Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI IR 05000528/19920351992-12-0101 December 1992 Insp Repts 50-528/92-35,50-529/92-35 & 50-530/92-35 on 921001-1102.No Violations or Deviations Noted.Major Areas Inspected:Review of Plant Activities,Surveillance Testing, Plant Maint,Mgt Meeting & Diesel Engine 5 Yr Insp IR 05000528/19920321992-11-18018 November 1992 Insp Repts 50-528/92-32,50-529/92-32 & 50-530/92-32 on 921013-23.No Violations Noted.Major Areas Inspected: Emergency Operating Procedures & Operator Continuing Training (Requalification) IR 05000528/19920401992-11-0404 November 1992 Mgt Meeting Repts 50-528/92-40,50-529/92-40 & 50-530/92-40 on 921027.Major Areas Discussed:Transfer of Fire Watch Responsibilities to Security Dept & Ongoing Program within Security Dept IR 05000528/19920311992-11-0303 November 1992 Insp Repts 50-528/92-31,50-529/92-31 & 50-530/92-31 on 920825-0930.Violation Noted.Major Areas Inspected:Review of Plant Activities,Esf Sys Walkdowns at Unit 2,surveillance Testing,Plant Maint & Reactor Trip/Turbine Trip at Unit 1 IR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl 1999-06-30
[Table view] Category:UTILITY
MONTHYEARIR 05000528/19890371989-09-20020 September 1989 Insp Repts 50-528/89-37,50-529/89-37 & 50-530/89-37 on 890807-25.No Violations or Deviations Noted.Major Areas Inspected:Various Vital Areas & Equipment in Plant & Assessment of Licensee Program for Receipt & Storage IR 05000528/19890121989-09-0808 September 1989 Insp Repts 50-528/89-12,50-529/89-12 & 50-530/89-12 on 890130-0811.No Violations Noted.Major Areas Inspected: Vital Areas,Commercial Grade Procurement & Followup on 2 Allegations IR 05000528/19880201988-07-12012 July 1988 Insp Rept 50-528/88-20 on 880525-26,0606-10 & 24.Violation Noted.Major Areas Inspected:Circumstances Surrounding Reactor Startup of Unit on 880514 in Which Reactor Went Critical W/Control Element Assemblies Below Tech Spec Limit IR 05000528/19870441987-12-30030 December 1987 Insp Repts 50-528/87-44,50-529/87-43 & 50-530/87-46 on 871214-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee QA Program for Startup Testing & Operations & NRC Insp Procedures 30703,35501 & 35701 IR 05000529/19870081987-03-25025 March 1987 Corrects Insp Rept 50-530/87-09 on 870223-26 & Transmitted by .Correct Identification Number Is 50-530/87-07 in Conjunction W/Insp Rept 50-529/87-08 IR 05000528/19870091987-03-20020 March 1987 Insp Repts 50-528/87-09,50-529/87-10 & 50-530/87-11 on 870302-06.No Violation Noted.Major Areas Inspected:Emergency Preparedness Program for Unit 3,including Plan Training & Retraining of Emergency Response Personnel IR 05000528/19870041987-03-19019 March 1987 Insp Repts 50-528/87-04,50-529/87-05 & 50-530/87-05 on 870203-12 & 25-26.No Items of Noncompliance Identified.Major Areas Inspected:Capability to Perform Required Radioactivity & Chemical Analyses & Adequacy of Selected Measurements IR 05000529/19860331987-03-13013 March 1987 Insp Repts 50-529/86-33 & 50-530/86-27 on 861201-12. Violations Noted:Failure to Properly Protect Safe Shutdown Cables Through Fire Barriers & Test Breakers Mounted in Train B Essential Switch Gear Room IR 05000528/19870111987-03-12012 March 1987 Insp Repts 50-528/87-11,50-529/87-12 & 50-530/87-10 on 870302-06.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previously Identified Items IR 05000530/19870061987-03-0505 March 1987 Insp Rept 50-530/87-06 on 870202-20.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration, Records,Audits,Surveillance & Calibr Control,Maint,Safety Committee Activity,Repts & Document Control IR 05000528/19870081987-02-27027 February 1987 Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events.Meeting Agenda Encl IR 05000528/19870061987-02-0909 February 1987 Insp Repts 50-528/87-06,50-529/87-07 & 50-530/87-01 on 870105-09.No Violations Noted.Major Areas Inspected: Emergency Preparedness Program & Followup Reviews of Open Items & Info Notices IR 05000528/19860371987-01-22022 January 1987 Insp Repts 50-528/86-37,50-529/86-37 & 50-530/86-31 on 861126-870104.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Plant Tours,Fire Protection,Esf Sys Walkdowns & Surveillance Testing IR 05000528/19860361987-01-13013 January 1987 Insp Repts 50-528/86-36,50-529/86-36 & 50-530/86-36 on 861201-12 & 23.No Violations or Deviations Identified.Major Areas Inspected:Mgt Control,Training & Qualifications & Followup on Info Notices & Generic Ltrs IR 05000528/19860381987-01-0909 January 1987 Mgt Meeting Repts 50-528/86-38,50-529/86-38 & 50-530/86-30 on 861217.Major Areas Discussed:Plant Performance Indicators.Meeting Agenda Encl IR 05000528/19860351986-12-30030 December 1986 Partially Withheld Insp Repts 50-528/86-35 & 50-529/86-35 on 861110-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Allegation RV-85-A-0068 Re Coverup of Investigation IR 05000528/19860291986-11-25025 November 1986 Insp Repts 50-528/86-29 & 50-529/86-28 on 861027-31.No Significant Deficiencies or Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise & Associated Critiques IR 05000528/19860271986-09-26026 September 1986 Insp Repts 50-528/86-27,50-529/86-26 & 50-530/86-20 on 860804-0907.No Violations Noted.Major Areas Inspected: Followup of Previously Identified Items,Review of Plant Activities,Plant Tours & Engineered Safety Sys Walkdowns IR 05000528/19860191986-07-0202 July 1986 Insp Repts 50-528/86-19,50-529/86-19 & 50-530/86-13 on 860527-0613.No Violation or Deviation Noted.Major Areas Inspected:Open Items in Units 1 & 2,LERs in Unit 1,IE Bulletins & Generic Ltrs IR 05000528/19860141986-04-30030 April 1986 Partially Deleted Enforcement Conference Repts 50-528/86-14 & 50-529/86-14 on 860410.Major Areas Discussed:Violations Re Security Noted in Insp Repts 50-528/86-07 & 50-529/86-06,NRC Concerns & Licensee Corrective Actions ML20205M5101986-04-0202 April 1986 Partially Deleted Insp Repts 50-528/86-07 & 50-529/86-06 on 860211-0313.Noncompliances Noted:Vital Area Not Limited Only to Authorized