|
---|
Category:Inspection Plan
MONTHYEARML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI IR 05000528/20220062023-03-0101 March 2023 Annual Assessment Letter for Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Report 05000528/2022006, 05000529/2022006, and 05000530/2022006) IR 05000528/20224012022-09-12012 September 2022 PVNGS Units 1, 2, and 3 - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000528/2022401; 05000529/2022401; 05000530/2022401 ML22067A2292022-03-0202 March 2022 Inservice Inspection Inspection PWR Request for Information IR 05000528/20210062022-03-0202 March 2022 Annual Assessment Letter for Palo Verde Nuclear Generating Station - Units 1, 2 and 3 (Report 05000528/2021006, 05000529/2021006, and 05000530/2021006) ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information IR 05000528/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Palo Verde Nuclear Generating Station - Units 1, 2 and 3 (Report 05000528/2021005, 05000529/2021005, and 05000530/2021005) ML21245A2222021-09-0101 September 2021 Request for Information ML21237A5172021-08-10010 August 2021 Email to PV Licensee and Palo Verde Nuclear Generating Station, Units 1, 2 and 3 - Notification of Inspection of the Licensees Implementation Industry Initiative Associated with the Open Phase Condition (NRC Bulletin 2012-01) and Request Fo IR 07200044/20214012021-07-21021 July 2021 ISFSI, Information Request, Security Inspection Report 07200044/2021401 ML21200A2392021-07-20020 July 2021 Docs Request AC - AA August 2021 ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21061A3382021-02-25025 February 2021 Request for Information: Palo Verde Nuclear Generating Station, Dated December 4, 2020, Inspection Report 05000528/529/5302021001 Public Radiation Safety Inspection-5.8 ML21042B9692021-02-18018 February 2021 Notification of NRC Design Bases Assurance Inspection and Initial Request for Information ML21023A0212021-01-13013 January 2021 PVNGS PI&R Request for Information RA ML21011A1972021-01-12012 January 2021 Unit 2, and Unit 3 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012) and Request for Information IR 05000528/20200052020-09-0101 September 2020 Updated Inspection Plan for Palo Verde Nuclear Generating Station Units 1, 2, and 3 (Reports 05000528/2020005, 05000529/2020005, and 05000530/2020005) ML20238B9552020-08-25025 August 2020 Request for Information ML20213C7002020-07-31031 July 2020 PVNGS Security Team Inspection Docs Request 2020411 ML20183A1902020-07-0101 July 2020 Notification of Inspection (NRC Inspection Report 05000528/2020004, 05000529/2020004, 05000530/2020004) and Request for Information ML20099G1002020-04-0808 April 2020 Notification of NRC Triennial Heat Sink Performance Inspection (05000528/2020002, 05000529/2020002, and 05000530/2020002) and Request for Information ML20055E1092020-03-0303 March 2020 PV2019006 Annual Assessment Letter ML19347D1062019-12-10010 December 2019 PVNGS Security Inspection Information Request 2020412 ML19331A5582019-11-27027 November 2019 Request for Information Draft ML19312A1312019-11-0808 November 2019 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000528/2020001, 05000529/2020001, and 05000530/2020001) and Request for Information IR 05000528/20190052019-08-30030 August 2019 Updated Inspection Plan for Palo Verde, Units 1, 2, and 3 Report 05000528/2019005, 05000529/2019005, and 05000530/2019005 IR 05000528/20180062019-03-0404 March 2019 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2018006, 05000529/2018006, and 05000530/2018006) ML18274A1922018-10-0101 October 2018 Notification of NRC Triennial Heat Sink Performance Inspection (05000528/2018004, 05000529/2018004 and 05000530/2018004) and Request for Information IR 05000528/20180052018-08-31031 August 2018 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2018005, 05000529/2018005, and 05000530/2018005) IR 05000528/20170062018-03-0101 March 2018 Annual Assessment Letter for Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Report 05000528/2017006, 05000529/2017006, and 05000530/2017006) IR 05000528/20180072017-10-25025 October 2017 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Notification Of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2018007; 05000529/2018007; 05000530/2018007) And Request For Information ML17298B5612017-10-25025 October 2017 Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000528/2018007; 05000529/2018007; 05000530/2018007) and Request for Information IR 05000528/20170052017-08-28028 August 2017 Updated Inspection Plan (Report 05000528/2017005, 05000529/2017005, and 05000530/2017005) ML17243A3552017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 IR 05000528/20160062017-03-0101 March 2017 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (Report 05000528/2016006, 05000529/2016006, and 05000530/2016006) ML16336A8322016-12-0101 December 2016 Notification of Evaluations of Changes, Tests, and Experiments, & Permanent Plant Modifications Inspection (05000528/2017007; 05000529/2017007; and 05000530/2017007) & Request for