the plant security computer did not return to service as expected after a planned electrical outage. All security compensatory measures were estab-lished as required by the station's security plan, c. Plant Tours The following plant areas at Units 1 and 2 were toured by the inspector during the inspection:
o Auxiliary Building o Containment Building o Control Complex Building o Diesel Generator Building o Radwaste Building o Technical Support Center o Turbine Building o Yard Area and Perimeter d. The following areas were observed during the tours: Operating Logs and Records. Records were reviewed against Technical Specification and administrative control procedure requirements. During a review of Unit 1 Control Room and Unit logs, the inspector noted that some Technical Specification action statement times were not being recorded in both logs as required by Administrative Control Procedure 40AC-92Z02, Conduct of Shift Operations. The licensee representative stated that the above procedure would be revised so that the action statement times would be required to be recorded only in the Unit log. This item will remain open pending inspector review of the procedure change (85-13-01). Monitoring-Instrumentation. Process instruments were observed for correlation between channels and for conformance with Technical Specification requirement . Shift Mannin Control room and shift manning were observed for conformance with 10 CFR 50.54 (k), Technical Specifica-tior.s, and administrative' procedure . Equipment Lineups'. . Valve and electrical breakers were verified to be in,the' position or condition required by Technical
, Specifications and by plant lineup procedures for the appli-cable plant code. This veri.fication included routine control board indic,4 ion reviews and' conduct of partial system lineup Details.as provided in paragraph I' ' Equipment Ta'gging. Selected equipment, for which tagging requests had been initiated, was observed to verify that tags were in place and.the equipment in the condition specifie , .-
.
.
- 3
. Fire Protection. ~ Fire fighting equipment and controls were observed for conformance with Technical Specifications and administrative procedure , Plant Chemistry. Chemical analysis results were reviewed for
-
conformance;with Technical Specifications and administrative control procedures'. <
' Security. Activities observed for conformance with regulatory requirements, implementation of the site security plan, and administrative procedures included vehicle and personnel access, and protected and vital area integrit . Plant Housekeeping. Plant conditions and material / equipment storage were observed to determine the general state of clean-liness, housekeeping and adherence to fire protection requirement No violations or deviations were identifie . Surveillance Testing - Unit 1 Surveillance tests required to be performed by the Technical Speci-fications were reviewed on a sampling basis to verify that:
1) the surveillance tests were correctly included on the facility schedule; 2) a technically adequate procedure existed for per-formance of the surveillance tests; 3) the surveillance tests had been performed at the frequency specified in the Technical Spec-ifications; and 4) test results satisfied acceptance criteria or were properly dispositione The following completed surveillance tests were reviewed:
41ST-1ZZ16 Routine Surveillance Daily Midnight Log, performed -
May 6, 9, 13, 198 ST-1ZZ18 Routine Surveillance Mode 1-4 logs, performed May 4, 9, 16, 198 ST-1ZZ19 Routine Surveillance Mode 5-6 performed March 20, and May 19, 198 ST-1RC02 RCS Water Inventory Balance performed April 23 and June 1, 198 ST-1AF02 Auxiliary Feedwater Pump AFP-P01 operability performed May 2, 198 During the review of the RCS water inventory balance, the inspector noted an. inconsistency in the gallons / percent level between the Appendix C - Volume Control Tank (VCT) Volume versus Percent Level Chart provided in 41ST-1RC02, and that derived in a calculation of volume from the Tank Curve Book located in the Control Room. The inspector calculated that the Appendix C chart would indicate higher total leakage than the tank curve book derivation, which would be conservative; however not accurate. The inspector discussed the matter with licensee representatives and stated that the inconsis-tency should be evaluated and corrected promptly, if necessary, to
'
s .
,
-
., ,
- provi'de an acc at'e'as'sessment of total RCS leakage. Similarly the
-
Pressurizer, Reactor Drain Tank and Equipment Drain Tank procedural
, charts for. volume / percent level should be reviewed to ensure their accuracy. The licensees representative acknowledged the inspec-
'
tor's comments 7and started an immediate review of the leakage
- procedure.- This; item remains unresolved pending completion of the licensee's. actions and subsequent inspector review (85-13-02).