Individuals,Failure to Respond to Vital Area Alarms & Vital Area Barriers Not Adequately Maintained IR 05000528/19860011986-01-21021 January 1986 Insp Repts 50-528/86-01,50-529/86-01 & 50-530/86-01 on 860106-10.No Violation or Deviation Identified.Major Areas Inspected:Tmi Action Plan Items & Operational Safety in Unit 2 & 100% Load Rejection Test in Unit 1 IR 05000528/19850341985-11-26026 November 1985 Insp Repts 50-528/85-34 & 50-529/85-34 on 850927-28 & 0930-1004.No Violation or Deficiencies Noted.Major Areas Inspected:Emergency Preparedness Program,Including Emergency Plan Training,Emergency Facilities & Equipment IR 05000528/19850411985-11-13013 November 1985 Insp Repts 50-528/85-41,50-529/85-35,50-530/85-25 & 70-2984/85-03 on 851003-04,15-29,07-11 & 30-31.No Noncompliance or Deviation Noted.Major Areas Inspected: Preoperational Test Program for Radiation Protection IR 05000528/19850371985-11-13013 November 1985 Insp Repts 50-528/85-37,50-529/85-37 & 50-530/85-27 on 850923-1104.No Violation or Deviation Noted.Major Areas Inspected:Action on NRC Enforcement Item & Quality Records Re safety-related Piping & Components IR 05000528/19850401985-11-0707 November 1985 Insp Repts 50-528/85-40 & 50-529/85-39 on 851015-1101.No Violations or Deviations Noted.Major Areas Inspected: Operational Staffing,Design Changes,Tmi Action Plan Items, IE circulars,10CFR55.55(e) Items & Surveillance Testing IR 05000528/19850351985-10-23023 October 1985 Matl Control & Accounting Insp Rept 50-528/85-35 on 851007- 10.No Violations Noted.Major Areas Inspected:Followup on Inspector Identified Problem & Unresolved Items.Details Withheld (Ref 10CFR2.790) IR 05000529/19850361985-10-18018 October 1985 Insp Rept 50-529/85-36 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Implementation of TMI Action Plan Items & Followup of 50.55(e) Repts IR 05000528/19850331985-10-16016 October 1985 Insp Repts 50-528/85-33 & 50-529/85-33 on 850916-27.No Violation or Deviation Noted.Major Areas Inspected:Tmi Action Plan Items,Ie Bulletins & Circulars,Action on Inspector Identified Items & Temporary Mods IR 05000529/19850291985-10-11011 October 1985 Insp Repts 50-529/85-29 & 50-530/85-23 on 850923-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Program & Implementation W/Emphasis on Changes Made to Program During 1984 & 1985 IR 05000529/19850321985-10-11011 October 1985 Insp Repts 50-529/85-32 & 50-530/85-24 on 850916-19 & 0930-1004.No Violations or Deviations Noted.Major Areas Inspected:Nde of Piping,Structural Steel & Supports & Review of RCPB Piping Records IR 05000528/19850281985-10-0808 October 1985 Insp Repts 50-528/85-28,50-529/85-28 & 50-530/85-22 on 850807-0922.No Violation or Deviation Noted.Major Areas Inspected:Instrument components,safety-related Structures & Closure of Allegation RV-85-A-033 IR 05000528/19850261985-09-25025 September 1985 Insp Repts 50-528/85-26 & 50-529/85-27 on 850801-0908. Violations Noted:Failure to Properly Verify Closure of Unit 1 Doors & Tech Spec Overtime Limits Exceeded W/O Approval by Plant Manager or Designee IR 05000530/19850201985-08-28028 August 1985 Insp Rept 50-530/85-20 on 850729-0802 & 12-16.No Violation or Deviation Noted.Major Areas Inspected:Activities Re Instrument Components & Sys IR 05000528/19850271985-08-28028 August 1985 Enforcement Conference Rept 50-528/85-27 on 850808.Major Areas Discussed:Problems Associated W/Implementation of post-accident Sampling Sys Required by NUREG-0737,Item II.B.3 IR 05000528/19850291985-08-22022 August 1985 Insp Repts 50-528/85-29,50-529/85-26 & 50-530/85-21 on 850805-16.No Violation or Deviation Noted.Major Areas Inspected:Qa/Qc Administration,Qa Audits,Document Control Maint,Temporary Mods,Tests & Experiments IR 05000528/19850231985-08-13013 August 1985 Insp Repts 50-528/85-23,50-529/85-24 & 50-530/85-18 on 850630-0806.No Violation or Deviation Noted.Major Areas Inspected:Observation of Work Re Electrical Cable Installation & Terminations in Unit 3 IR 05000528/19850201985-08-0909 August 1985 Insp Rept 50-528/85-20 on 850603-07.No Violation Noted.Major Areas Inspected:Program Plan,Procedures & Records Re Inservice Testing Program for Pumps & Valves & Insp Procedure 61700 IR 05000528/19850211985-08-0808 August 1985 Insp Repts 50-528/85-21 & 50-529/85-22 on 850603-0731. Violation Noted:Failure to Submit LER within 30 Days of Event IR 05000522/20060051985-08-0606 August 1985 Enhanced Team Insp Rept 50-528/85-12 on 850522-0605 & 0716. No Violations Noted.Major Areas Inspected:Operating Crews & Operational Support Activities During Initial Startup & Low Power Testing IR 05000528/19850251985-08-0101 August 1985 Insp Rept 50-528/85-25 on 850624-0724.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Ler/Deficiency Evaluation Rept Interface,Power Ascension Test Data at 20% Power Plateau & Control Room Activities IR 05000428/20060291985-07-19019 July 1985 Insp Repts 50-528/85-17,50-529/85-19 & 50-530/85-13 on 850428-0629.No Violation or Deviation Noted.Major Areas inspected:as-built Configuration & Documentation of Unit 2 Main Steam Supply Sys IR 05000529/19850251985-07-0505 July 1985 Insp Repts 50-529/85-25 & 50-530/85-19 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Action on IE Circulars,Followup of Previously Identified Items, Const Deficiencies & Observation of Hot Functional Testing ML20132D5421985-07-0303 July 1985 Emergency Preparedness Insp Rept 50-528/85-10 on 850429-0503 & 13-17.Violation Noted:Failure to Provide Initial Training & Annual Retraining to Employees IR 05000429/20060021985-07-0202 July 1985 Insp Repts 50-528/85-13 & 50-529/85-17 on 850429-0602.No Violation Noted.Major Areas Inspected:Plant Activities, Surveillance Testing,Plant Maint,Preoperational Testing Activities & Allegations & Commitment Followup IR 05000528/19850191985-07-0101 July 1985 Insp Repts 50-528/85-19,50-529/85-21 & 50-530/85-15 on 850513-17.No Violation or Deviation Noted.Major Areas Inspected:Activities Associated W/Implementation of Selected TMI Action Items & Routine Followup of Allegations IR 05000528/19850181985-06-28028 June 1985 Insp Repts 50-528/85-18,50-529/85-20 & 50-530/85-14 on 850513-24.No Violation or Deviation Noted.Major Areas Inspected:License Conditions & Commitments,Lers,Const Deficiencies,Ie Bulletins & TMI Action Plan Items IR 05000428/20050311985-06-26026 June 1985 Insp Repts 50-440/85-26 & 50-441/85-13 on 850428-0531.No Violation or Safety Significant Matters Noted.Major Areas Inspected:Two Previous Allegations,Instrumentation Cables & Terminations & Plant Tours IR 05000530/19850161985-06-10010 June 1985 Insp Rept 50-530/85-16 on 850513-17 & 28-30.No Violations or Deviations Noted.Major Areas Inspected:Steel Structures & Supports,Reactor Coolant Loop Piping & Reactor Vessel & Internals Documentation IR 05000529/19850141985-05-0808 May 1985 Insp Repts 50-529/85-14 & 50-530/85-09 on 850325-29. Violation Noted:Welding of New Fuel Storage Racks.Deviation Noted:Procurement of New Fuel Storage Racks 1989-09-08
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000528/19990121999-06-30030 June 1999 Insp Repts 50-528/99-12,50-529/99-12 & 50-530/99-12 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000528/19990051999-04-21021 April 1999 Partially Withheld Insp Repts 50-528/99-05,50-529/99-05 & 50-530/99-05 on 990322-26 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Details Withheld ML20196D6391998-11-20020 November 1998 Notice of Violation from Insp on 981019-24.Violation Noted: Licensee Submitted Physical Security Plan Rev 40 Which Contained 10 Changes to Physical Security Plan That Decreased Safeguard Effectiveness of Plan IR 05000528/19980131998-11-20020 November 1998 Partially Withheld Insp Repts 50-528/98-13,50-529/98-13 & 50-530/98-13 on 981019-24 (Ref 10CFR73.21).Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Mgt Support,Security Audits & Plans & Procedures ML20236N0381998-07-10010 July 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:On or About 980310, Unit 3 Operators Failed to Demonstrate Operability of Operable Offsite Power Circuits IR 05000528/19970231997-10-20020 October 1997 Partially Deleted Insp Repts 50-528/97-23,50-529/97-23 & 50-530/97-23 Containing Safeguards Info (Ref 10CFR73.21) on 970922-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000528/19970081997-04-22022 April 1997 Partially Withheld Insp Repts 50-528/97-08,50-529/97-08 & 50-530/97-08 on 970317-21.Violations Noted.Major Areas Inspected:Plant Support.Portions Withheld (Ref 10CFR73.21) ML20138C1071997-04-22022 April 1997 Notice of Violation from Insp on 970317-21.Violation Noted:Safeguards Documents Discovered Outside Protected Area Unsecured in Terminated Employee Desk IR 05000528/19960201997-01-31031 January 1997 Partially Deleted Insp Repts 50-528/96-20,50-529/96-20 & 50-530/96-20 on 961007-11 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Licensee Vehicle Barrier Sys Program Utilizing Ti 2515/132,dtd 960118 IA-98-273, Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant1994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20236U9511994-05-11011 May 1994 Partially Deleted Investigation Rept 5-93-023R.No Noncompliance Noted.Investigation Conducted to Determine Whether Technician Vacancy at Plant Had Been Discriminated by Plant ML20059K7021994-01-0505 January 1994 Notice of Violation from Insp on 931102-1206.Violation Noted:On 931103,operators in Unit 1 Failed to Monitor Reactor Coolant Sys Level While Draining for Approx Eight Minutes IR 05000528/19930481994-01-0404 January 1994 Insp Repts 50-528/93-48,50-529/93-48 & 50-530/93-48 on 931102-1206.Violations Noted.Major Areas Inspected:Plant Activities,Surveillance Testing,Plant Maint,Lifting of Main Steam Safety Valve & mid-loop Operations IR 05000528/19930471993-12-16016 December 1993 Insp Repts 50-528/93-47,50-529/93-47 & 50-530/93-47 on 931108-10.No Violations Noted.Major Areas Inspected:Licensee Preparations for 940101 Implementation of Changes to 10CFR20 as Set Forth in Fr 56FR23377,dtd 910521 IR 05000528/19930491993-12-15015 December 1993 Insp Repts 50-528/93-49,50-529/93-49 & 50-530/93-49 on 931115-19.No Violations Noted.Major Areas Inspected:Reviewed Licensee Implementation of Containment LLRT Program & Licensee Actions for Open Items Identified in Insp Rept IR 05000528/19930501993-12-0202 December 1993 Meeting Repts 50-528/93-50,50-529/93-50 & 50-530/93-50 on 931115.No Violations Noted.Major Areas Discussed:Status & Schedule of EOP Rewrite Program & Assessment of Recent Operator Performance Issues IR 05000528/19930431993-11-19019 November 1993 Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted.Major Areas Inspected:Plant Activities,Engineered Safety Features Walkdowns,Surveillance Testing & Plant Maint IR 05000528/19930461993-11-17017 November 1993 Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations Noted.Major Areas Inspected:Review of ISI of ASME Code Class 1,2 & 3 Welds & Licensee Unit 1 SG Eddy Current Insp Activities IR 05000528/19930321993-11-17017 November 1993 Insp Repts 50-528/93-32,50-529/93-32 & 50-530/93-32 on 931018-22.No Violations Noted.Major Areas Inspected: Implementation of Licensee Program to Meet Commitments to GL 89-10, Safety-Related Motor-Operated Valve.. IR 05000528/19930391993-10-28028 October 1993 Insp Repts 50-528/93-39,50-529/93-39 & 50-530/93-39 on 930823-27.No Violations or Deviations Noted.Major Areas Inspected:Open Items in Emergency Preparedness Program Area ML20058D3311993-10-19019 October 1993 Notice of Violation from Insp on 930817-0920.Violation Noted:Between 911225-920113,licensee Engineer Worked More than 72 Hrs in 7 Day Period,Exclusive of Shift Turnover Time W/O Authorization by Manager ML20058D3571993-10-15015 October 1993 Insp Repts 50-528/93-40,50-529/93-40 & 50-530/93-40 on 930817-0920.Violations Noted.Major Areas Inspected:Review of Plant Activities,Engineered Safety Features Walkdowns, Surveillance Testing & Plant Maint ML20059C9811993-10-15015 October 1993 Notice of Violation from Insp on 920719-0824 & 1001-1102. Violation Noted:Licensee Determined That Records Required to Be Maintained by NRC Not Complete or Accurate in All Matl Respects IR 05000528/19930371993-10-0101 October 1993 Insp Repts 50-528/93-37,50-529/93-37 & 50-530/93-37 on 930920-24.One Unresolved Item Identified.Major Areas Inspected:Licensee Radiation Protection Program & Followup of Safety Evaluation Rept IR 05000528/19930421993-09-29029 September 1993 Insp Repts 50-528/93-42,50-529/93-42 & 50-530/93-42 on 930830-0903.No Violations Noted.Major Areas Inspected: on-site Followup of LER in Accordance W/Insp Procedure 92700, Onsite Followup of Written Repts.. IR 05000528/19930361993-09-22022 September 1993 Insp Repts 50-528/93-36,50-529/93-36 & 50-530/93-36 on 930830-0903.Non-cited Violation Identified.Major Areas Inspected:Review of Licensee Access Authorization Program PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled1993-09-22022 September 1993 PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled ML20057E7301993-09-16016 September 1993 Notice of Violation from Insp on 930713-0816.Violation Noted:Emergency Operating Procedures Used to Identify & Mitigate SG Tube Rupture Were Inadequate ML20057E7451993-09-10010 September 1993 Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Violations Noted.Major Areas Inspected:Plant Chemistry,Fire Protection,Security & Outage Operations ML20058H4231993-09-10010 September 1993 Errata to Insp Repts 50-528/93-35,50-529/93-35 & 50-530/93-35 on 930713-0816.Provides Omitted Signature Page & Attachments IR 05000528/19930291993-09-0909 September 1993 Insp Repts 50-528/93-29,50-529/93-29 & 50-530/93-29 on 930621-0709.Violations Noted.Major Areas Inspected:External Exposure Control,Internal Exposure Control,Control of Radioactive Materials & Rms ML20057C5941993-09-0909 September 1993 Notice of Violation from Insp on 930621-0709.Violation Noted:Despite Licensee Chemistry Manager Receipt of from Combustion Engineering Identifying Potential for Dilution of Sample,Licensee Failed to Establish Measures IR 05000528/19930331993-09-0303 September 1993 Insp Repts 50-528/93-33,50-530/93-33 & 50-530/93-33 on 930802-06.No Violations Noted.Major Areas Inspected:Failure Rate of Crews & Operators During Sept 1992 & Mar 1993 Requalification Exams PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power1993-08-30030 August 1993 PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power IR 05000528/19930271993-08-26026 August 1993 Insp Repts 50-528/93-27,50-529/93-27 & 50-530/93-27 on 930726-30.No Violations Noted.Major Areas Inspected:Water Chemistry & Radiochemistry Programs,Including Water Chemistry & Health Physics Confirmatory Measurements PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee1993-08-11011 August 1993 PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee IR 05000528/19930241993-08-0606 August 1993 Page 27 Inadvertently Omitted from NRC Inspection Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 ML20056E3691993-07-29029 July 1993 Insp Repts 50-528/93-24,50-529/93-24 & 50-530/93-24 During Wks of 930524,0607 & 28.No Violations Noted.Major Areas Inspected:Corrective Actions for Previously Identified Followup & Enforcement Items & LER Followup ML20056C8451993-07-0101 July 1993 Notice of Violation from Insp on 930426-0514.Violation Noted:Sgtr Event Involving RCS Leakage Greater than 44 Gpm & Previous Condition Involving RCS Leakage Greater than Charging Pump Capacity,Not Classified as SAE ML20056C8501993-07-0101 July 1993 Notice of Violation from Insp on 930427-0531.Violation Noted:Licensee Failed to Meet Surveillance Requirements for Testing Snubbers in Plants IR 05000528/19930281993-06-30030 June 1993 Enforcement Conference Repts 50-528/93-28,50-529/93-28 & 50-530/93-28 on 930603.Violations Noted.Major Areas Inspected:Licensee Analyses of Several Apparent Violations of NRC Requirements Re Emergency Classification ML20056C8511993-06-30030 June 1993 Insp Repts 50-528/93-12,50-529/93-12 & 50-530/93-12 on 930427-0531.Violations Noted.Major Areas Inspected:Review of Plant Activities,Emergency Operating Procedures,Surveillance Testing,Plant Maint,Snubber Testing & Core Reload Analysis PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined1993-03-25025 March 1993 PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined IR 05000528/19920411993-01-13013 January 1993 Insp Repts 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted.Major Areas Inspected: Review of Plant Activities,Surveillance Testing & Plant Maint IR 05000528/19920381992-12-22022 December 1992 Insp Repts 50-528/92-38,50-529/92-38 & 50-530/92-38 on 921026-30 & 1116-20.Violations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Surveys & Occupational Exposure During Unit 3 Refueling Outage ML20127B0961992-12-22022 December 1992 Notice of Violation from Insp on 921026-30 & 1116-20. Violation Noted:On 921110,procedures Were Not Adhered to in That Survey Not Performed or Documented to Illustrate Impact of Cumulative Dose Rates ML20126E0241992-12-0808 December 1992 Notice of Violation from Insp on 921005-09.Violation Noted: Licensee Lost All Meteorological Instrumentation for Approx 7 H But Failed to Declare Unusual Event within 30 Minutes of Loss of Instrumentation on 920822 IR 05000528/19920341992-12-0808 December 1992 Insp Repts 50-528/92-34,50-529/92-34 & 50-530/92-34 on 921005-09.Violations Noted.Major Areas Inspected:Status of Emergency Preparedness Program & Followup on Open Items ML20126B9031992-12-0404 December 1992 Notice of Violation from Insp on Stated Date.Violation Noted:Boric Acid Make Up Pump Discharge Check Valves CHN-V154 & CHN-155 Were Not in Licensee IST Program & Were Not Being Tested Individually IR 05000528/19920361992-12-0404 December 1992 Insp Repts 50-528/92-36,50-529/92-36 & 50-530/92-36 on Stated Dates.Violations Noted.Major Areas Inspected:Ist of Check Valves in safety-related Sys & Performance of Unit 3 ISI 1999-06-30
[Table view] |
Inspection Report - - 2006029 |
---|
|
|
Text
.
