Discusses Insp Repts 50-352/96-04 & 50-353/96-04 on 960507- 0701 & Forwards Notice of Violation
ML20129D642
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/17/1996
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20129D648 List:
References
EA-96-209, NUDOCS 9610250097
Download: ML20129D642 (5)


Text

-._- ..

,

1-  :

"

!'

, *; f nouq fi._ g UNITED STATES

{ g NUCLEAR REGULATORY COMMISSION

,

% REGloN I '

,

j i[E . 475 ALLENDALE ROAD KING oF PRUSSIA, PENNSYLVANIA 19406 1415

          • ,e I October 17, 1996 EA 96-209 i
Mr. D. M. Smith, President I i PECO Nuclear ,

{ Nuclear Group Headquarters  !

Correspondence Control Desk Post Office Box 195

'

Wayne, Pennsylvania 19087-0195 SUBJECT: NOTICE OF VIOLATION

'

(NRC Inspection Report Nos. 50 352/96-04; 50-353/96-04)

Dear Mr. Smith:

This letter refers to the NRC inspection conducted from May 7 through July 1,1996, at your Limerick Generating Station facility. The findings of the inspection were discussed with your staff during an exit meeting on July 3,1996. During the inspection, the inspectors reviewed the circumstances surrounding the substantial accumulation of debris on the Unit i "A" RHR pump suppression pool suction strainer which had been identified by your staff after an inadvertent actuation of a Unit 1 safety relief valve (SRV) that had opened and caused the reactor coolant system to depressurize on September 11,1995. Approximately 30 minutes after the event, an RHR pump, which had been operating in the suppression pool cooling mode of operation,  ;

showed signs of cavitation. Subsequent underwater inspection indicated that the cavitation was caused by a collection of fibrous material and corrosion products on the pump's suction strainers.

Based on a review of the event and its associated causes, a violation of NRC requirements was identified involving the failure to establish adequate controls for excluding foreign material from the Unit 1 suppression pool. The violation was described in the NRC inspection report sent to you with our letter, dated Juiy 30,1996. In that letter, you were informed that this apparent violation was being considered for escalated enforcement and that a predecisional enforcement conference may not be necesdary in order for the NRC to make an enforcement decision. In your response, dated August 29,1996, you agreed that a conference was not needed and you described your corrective actions in that response.

The violation, which is also set forth in the enclosed Notice of Violation, involved the failure to comply with 10 CFR Part 50, Appendix B, Criterion V, " Instruction, Procedures, and Drawings,"

which requires that activities affecting quality shall be prescribed by documented instructions, g1 procedures or drawings of a type appropriate to the circumstances. Prior to the SRV actuation \

- '

on September 11,1995, you had not established an effective instruction for a foreign materials exclusion (FME) program to ensure that the suppression pool did not contain materials which could clog the ECCS suction strainers. Specifically, the FME procedure for the suppression pool did not contain adequate cleanliness acceptance criteria, and did not p -

instructions on how to assess the effects of items dropped into the suppression pool. As a result, after the SRV opened on September 11,1995, the A RHR pump was considered

~

9610250097 961017 PDR ADOCK 05000352 0 PDR m

. _ - . -. . .. . - . . - . - - . - - . - ..

_

..

_ _ _ . _ _ _ _ _ _ . _ _ . . __ _ . _ _ _ __ . - - _ _ _ _ _ . _ _ _

_.7._

'

!

!' PECO En:rgy 2 l

t inoperable due to the accumulation of debris on its suppression pool suction strainers.

.

Therefore, this violation has been categorized at Severity Level ill in accordance with the i " General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement i Policy), NUREG-1600.

<

During your follow-up of the event, you noted that there was debris on the B RHR strainer, but to a lesser extent, and that the remaining ECCS suction strainers were essentially clean. You attributed the substantial accumulation of debris on the A RHR strainer to the significant period of time the pump had been operated in the suppression pool cooling mode of operation, compared to a much lower run time in that mode for the B RHR pump. You also concluded that the remaining ECCS strainers were essentially clean since they were operated infrequently.

Notwithstanding your contentions, the A RHR pump was significantly degraded, and the RHR system could have been inoperable or in a degraded condition for an extended period because of such debris. In addition, debris on the A suction strainer may have been due to the fact that the majority of the blowdown occurred in the vicinity of this strainer, and not due to the length of time the A system operated.