- ' ,
b. ' . Portions of 'the following surveillance tests were observed to verify 4 'that: 1)-testing was being accomplished by qualified personnel in accordance with approved, technically adequate procedures; 2) the system'was properly returned to service; and 3) measuring and test equipment satisfied calibration requirement ST-9ZZ01 Post Accident Monitoring Instrument Calibration
' observed May 1, 198 ,
> 41ST-12Z18 Routine Surveillance Mode 1-4 observed May 7, 198 ST-9SB30 PPS Input Loop Calibration observed May 7, 198 ST-1DG02 "B" Diesel Generator Functional Test observed May 9, 198 No violations or deviations were identifie . Engineered Safety Features System Walk Down - Unit 1 Engineered Safety Feature Systems were walked down by the inspector to confirm that the systems were aligned in accordance with procedures 410P-1SI01 " Shutdown Cooling Initiation", 410P-1DG01 " Emergency Diesel Generator A", and 410P-1DG02 " Emergency Diesel Generator B". During the walk down of the systems, items such as hangers, supports, electrical cabie ts, and cables were inspected to determine that they were operable and in condition to perform their required functions. The inspector also verified that the system valves were in the required position and locked
- as appropriate. The local and remote position indication and controls were also confirmed to be in the required position and operable. Por-tions of the following systems were walked down on May 15 and 28, 1985:
High Pressure Safety Injection Trains "A" and "B" Low Pressure Safety Injection Trains "A" and "B" Containment Spray Systems Trains "A" and "B" Diesel Generator Trains "A" and "B"
'
On May 28,_the inspector noted that the motor operated valve LPSI/
Containment Spray Pump Train A cross connect valve, V685, was in the correct position (closed); however, the hand wheel was not locked as required by PVNGS Administrative Control Procedure 40AC-0ZZ06. Upon notificacion to the Operations Department the hand wheel was immediately locked. The inspector considered this instance to be an isolated case, but stated that implementation of locked valve controls will continue to be reviewed as part of the routine inspection progra The inspector also noted at this time that a closed out Nonconformance Report (NCR) tag was still affixed to Valve V685. A similar NCR tag was subcequently found on the High Pressure Safety Injection (HPSI) flow
- _ _ - _ _ _ _ _ _ _ _ _ _ . ,
. . .
.
.
'5
.
, indicator sensing lines. These NCR tags were brought to the attention of licensee management. The licensee informed the inspector that this problem was recently identified by the Quality Assurance Monitoring Group in their Monitoring Report SM-85-0336 dated May 24, 1985. The Quality Assurance monitoring group committed to having the system walked down and invalid tags identified and removed by June 15, 1985. This item will remain open pending followup of the licensee's actions by the inspector (85-13-03).
During the system walkdowns, the inspector noted an excessive number of leaking valves in the Auxiliary Building and Penetration Rooms. The inspector expressed a concern to licensee management that the leaks could lead to radiological difficulties particularly in controlling the spread of contamination in the future. The effects of valve leakage on in plant radiological conditions will continue to be assessed as part of the routine inspection progra No violations or deviations were identifie . Unit 1 License Commitment Followup:
The licensee's actions regarding the following license commitments were reviewed by the inspector and found acceptable. The reference in
_ parentheses corresponds to the Operating License conditio Response to Salem ATWS Event (2.C.16)
The inspector's review of the licensee's procedures that described the programmatic controls which implement the considerations con-tained in Generic Letter #83-28 dealing with the Salem ATWS event is documented in NRC inspection report number 50-528/84-51. Since issuance of the report the licensee has made additional commitments to the NRC dealing with reactor restart evaluation criteria, restart review responsibilities, equipment performance evaluations, reactor trip breaker preventative maintenance, and reactor trip breaker surveillance tests. Based on a review of operating, maintenance and surveillance test procedures, the inspector confirmed that the additional commitments have been included in plant procedures. One item dealt with confirmation of system performance with design required clarification, and will be added to the trip evaluation portion of the post trip review procedur Seismic Qualification and Pump and Valve Operability (2.C.18.b)
This commitment deals in part with the requirement to complete the operability qualification of the containment sump return check valves and the steam bypass supply check valves to the turbine driven auxiliary feedwater pum The inspection reviewed the test records which documented the per-formance of the referenced valves. Each of the tests confirmed that valve operation was as require No violations or deviations were identifie ,'.