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report No /85-17, 50-529/85-19, and 50-530/85-13 Docket No , 50-529, and 50-530 License N NPF-34 Construction Permit Nos. CPPR-142 and 143 Licensee: Arizona Nuclear Power Project Post 0ffice Box 52034 Phoenix, Arizona 85072-2034 Facility Name: Palo Verde Nuclear Generating Station Unit Nos. 1, 2, and Inspection Conducted: Apr,il 8 - J 1e 29, 1985
'
Inspectors: 1 7'[ f-b G. U ernandez. Sen Resident Inspector Date Signed h '
~/- l 9 -lb^
J . R' Ball, Res' ent Inspector Date Signed Approved By: 7-/f-75 L(/ F. Miller, Chief Date Signed Reactor Projects Section No. 2 Summary:
Inspection from April 28 - June 29, 1985 (Report Nos. 50-528/85-17, 50-529/
85-19 and 50-530/85-13).
Areas Inspected: A routine, onsite inspection by the Construction Resident Inspectors of activities related to the as-built configuration and documenta-tion of the Unit 2 Main Steam Supply System, observation of Unit 2 work activities related to safety related components and piping, review of quality records related to safety related components, investigation of Allegation N RV-85-A-006 and close out of NRC Temporary Instruction No. 2512/1 The following I.E. Manual Chapters were utilized during this inspection:
Module Nos. 37501, 49065, 50074B, 50075B and 5007 The inspection involved 468 inspector hours on site by two NRC Resident Inspector Results: In the areas inspected, no deviations or violations of NRC require-ments were identifie %6 G
P
. l
.
DETAILS t i
1. Persons Contacted Arizona Nuclear Power Project (ANPP)
E. E. Van Brunt, Jr., Executive Vice President J. G. Haynes, Vice President, Nuclear Production D. B. Karner, Assistant Vice President, Nuclear Production
- J. R. Bynum, Plant Manager W. E. Ide, Corporate Quality Assurance Manager D. B. Fasnacht, Nuclear Construction Manager W. F. Quinn, Licensing Manager A. C. Rogers, Nuclear Engineering Manager
- L. A. Souza, Assistant Corporate Quality Assurance Manger
- C. N. Russo, Quality Assurance-Audits / Monitoring Manager D. E. Fowler, Quality Control Manager T. A. Shriver, Quality Systems Engineering Manager R. J. Burgess, Field Engineering Supervisor S. G. Penick, Quality Assurance Monitoring Supervisor J. C. Sherrin, Quality Document Review Group Supervisor A. T. Ramey, Quality System Supervisor r K. R. Daley, Quality Assurance Engineer M. L. Provost, Quality Assurance Engineer
- W. W. Montefour, Quality Assurance Engineer D. M. LeBoeuf, Quality Assurance Engineer H. L. Green, Quality Assurance Engineer W. J. Gratza, Quality Assurance Engineer
- T. J. Bloom, Licensing Enginear Bechtel Power Corporation (Bechtel)
W. J. Stubblefield, Project Manager S. M. Nickell, Project Superintendent W. G. Bingham, Project Engineering Manager
- J. L. Black, Chief Resident Engineer T. L. Horst, Project Field Engineer
- D. R. Hawkinson, Project Quality Assurance Manager
- H. A. Foster, Project Quality Control Engineer H. A. Hear, Assistant Project Quality Control Engineer J. Waddington, Assistant Project Quality Control Engineer R. Ruff, Lead Electrical / Instrumentation Quality Control Engineer G. Griffin, Lead Civil Quality Control Engineer :
- W. A. Miller, Construction Engineer >
- W. P. Murphy, Project Superintendent The Waldinger Corporation (TWC)
R. R. Strait, Project Engineer
- Denotes personnel attending the NRC Exit Management Meeting conducted on June 28, 1985.
- _ _ _ _ _ _ _ _ _ _ _ _ _-_ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ - _ _ _
- . - .- - . ..
.
1 2 s
The inspectors also talked with other licensee and contractor personnel
during the course of the inspectio . Plant Status Unit One: Testing is in progress with Unit I at the 20% power plateau.
'
Unit Two: Unit 2 is undergoing precore Hot Functional Testing. Fuel Load for Unit No. 2 is scheduled for December 198 Unit Three: All major components and equipment have been installe ,
Unit 3 has a scheduled fuel load date of March 1987, i
Construction completion of Unit 3 is estimated at 95% by l the license . Review of As-Builts - Unit No. 2 As-Built Verification This inspection compared the as-built condition of portions of the Unit No. 2 Main Steam Supply System, with design, installation and quality assurance document Areas Reviewed: Piping System Installation I
'
The following documents and areas were reviewed: piping and instrumentation diagrams, piping and instrument sensing line plans and isometrics, large and small pipe installation control cards, valve installation records and completed construction inspection plans for instrumentation installations. The physical inspection of the piping and sensing line runs includ-ed location, size and configuration, support type and location,
,
and valve location and orientation. The installation of the l
following pipe spools and associated pipe supports (totaling approximately 300 feet of piping for the Main Steam Supply System located in the MSSS Building) was examined:
i Pipe Spool Numbers Description
.