Information ML16258A0312016-09-14014 September 2016 PVNGS Units 1-3 - Notif of NRC Insp of the Implementation of Mitigation Strategies and Spent Fuel Pool Instr. Orders and Emer. Prep. Comm./Staffing/Multi-Unit Dose Assessment Plns(05000528/ 2016009;05000529/2016009;and 05000530/2016009) and IR 05000528/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2016005, 05000529/2016005 and 05000530/2016005) IR 05000528/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (NRC Physical Security Inspection Report Numbers 05000528/2016401, 05000529/2016401, and 05000530/2016401) ML16237A0572016-08-31031 August 2016 Mid-Cycle Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2, and 3(report 05000528/2016005, 05000529/2016005 and 05000530/2016005) IR 05000528/20150062016-03-0202 March 2016 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (05000528/2015006, 05000529/2015006, and 05000530/2015006) ML15264B1522015-09-21021 September 2015 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000528; 05000529; and 05000530/2015008) and Request for Information IR 05000528/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Palo Verde Nuclear Generating Station, Units 1,2,and 3 (Report 05000528/2015005, 05000529/2015005 and 05000530/2015005) 2024-08-28
[Table view] Category:Letter
MONTHYEARML24312A3152024-11-0505 November 2024 Independent Spent Fuel Storage Installation - Updated Annual Radioactive Effluent Release Report 2023 ML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 2024-09-27
[Table view] |
Text
rch 4, 2003
SUBJECT:
ANNUAL ASSESSMENT LETTER - PALO VERDE NUCLEAR GENERATING STATION (REPORT 50-528/03-01; 50-529/03-01; 50-530/03-01)
Dear Mr. Overbeck:
On February 6, 2003, the NRC completed its end-of-cycle plant performance assessment of the Palo Verde Nuclear Generating Station. The end-of-cycle review for Palo Verde involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, Palo Verde operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2004.
The enclosed inspection plan details the inspections scheduled through March 31, 2004. In addition to the normal baseline inspections, the schedule contains some additional inspection associated with our review of your Unit 2 steam generator replacement activities. We also plan to conduct Temporary Instruction 2515/150, Revision 1, "Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles," on Units 1 and 2 to confirm satisfactory implementation of NRC Bulletin 2002-02. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the midcycle review meeting.
As you are aware, since the terrorist attacks on September 11, 2001, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness. We have conducted inspections to review your implementation of these
Arizona Public Service Company -2-requirements and have monitored your actions in response to changing threat conditions. For calendar year 2003, we plan to continue these inspections and conduct portions of the security baseline inspection program, as well as perform additional inspections to evaluate your compliance with new requirements that may be ordered. Based on our final determinations in this regard, we will notify you of any inspection plan changes.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8137 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Linda Joy Smith, Chief Project Branch D Division of Reactor Projects Dockets: 50-528 50-529 50-530 Licenses: NPF-41 NPF-51 NPF-74 Enclosure:
Palo Verde Nuclear Generating Station Inspection/Activity Plan cc w/enclosure:
Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, Arizona 85007 Douglas K. Porter, Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, California 91770
Arizona Public Service Company -3-Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, Arizona 85003 Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, Arizona 85072-2034 Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, Arizona 85004 Terry Bassham, Esq.
General Counsel El Paso Electric Company 123 W. Mills El Paso, Texas 79901 John W. Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, California 90051-0100 John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, New Mexico 87107-4224 Jarlath Curran Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. DIN San Clemente, California 92672
Arizona Public Service Company -4-Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, Arizona 85251 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Michael Austin, Director Arizona Division of Emergency Management 5636 East McDowell Road Building 101 Phoenix, Arizona 85008-3495 Federal Emergency Management Agency Jeff Griffin, Regional Director 1111 Broadway, Suite 1200 Oakland, California 94607-4052 Mayor Ron Drake 525 North Central Avondale, Arizona 85323 Mayor Dustin Hull 100 North Apache Road Buckeye, Arizona 85326 Mayor Jose Delgado P.O. Box 26 El Mirage, Arizona 85335 Mayor Elaine Scruggs 5850 West Glendale Avenue Glendale, Arizona 85301 Mayor William Arnold 119 North Litchfield Road Goodyear, Arizona 85338 Mayor J. Woodson Thomas 244 West Wigwam Blvd.