-
.
- 6 Plant Maintenance - Unit 1
, During the inspection period, the inspector observed maintenance and problem investigation activities to verify compliance with regula-
'
tory requirements,. compliance with administrative and maintenance procedures, required QA/QC involvement, proper use of safety tags, proper equipment alignment and use of jumpers, and personnel qualif-ications. The inspector verified reportability, as required by Technical Specifications for these activities, was correc The inspector witnessed portions of the following maintenance activities:
o Troublesho'oting of a Post Accident Monitoring System ground on May 1, 198 o . Testing of the Control Element Drive Mechanisms per 73HF-1SF11 on May 7, 198 ' L ol Troubleshooting of the "B" Diesel Generator Start Circuitry on May 9, 198 ,
o Troubleshooting an excore neutron channel "B" log power instrume'nt incorrect reading on May 14, 198 o Replacement of the vacuum pump on a containment hydrogen m'o nitor per CWO 85903 on May 16,198 No violations 'or' deviations 'were identifie ~ Review of Preoperational' Testing Activities - Unit 2 ' Major Test-Activities The major preoperational test activities in progress during the reporting period were associated with the testing of the Main Feedwater System, Auxiliary Feedwater System, DC Battery System, Chemical and Volume Control System and the Diesel Generator Syste Preoperational Test Witnessing The inspector witnessed portions of the following tests:
93PE-2PK01 - Class IE 125V DC Power System 91PE-2SP01 - Essential Spray Pond System 91PE-2SG04 - Steam Generator Isolations 91PE-2CH08 - Reactor Drain Tank and Equipment Drain Tank Pumps 92PE-2SB10-1 - Reactor Protection System The inspector verified that approved procedures were used, tes personnel were knowledgeable of the test requirements, and data was properly collected. Procedure changes and test exceptions were identified and significant events were recorded in the test lo Other test related activities such as the use of calibrated M&TE and completion of test prerequisites were also verified to have been accomplished in accordance with administrative control procedure .
l
. 7
!
l Nonconformance' Condition During Preoperational Testing .
During the inspection period, the inspector reviewed a concern that all nonconformance conditions were not being resolved prior to the start of the preoperational test of the subsystem which contained the nonconformance condition. The inspector discussed the matter with Startup and Quality Assurance representatives who confirmed the !
inspector's understanding that only those nonconformances which l impacted on the test validity were required to be completed prior to i conducting the portion of the test that would be affected, and that I the evaluation of which nonconformances would impact on the pre- )
operational test validity was the responsibility of the Startup engineer in charge of the tes )
Based on discussions with APS this program requirement was developed early in the onset of the preoperational f.est program to implement the following paragraph 17.2.15 FSAR statement "Nonconformance identified prior to the start of a preoperational test will be resolved (i.e. dispositioned prior to the start of the test."
,
Preoperational test program controls also require the retesting of affected portions of systems after resolution of NCR's which are identified after a system is initially teste Prior to the start of a preoperational test, all open NCRs associated with a system to be tested were reviewed by the principal Startup Engineer and those affecting the validity of the test results were dispositioned prior to the start of the test. This review was documented in the test packages. The licensee has taken action to submit an FSAR change to clarify the handling of nonconformance conditions as it applies to the preoperational test program and plans to issue additional guidance to the fiel ' Diesel Generator Testing During the testing of the "B" Diesel Generator, the startup engineer heard anomalous noises from the vicinity of the number 5 cylinder during the shutdown of the engine. An inspection of the cylinder revealed a cracked rocker. arm which the licensee believes was caused
. by an improper installation of the cylinder push rod at the vendor's
- shop. The rocker area was replaced and the engine retested satis-factorily.'