'
2-SGE-206-S001 28" Main Steam Line 2-SGE-207-S001 28" Main Steam Line 2-SGE-208-S001 28" Main Steam Line 2-SGE-209-S001 28" Main Steam Line l 2-SGE- 95-S003 through S006 4" Main Steam Bypass Line i 2-SGE-100-S003 through S006 4" Main Steam Bypass Line 2-SGE-192-N00A through NOOD and NOAA 1" Main Steam Line
- Drain )
i
'
2-SGE-194-N00A through NOOD and NOAA 1" Main Steam Line Drain i
l
J
. ._ _ .- --- - -- . . . _ . .
.
'
The installation of the following valves was examined:
Valve Numbers Description 2JSGE-UV-170, 171, 180, 181 Main Steam Isolation Valvea
.2JSGE-UV-169 and-183 Main Steam Isolation
., Bypass Valves 2JSGE-UV-ll35A and B Main Steam Drain
,
Isolation Valves j 2JSGE-PSV-554 through 561, 572 Main Steam Safety j through 579, 691, 692, 694 and 695 Relief Valves The installation of sensing lines for the following instruments l was also examined:
Instrument Tag Number Description 2JSGA-PT-1023A Steam Generator #2 Pressure -Channel A 2JSGB-PT-1023B Steam Generator #2 Pressure -Channel B 2JSGC-PT-1023C Steam Generator #2 Pressure -Channel C l 2JSGD-PT-1023D Steam Generator #2 Pressure -Channel D 2JSGB-LT-1023B Steam Generator #2 Wide Range Level-Channel B
.
2JSGB-LT-1024B Steam Generator #2 Narrow Range Level ;
i-Channel B 2JSGD-LT-1123D Steam Generator #2 Wide Range Level-Channel D
! 2JSGD-LT-1124D Steam Generator #2 Narrow Range Level j -Channel D I No deviations or violations of NRC requirements were identified.
, Electrical System Installation
{
j The following documents and areas were reviewed: elementary and I i cable block diagrams, instrument loop diagrams, cable code and '
{ cable scheme numbers, single line diagrams, cable type and identification, including separation color and cable markers
'
i 580 computer program sorts for routing, identification of
! cables at tray points, and size and type of cable, physical separation criteria, including raceway and tray designations, conduit and tray arrangement drawing, raceway installation cards, cable installation cards, and cable installation spec-
- ifications. The physical inspection of the cable runs included a determination of size, type, routing, protection, separation, identification, loading, cable supports and cable spacing. The
.
actual cable installation and routing was compared to the l design as determined from the E580 computer program and the
,
cable installation card ,
I The installation of the following power, control and instrument cables for the Main Steam Supply System were examined:
.
.
.
1 .
i Cables Equipment / Instrument To Location i 2ESG23ACIRD Main Steam Isolation Valve Main Steam and
, (MSIV) 2JSGE-UV-170 Feedwater Isola 2ESG23AC2RD MSIV 2JSGE-UV-171 tion Actuation 2ESG23AC3RD MSIV 2JSGE-UV-180 System (MSFIS)
l 2ESG23AC4RD MSIV 2JSGE-UV-181 Cabinet 2JSGAC01 2ESG23BCIRD Main Steam Isolation Valve Main Steam and (MSIV) 2JSGE-UV-170 Feedwater Isola-
'
2ESG23BC2RD MSIV 2JSGE-UV-171 tion Actuation 2ESG23BC3RD MSIV 2JSGE-UV-180 System (MSFIS)
2ESG23BC4RD MSIV 2JSGE-UV-181 Cabinet 2JSGBC01
2ESG23AC MSFIS Containment Engineered Safety l 1 to 4 RG 2JSGAC01 Features Actuation (ESFAS) Auxiliary Relay Cabinet 2JSAAC01 2ESG23BC MSFI Containment ESFAS Auxiliary 1 to 4 RG 2JSGBC01 Relay Cabinet i 2JSABC01 2ESG58ACI XA MSIV 2JSGE-UV-170 instrument Cabinet and XE Accumulator Pressure ZJA-C02B
'
A-PT-229
"
2ESG58ACI XA MSIV 2JSGE-UV-171 Accumulator Pressure i A-PT-233
"
2ESG58ACI XB MSIV 2JSCE-UV-180 Accumulator Pressure A-PT-231
"
.
2ESGS8AC2 XB MSIV 2JSGE-UV-181 and XF Accumulator Pressure i
A-PT-235
! 2ESG72BC1 XA MSIV 2JSGE-UV-170 Instrument Cabinet and XE Accumulator Pressure ZJB-C02A
,~
A-PT-230
"
2ESG72BC2 XA MSIV 2JSCE-UV-171 and XE Accumulator Pressure A-PT-234
"
2ESG72BC1 XB MSIV 2JSGE-UV-180 and XF Accumulator Pressure A-PT-232
"
2ESG72BC2 XB MSIV 2JSGE-UV-181 and XF Accumulator Pressure A-PT-236 2ESG63DCl XA Steam Generator #1 Electrical Pene-and XB Pressure Channel D- tration Assembly D-PT-1013D 2ESPDZ771
,
l I
L _-___-_
___
)
-
-
,5
"
2ESG63DCI XA Steam Generator #2 and XB Pressure Channel D-D-PT-1023D No deviations or violations of NRC requirements were identifie Applicable Specifications and Procedures The following specifications and Work Plan procedures / Quality Control Procedures (WPP/QCI) governing the installation of piping, instrumentation and electrical cables were reviewed during this inspection:
. 13-PM-204 Specification for Field Fabrication and Installation of Nuclear Piping Systems
. WPP/QCI 202.0' Piping-Systems Installation
. 13-EM-300 Installation Specification for Electrical Cables in Cable Trays
. 13-EM-301 Installation Specification for Electrical Cables in Conduit and Duct Banks
. 13-EM-303 Installation Specification for Electrical Cables and Raceway Identification
. WPP/QCI 251.0 Raceway Installation
.
WPP/QCI 254.0 Cable Installation
. 13-JM-702 Installation Specification for Electrical Instruments and Controls WPF/QCI 302.0 Instrument Installation
.
WPP/QCI 2 Field Change Request
.