In either case, the NRC is concemed that PECO Energy was unaware that debris had accumulated in the Unit 1 suppression pool water or the suction strainers due to the inadequate Foreign Material Exclusion (FME) program and plant housekeeping programs and procedures.

Although debris was found in the Unit 2 suppression pool by your staff in February 1995, and Unit 2 was cleaned following that discovery, you were not proactive in aggressively pursuing at that time whether a similar condition existed at Unit 1. In fact, you did not perform inspection of the Unit 1 suppression pool during two maintenance outages that followed the Unit 2 suppression pool cleaning to determine if foreign material existed in the Unit 1 suppression pool.

These findings demonstrate the importance of management taking appropriate action to assure that (1) the Foreign Material Exclusion Program is appropriately implemented, and (2) your staff is proactive in evaluating adverse conditions identified at one unit to ensure degraded conditions do not exist at the other unit. It may have been fortuitous that only a limited amount of debris had collected on the other ECCS suction strainers at Unit 1. Additional debris, or lifting of other SRVs, may have rendered other systems inoperable.

In accordance with the Enforcement Policy, a base civil penalty in the amount of $50,000 is considered for a Severity Level ill violation. Because your facility has not been the subject of l escalated enforcement actions within the last 2 years, the NRC considered whether credit was warranted for Corrective Action in accordance with the civil penalty assessment process in Section VI.B.2 of the Enforcement Policy. Credit is warranted because your corrective actions were both prompt and comprehensive. Your corrective actions included, but were not limited to, >

the following: (1) cleaning the Unit 1 suppression pool; (2) testing of RHR pumps and declaring them operab;e prior to start-up; (3) implementing a program to monitor the differential pressure of the Suppression Pool suction strainers; (4) initiating FME accountability tracking during unit outages for Suppression Pool and Primary Containment; (5) sampling and trending suppression i pool water for fibrous content on a monthly basis; and, (6) providing training to planner supervisors and lead technicians on the importance of FME controls for work in the drywell and suppression pool.

.

~

PECO Energy 3 Therefore, to encourage prompt and comprehensive correction of violations, and in recognition of the absence of previous escalated enforcement action, I have been authorized, after consultation with the Director, Office of Enforcement, not to propose a civil penalty in this case.

However, it is important that you clearly understand that any future performance problems, especially involving missed opportunities to aggressively pursue a condition adverse to quality, could result in more significant enforcement action and civil penalties, a

The NRC has concluded that the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved, are already adequately addressed on the docket in LER 95-008, and your letters dated October 6,1995, November 16,1995, March 1,1996, June 10,1996, and August 29,1996.

Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additionalinformation, you should follow the instructions specified in the enclosed Notice.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, and its enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

// !

H ert J. Miller Regional Administrator Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 l Enclosure: Notice of Violation l

l

_., ._ _ . _ _ - _ .. _ _ _ . _ . _ . - . . . _ _ _ _ _ _ . - _ _ - _ _ _ _ _ . _ _ _ - _. _ _ _ - _ . . _ _ _

. -

a

.

PECO Enirgy 4

.

.' cc w/ encl:

G. Hunger, Jr., Chairman, Nuclear Review Board and Director - Licensing W. MacFarland, Vice President - L!merick Generating Station

~

J. Kantner, Regulatory Engineer - Limerick Generating Station  !

Secretary, Nuclear Committee of the Board  !

4 Commonwealth of Pennsylvania i

i

,

i I

$

i b

l

,

i I

4 i

f i

!

i

!

4

$

I ,

.

,

i

.

I i

a

,

d

1

'

,

1

,

-- ,

..e-f u .

PECO Energy DISTRIBUTION:

PUBLIC SECY CA JTaylor, EDO j JMilhoan, DEDR

!

JLieberman, OE ,

>

HMiller, RI

~ FDavis, OGC WRussell, NRR

) RZimmerman, NRR l Enforcement Coordinators Rl, Ril, Rlli, RIV

'

i 1

'

.

BBeecher, GPNPA  ;

l GCaputo, Ol DBangart, OSP HBell, OlG ,

,

EJordan, AEOD l

-

OE:Chron l OE:EA i

DCS I

'

NUDOCS i I DScrenci, PAO (2) l I Nuclear Safety Information Center (NSIC)

i

i j

A

!

l j

I l

250003 1 l

l l

J