- This engine had~been tested with 300 starts at the vendor's plant. The licensee reported this to the NRC on May 28, 1985 and it will be followed up in a subsequent inspectio . Allegations and' Inspection Findings CHARACTERIZATION (RV 845-0087 Subpart)
On March 28, 1985 an allegation was received regarding a dead weight tsster believed to have'been manufactured by Ametek, which had been dropped resulting in a bent column during the 1980 - 1981 time fram The tester was' sent to the vendor for repair, and was subsequently returned with a recommendation.that it be scrapped due to the severity of damage. The licensee then sent it to another firm located on the west
c ,
.
. 8 coast, believed to be-Ga e Repair Service, that certified the instrument and returned it to the site wherecit was placed back in service. The dead weight" tester in question was believed to have a white ball on to .
r .
IMPLIED SIGNIFICANCE TO PLANT DESIGN,. CONSTRUCTION OR OPERATION
. ,.
,
The use of a damaged or improperly calibrated dead weight tester to calibrate process instrumentation would cause instruments to give erron-cous readings. This ini turn could defeat the function of instrumentation designed to indicate'or actuate safety related equipment at required process parameter setting ASSESSMENT OF SAFETY SIGNIFICANCE Based on discussions with plant staff and a review of documentation by the inspector, the following information was obtained. Twelve dead weight testers were in service during the period in question (1979-1982).
Eight were controlled by the APS M&TE laboratory and four were controlled by the Bechtel M&TE. All of the testers were manufactured by Amete A review of records of the APS controlled testers disclosed no record of damage or equipment returned to Ametek for damage repair. The testers were routinely returned to Ametek for recalibratio Several units were found out of tolerance, requiring adjustment or component replacemen The corrective actions were based on normal usage and wear according to the APS M&TE supervisor and the Ametek documented problem description Of the four testers controlled by Bechtel, two utilize hydraulic pressure and two utilize pneumatic pressure (in the pneumatic design a ceramic white ball functions as the surface area to which force is applied). A review by the inspector of documentation associated with the four Eechtel Ametek testers identified only one tester, serial number S/M9302 (hydrau-lic unit) issued for use on January 22, 1979, as having been damaged shortly after issuance to the field. The instrument's weight tube which supports the weights was damaged and the dead weight tester was shipped to the Ametek company for recalibration. A purchase order was issued for recalibration of the tester on March 1, 1979. The tester could not be recalibrated without being repaired, so APS modified its purchase requisition to include repair of the tester. A copy of the revised purchase requisition was reviewed by the inspector. After being repaired and recalibrated, the tester was returned and received on site on May 4, 197 Copies of the certification of accuracy for both the 0.01 square inch cylinder and the 0.10 square inch cylinder which are components of *
the tester and which are used in conjunction with the weight tube were received on site and attested to the required accuracy of the teste The inspector observed copies of these certification The inspector also observed the notes of recent telephone communications between APS and Ametek in which the Ametek representative reviewed his files and was able to retrieve information substantiating the repair and calibration of tester No. S/M9302. The Ametek representative's review of records could not identify any other testers that had been returned or, received because of damage. This information substantiated the inspec-tors observations during his review of Bechtel record .
_ ,
~
.
, 9
.m .
Upon expiration of its calibration period, the tester which had been repaired and calibrated by Ametek was calibrated by another testing firm, Gauge Repair Service of Inglewood, California. A Certification of Accu-racy was' issued on April 29,.1982. - The tester is still located on site and in us ,
,
,
e ,' - - ,
" '
STAFF POSITION ,
'
,'The. inspector coulhnot'substantiatetheallegation. A damaged dead weight' tester which. fits the description provided was identified and
' records were available to indicate the instrument was repaire Certifi-cates of cal'ibration accuracy;were also on record to substantiate proper operation of the instrumen ACTION REQUIRED
~
Non . Fitness For Duty The inspector reviewed the results of an investigation initiated by the licensee and the Arizona Department of Public Service which culminated on May 13, 1985 in the arrest of six site employees for the sale of illegal drugs, principally marijuana and cocaine. The sales took place outside the protected area. Thirteen additional site employees were suspended on May 14, 1985 pending further licensee investigation into possession of illegal drugs outside the protected area. On May 21, 1985 four of the thirteen suspended were terminated for possession in the owner controlled property-parking lot outside the protected area. The remaining nine site employees returned to work on May 21, 1985; however, four of the nine individuals perform safety related work and were required to satisfy a urinalysis prior to resumption of those task The inspector compared the licensee's actions in the above investigation to ANPP policy and implementing procedure IP703.00 and 1P703.14 which detail the Fitness for Duty Program. The inspector then compared the ANPP policies against the Edison Electric Institute (EEI) Guide to Effective Drug and Alcohol Policy-Development which is endorsed by the Nuclear Utility Management and Human Resources Committee (NUMARC).