WPP/QCI 2 Design Change Package No deviations or violations of NRC requirements were identifie Findings The inspector reviewed three design change packages (DCP's) as they related to documenting the as-built condition of the plan The following DCP's were reviewed:
DCP 2SMSG-069 Installation of Additional Main Steam Line Drain Lines DCP 2SJSB-021 Revised Condensate Pot Installation for Safety-Related Instrument Sensing Line DCP 2SESB-033 Cable Splices inside Containment Penetrations for Post-Accident Monitoring Instrumentation The inspector'found the as-built condition of the plant did reflect the implementation of the approved changes. The inspector noted, however, that DCP 2SMSG-069 had not been reviewed by the Project Quality Assurance Engineer prior to its implementation as require The change did affect safety-related piping and instrumentation .
diagrams. The licensee informed the inspector that this problem had )
been previously identified and corrective action was
.
.
currently being taken under Corrective Action Request (CAR)
PVH52/85-09A dated April 22, 1985. The inspector stated that this corrective action appeared adequate to resolve this discrepanc The inspector also reviewed nonconformance reports (NCR's) and field change request (FCR's) as they related to documenting the as-built condition of the plant. Note 10 of piping isometric 13-P-SGF-155 required specific clearances be maintained around the main steam isolation valves to accommodate the thermal and seismic movements of these valves. FCR 85463-C dated November 9, 1984, was written to notch a W12x40 structural beam which was found to interfere with the movement of main steam isolation valve 2JSGE-UV181. Startup Field Report (SFR) number 25G-6014 was written May 24, 1985, and indicated that the interference still existed. FCR 91167-M was written to increase the size of the notches to alleviate this proble Although the interference problem was eventually resolved satisfactorily, the licensee failed to document this problem using a nonconformance report. This should have been done since the installation of the valve had been accepted by Quality Control on September 9, 1983, as having been installed in accordance with piping isometric 13-P-SGF-155. The use'of FCR's in lieu of NCR's has been previously addressed in NRC inspection report 50-528/84-3 The inspector reviewed the current status of the licensee's actions relating to a commitment made by the licensee to assess the current use of FCR's and the effectiveness of past corrective action (Re Followup Item 50-528/84-39-01). Corrective Action Request, CAR PVH 4/84-26A was written December 14, 1984, and addresses this concern over the current use of FCR's. As of this report, the above CAR l remained open awaiting additional investigation into the extent of '
this problem and definition of corrective: action which may'still be required. Followup item 50-528/84-39-01 remains open until the licensee has completed act-ions relate'dt to close out of this CA ; ., w *
No deviations or violations of'NRCirequirements were4 identifie . Safety Related Components - Unit No. 2 ;
~ '- -
s Observation of Work and Work Activities'
The inspector observed completed work on nine components within the reactor coolant pressure boundary and on four components located outside the_ reactor coolant pressure boundary. The inspection determined that the components selected met the applic'able require-ments for storage, handling, installation and protection after installation. The following components were selected: Reactor Coolant Loop Piping and Valves.
,
Valve Number Loop Number Serial Number o 2PCHEV431 009 28632 o 2PCHVAM41 520 4903AAL o 2JCHAHV205 520 4 o 2JCHBHV203 521 3 s
{
'31,
-
_
,
.
Piping Subassembly o 2CH009N00A-0 o 2CH520N00A-1 o 2CH520N00B-1 o 2CH520N00C-0 o 2CH520N00A-5 Other Safety System Components Valve Number Line Number Serial Number o 2JCHAHV524 2CH-003 26978 o 2PCHEVM70 2CH-015 74379 o 2PCHEVM76 2CH-015 NAK-62 o 2PCHBV331 B259 51321 No deviations or violations of NRC requirements were identifie Review of Quality Related Records The inspector reviewed the pertinent records for these safety related components to assure that the records reflected work accomplishment consistent with NRC requirements and SAR commitment The inspector reviewed the following records for each of these component o Code Data Packages o Construction Inspection Plans (CIP)
o Nonconformance Reports (NCR)
o Modification Change Notices (MCN)
o Certified Material Test Reports (CMTR)
o Field Change Requests (FCR)
o NDE Reports o Torquing Sheets o Records of Internal Cleanliness Checks o Receipt Inspection Records o Storage Inspection Records No deviations or violations of NRC requirements were identifie Review of Quality Assurance Audits Three of the licensee's most recent audits associated with safety related components were reviewe The following audits were
!
examine o Quality Assurance Audit Report Number 84-034 l
'
o Unscheduled Project Quality- Audit Number UA-84-56 o Joint Bechtel/APS Audit Number 62-S-85-10 The audits were found to appropriately identify and resolve audit findings in accordance with the licensee's audit program.
i r
e
- - - - - -
.
No deviations or violations of NRC requirements were identified.
- Qualification of Quality Control Inspe,ctors The qualification of eight mechanical, three receiving, and nine welding Quality Control Inspectors were reviewed. The records were reviewed for education, work experience prior to certification, eye
- examinations, training received and other pertinent dat In all cases, the qualification of the inspectors met or exceeded the qualification requirements of ANSI N45.2.6-197 No deviations or violations of NRC requirements were identifie . Safety Related Piping - Unit No. 2 Review of Quality Records
,
The inspector reviewed the pertinent records for the following safety related piping components to assure that the records reflect work accom-plishment consistent with NRC requirement and SAR commitment Drawing Number Spool Number Hanger Number 13-P-SIF-103 5005 2-SI-193-H017 13-P-SIF-105 5004 2-SI-193-H007 13-P-SIF-105 5006 2-SI-240-H007 13-P-SIF-105 5007 2-SI-240-H010 13-P-SIF-201 5007 2-SI-307-H003 13-P-SIF-201 5038 2-SI-307-H014
, 13-P-SIF-201 5001 2-CH-424-H006 13-P-SIF-201 5009 2-SI-307-H005 13-P-SIF-201 5008 2-SI-307-H006 13-P-SIF-201 5006 2-SI-307-H002 13-P-SIF-202 5002 2-CH-425-H008 13-P-SIF-202 5001 2-CH-425-H006 13-P-SIF-202 5013 2-SI-308-H010 13-P-SIF-202 5011 2-SI-308-H008 The inspector reviewed the following records for each of the above piping componen .
o Construction Installation Plans (CIP)
o Certified Material Test Reports (CMTR)
o Nonconformance Reports (NCR)
o Field Change Requests (FCR)
o Pressure Test Records o NDE Reports o Welding Field Checklist o Valve Installation Checklists o Valve Flange Torquing Data Sheets No deviations or violations of NRC requirements were identified.