Litchfield Park, Arizona 85340
Arizona Public Service Company -5-Mayor John Keegan 8401 West Monroe Street Peoria, Arizona 85345 Mayor Skip Rimsza 200 West Washginton Phoenix, Arizona 85007 Mayor Joan Shafer 12425 West Bell Road Surprise, Arizona 85374 Mayor Adolfo Gamez 9555 West Van Buren Street Tolleson, Arizona 85353 Mayor Daphne Green 12030 Clubhouse Square Youngtown, Arizona 85363 Institute of Nuclear Power Operations (INPO)
700 Galleria Parkway SE Atlanta, Georgia 30339-5943
Arizona Public Service Company -6-Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (ATH)
DRS Director (DDC)
Resident Inspector (GXW2)
Branch Chief, DRP/D (LJS)
Project Engineer, DRP/D (ELC1)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
V. L. Dricks, PAO (VLD)
W. A Maier, RSLO (WAM)
C. J. Gordon (CJG)
DRS Branch Chiefs (TWP, ATG, CSM)
W. D. Travers, EDO (WDT)
C. A. Carpenter, Chief, NRR/DIPM/IIPB (CAC)
R. K. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)
R. W. Borchardt, Associate Dir. for Inspection and Programs (RWB1)
B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
S. Morris, Acting Chief, Regional Operations Staff, OEDO (SAM1)
H. Berkow, NRR Project Director (HNB)
S. Dembek, Chief, Section 2, NRR/DLPM (SXD)
J. Donohew, NRR Project Manager (JND)
RidsNrrDipmlipb S:\DRP\DRPDIR\EOC 2003\Assessment Letters\PV.wpd RIV:C:DRP/D D:DRS D:DRP Signature LJSmith;df;vlh DDChamberlain ATHowell LJSmith
/RA/ /RA/ /RA/ /RA/
2/28/03 2/28/03 3/2/03 3/3/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Page 1 of 2 Palo Verde 03/05/2003 07:37:23 Inspection / Activity Plan Report 22 03/02/2003 - 03/31/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB-EP1 - EP EXERCISE INSPECTION 3 1, 2, 3 IP 7111401 Exercise Evaluation 03/10/2003 03/14/2003 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/10/2003 03/14/2003 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 03/10/2003 03/14/2003 Baseline Inspections EMB - ISI INSPECTION U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 04/14/2003 04/25/2003 Baseline Inspections 2515/150 - PWR RPV HEAD CRACKING - BULLETIN 2002-02 1 3 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 04/14/2003 04/18/2003 Safety Issues EMB - BIENNIAL MR INSPECTION 1 1, 2, 3 IP 7111112B Maintenance Effectiveness 04/28/2003 05/02/2003 Baseline Inspections EMB - TRIENNIAL FIRE PROTECTION 5 1, 2, 3 IP 7111105T Fire Protection 06/16/2003 06/20/2003 Baseline Inspections 1, 2, 3 IP 7111105T Fire Protection 06/30/2003 07/04/2003 Baseline Inspections OB-IN - INITIAL EXAM PREP 3 1 X02249 PALO VERDE - UNIT 1 EXAM (07/03) 07/07/2003 07/11/2003 Not Applicable 2 X02250 PALO VERDE - UNIT 2 EXAM (07/03) 07/07/2003 07/11/2003 Not Applicable 3 X02251 PALO VERDE - UNIT 3 EXAM (07/03) 07/07/2003 07/11/2003 Not Applicable OB-IN - INITIAL EXAMS 4 1 X02249 PALO VERDE - UNIT 1 EXAM (07/03) 07/21/2003 07/25/2003 Not Applicable 2 X02250 PALO VERDE - UNIT 2 EXAM (07/03) 07/21/2003 07/25/2003 Not Applicable 3 X02251 PALO VERDE - UNIT 3 EXAM (07/03) 07/21/2003 07/25/2003 Not Applicable SGR-P - U-2 SG REPLACEMENT PREP ACTIVITIES 1 2 IP 50001 Steam Generator Replacement Inspection 08/01/2003 09/20/2003 Other Routine PSB-S1 - SECURITY BASELINE INSPECTION 1 1, 2, 3 IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizati 09/08/2003 09/12/2003 Baseline Inspections 1, 2, 3 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Stra 09/08/2003 09/12/2003 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 09/08/2003 09/12/2003 Baseline Inspections SGR2 - U-2 SG REPLACEMENT INSPECTIONS 1 2 IP 50001 Steam Generator Replacement Inspection 09/26/2003 12/27/2003 Other Routine ACCESSPI - ACRSA/PI 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 10/06/2003 10/10/2003 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 10/06/2003 10/10/2003 Baseline Inspections TI -150 - PWR RPV HEAD CRACKING- BULLETIN 2002-02 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 10/13/2003 10/17/2003 Safety Issues This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Palo Verde 03/05/2003 07:37:23 Inspection / Activity Plan Report 22 03/02/2003 - 03/31/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EMB - ISI & SG INSPECTIONS U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/13/2003 10/17/2003 Baseline Inspections 2 IP 7111108P Inservice Inspection Activities - PWR 11/03/2003 11/07/2003 Baseline Inspections ALARA2 - ALARA 1 1, 2, 3 IP 7112102 ALARA Planning and Controls 11/17/2003 11/21/2003 Baseline Inspections PSB-EP1 - EP PROGRAM INSPECTION 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 02/02/2004 02/06/2004 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 02/02/2004 02/06/2004 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/02/2004 02/06/2004 Baseline Inspections 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/02/2004 02/06/2004 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 02/02/2004 02/06/2004 Baseline Inspections EMB - SAFETY SYS. DESIGN AND PERF. CAPABILITY 4 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 03/01/2004 03/05/2004 Baseline Inspections 1, 2, 3 IP 7111121 Safety System Design and Performance Capability 03/15/2004 03/19/2004 Baseline Inspections EMB - CHANGES, TESTS & EXPERIMENTS 1 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/01/2004 03/05/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.