NUMARC has had significant involvement in providing policy and guidance regarding Fitness for Duty to the industry. As a result of the above review, the inspector reached the following conclusions:
o The licensee's drug investigation appeared well organized and implemented. The existing policy and guidelines regarding the use of drugs off the owner controlled property was limited, requiring considerable licensee deliberation in determining the appropriate personnel action o Based on discussions with members of Quality Assurance management, the inspector considered appropriate the ongoing actions being taken to ensure that safety was not compromised through work performed by those individuals implicated by the investigation. Actions included interviews with immediate supervision regarding employee performance
.
.
. 10'
. .
.and scope of safety-related work activities, if any. Where appro-priate, work and/or surveillance testing documentation was reviewed to ensure equipment reliability. No discrepancies were identified during the licensee's revie o The ANPP policy and implementing procedures for 1) fitness for duty and 2) drug.and alcohol abuse are in substantial agreement with the EEI guideline o Policy communication to employees warrants improvement. Employees have not been given a copy of the ANPP policy as recommended by EE Similarly, the use of bulletin boards and routine site publications are other recommended communication means which have not been used to dat The licensee desires to complete supervisory training, currently underway'on the fitness for duty policy and behavioral reliability, prior to starting extensive employee education so supervisory personnel can respond more efficiently to employee question The inspector will continue to follow the licensee's efforts in training and communicating company fitness for duty policy to site employee Additionally, revisions to the policy and implementing procedures as a result of experience gained during the recent drug investigation will also be reviewed. (85-13-04)
10. Review of Periodic and Special Reports Periodic and special reports submitted by the licensee pursuant to Technical Specifications 6.9.1 and 6.9.3 were reviewed by the inspecto This review included the following considerations: the report contained the information required to be reported by NRC requirements; test results and/or supporting information were consistent with design predictions and performance specifications; and the validity of the reported informatio Within the scope of the above, the following reports were reviewed by the inspecto o Monthly Operating Reports for April 198 o Notification of Unusual Event of May 5,198 . Licensed and Non Licensed Training and Retraining Formal training sessions required by 83TR-0ZZ04 " General Employee Train-ing Pathway" and 82TR-9ZZ03 "Requalification for Licensed Operator Retraining" were monitored by the inspector. The inspector verified that plant personnel who required access into the controlled areas of the plant received training in areas of administrative controls and proce-dures, radiological health and safety, industrial safety, controlled access and security procedures, and the emergency plan. The inspector also verified that the licensee had prepared a schedule for conducting retraining lectures and that management approved lesson plans were used in the presentation of the retraining lectures. The inspector monitored
.
? q d
__ . . _ - - . - _ _ - - _ _ _ _
,-
several lectures in the General Employee Training and Retraining areas and will continue to monitor training and retraining in the futur No violations or deviations were identifie . .
-
13.fUnEesolvedItems '
, ,
Anl unresolved item is a matter about which more information is required in order;to' ascertain whether it is an acceptable item, an open item, a deviation, or-a vidlatio i 12. ; Exit Meeting The inspdctor met $ith licensee management representatives periodically _
during the inspection and held an exit on June 5, 1985. The scope of the inspection and the. inspector's findings, as noted in this report, were discussed ~and acknowledged by the licensee representative .
-4