,
.,- - . - . - , ~ . , -- -.v.v ---m,-- -
, ~ , , , -. , , - , , ,
.
6. Allegation No. RV-85-A-006 (0 pen)
l l Cha racterization:
On January 22, 1985, an alleger contacted the NRC Resident Inspector's office by telephone and related the following concerns:
1) During installation of the 42" Containment Purge Valves, the valves were found to exhibit rust damage due to improper storage.
I 2) During installation of a Unit No. 2 Heating, Ventilating and Air Conditioning (HVAC) safing plate, the plate was cut without obtain-ing the proper reviews and approval On May 30, 1985, the alleger called the NRC Resident Inspector's office and related a number of concerns including that he believed that HVAC pressure tests had been falsifie Implied Safety Significance to Plant Design, Construction or Operations:
The failure of the 42" Containment Purge valves to function as designed could cause the 10 CFR Part 100 limits to be exceeded during accident conditions. The failure to obtain the proper engineering approvals prior to cutting of the HVAC safing plate could effect the proper function of the components and may indicate a problem with personnel training and failure to follow procedural requirements. The failure of the HVAC system to function as design could effect the safe operation or the safe shut down of the plant during an emergenc Assessment of Safety Significance:
Containment Purge Valve Allegation In order to resolve this allegation, the inspector examined the contain-ment purge valve receipt inspection, the storage inspection, the ware-house requisition and installation records for all three units. The inspector also examined the storage requirements as specified by the manufacturer and as contained in Specification No. 13-JM-605, and examin-ed all Nonconformance Reports (NCR) written on discrepancies identified during the receipt, storage and installation activitie Additionally, because the alleger had also stated that he had called the APS Hot-line on the containment purge valves on or about June 1984, the inspector examined the APS Hot-line and Special Hot-line log books dating back to the program inception, November 17, 1982 and August 28, 1984, i respectivel l The inspector's investigation found that none of the Nonconformance Reports written against the containment purge valves during receipt, storage or installation concerned or addressed a problem with rust damage to the valves. The inspector's review of the APS Hot-line and Special Hot-line log determined that the APS Hot-line logs did not have a record of a concern regarding rust damage to the containment purge valves. On May 21, 1985, the inspector contacted the alleger to obtain further l
l
.
information on his concerns. At this time the alleger stated he had never made a phone call'.to the NRC on problems with the containment purge valves or the HVAC safing plate. The alleged alleger stated his belief that somebody had apparently used his name to discredit him with the company. This individual stated that the problem with the containment purge valves occurred over four years ago and at that time the contain-ment purge valves were requisitioned from the warehouse by Bechtel and stored next to the Waldinger lay down area for over a year. The indivi-dual reported the improper storage and rust on the valves to his super-visors. The valve problems were corrected in accordance with the licensee's procedures and the individual was satisfied with the action The inspector (to further assure that containment purge valves would function as designed), reviewed the local leak rate tests for Units 1 and The test date indicated that all valves were found to pass the leak tightness criteria as required by the FSAR. The local leak rate tests had not been performed on the Unit No. 3 containment purge valves, at the time of this inspectio HVAC Safing Plate Allegation The concern regarding the cutting of the HVAC safing plate was also alleged to be a concern of this individual, however the individual stated problem was addressed in accordance with the licensee's procedures and the individual was satisfied that everything was taken care of as re-quired by the quality progra To further assure that the problem had been handled in accordance with the licensee's program, the inspector reviewed the Nonconformance Report (Waldinger NCR No. 1068 F/II), the Bechtel Field Change Request (FCR N .254-P), and the Supplier Deviation Disposition Request (SDDR N ), which documented the craft error of trimming more of the safing plate then was allowed by the requirements. All the documents appeared to have been prepared and dispositioned in accordance with the applicable requirement HVAC Pressure Test Allegation A preliminary review of the HVAC pressure tests referred to by the alleger do not indicate that the tests were improperly performe However, the investigation into whether persons knowingly falsified the pressure tests is continuing with the aid of the NRC Office of Investigation Other Related Allegations (RV-85-A-034, RV-85-A-040) i The alleger in his May 30, 1985 phone call to the NRC made certain other '
allegations related to other licensee contractor personnel. The alleger stated that he has made Bechtel aware of all these allegations. The '
inspector confirmed that Bechtel is aware of all the allegations made by I this alleger, and is actively pursuing resolution of these allegation These allegations will be reviewed during a future inspectio ,_, ,_ _ _
_ _ . . _ ..
_ _ .
.
Staff Position The two allegations related to the containment purge valves and the HVAC safing plate are considered by the staff to be resolved, and are close The investigation into the allegations related to HVAC Pressure Tests is continuing and will be discussed in a future inspection repor The licensee is pursuing the other allegations and the NRC's conclusions regarding whether these allegations effect or impact on safety will be reported in a future inspection repor NRC Temporary Instruction (TI) 2512/11
'
1 On February 21, 1984, the NRC issued Temporary Instruction (TI) 2512/11 to increase inspection coverage in areas of nuclear plant construction found by past experience to be in-need of improved licensee performanc The areas that were targeted for increased inspection effort were Heating Ventilating and Air Conditioning (HVAC) Systems, Pipe Supports, "As-
,
built" Systems Inspections, and Craftsmen Qualifications and Training Programs. For Palo Verde, the regional and resident inspection program has performed a number of inspections in these areas. The inspection scope and results are documented as follows:
Type of Inspection: NRC Inspection Report Number:
o Pipe Supports 50-528/83-34, 84-38, 84-45 and 84-48 o HVAC Systems 50-528/83-34, 84-10, 84-21, 84-25 and 84-45 o As-built Systems 50-528/83-34, 84-38, 84-45, 84-48, 85-16 and 85-17 o Craftsmen Qualification and Training 50-528/85-02 Based on the above referenced inspection effort, Temporary Instruction (2512/11) is close No deviations or violations of NRC requirements were identified.
,
8. Inspection Tour of Site On a weekly basis, the inspector and licensee representatives tour the site to observe general housekeeping conditions, care and preservation of equipment, handling of components, tagging and identification of materia No violations or deviations with NRC requirements were identifie . Exit Interview The NRC inspectors met on June 28, 1985, with licensee management repre-sentatives denoted in paragraph 1. The scope of the inspection and inspection findings as noted in this report were discussed.