IR 05000352/2007001

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter EOC 2006 - Limerick Station (05000352-07-001 and 05000353-07-001)
ML070610599
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/02/2007
From: Mel Gray
Reactor Projects Region 1 Branch 4
To: Crane C
Exelon Generation Co, Exelon Nuclear
Gray M, RI/DRP/BR4/610-337-5209
References
IR-07-001
Download: ML070610599 (5)


Text

March 2, 2007

SUBJECT:

ANNUAL ASSESSMENT LETTER - LIMERICK GENERATING STATION (REPORT 05000352/2007001 AND 05000353/2007001)

Dear Mr. Crane:

On February 12, 2007, the NRC staff completed its performance review of Limerick Generating Station(Limerick). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.

Overall, Limerick Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct an inspection of your activities related to construction of an Independent Spent Fuel Storage Installation.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public

2 Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel Gray, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 Enclosure: Limerick Inspection / Activity Plan cc w/encl:

Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Senior Vice President - Mid-Atlantic Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear

Limerick Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2007 08:39:36 Report 22

7112101

- OCC RAD SAFETY Baseline Inspections 01/08/2007 01/12/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas

7111108G

- U2 IN-SERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007

7111108G IP Inservice Inspection Activities - BWR

7112102

- OCC RAD SAFETY Baseline Inspections 03/19/2007 03/23/2007 1, 2 7112102 IP ALARA Planning and Controls

ISFSI

- ISFSI CONSTRUCTION INSPECTION Other Routine 04/01/2007 09/30/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants

7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 05/07/2007 05/11/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment

71114

- EP PRGM INSP Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/10/2007 06/14/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/10/2007 06/14/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/10/2007 06/14/2007 1, 2 71151-EP03 IP Alert & Notification System

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 07/30/2007 08/03/2007 1, 2 7111105T IP Fire Protection [Triennial]

7111111B

- L.O.(PWR.) REQUAL. PROG. + P/F REVIEW Baseline Inspections 09/24/2007 09/28/2007 1, 2 7111111B IP Licensed Operator Requalification Program Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111111B IP Licensed Operator Requalification Program

7111401

- EP EXERCISE & PI VERIFICATION Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151-EP03 IP Alert & Notification System

12/10EXM

- INITIAL LSRO OPERATOR EXAM Not Applicable 11/19/2007 11/23/2007

U01632 LIMERICK LSRO EXAM (FY08)

Not Applicable 12/10/2007 12/14/2007

U01632 LIMERICK LSRO EXAM (FY08)

7111111B

- LSRO REQUAL AN OPTEST @PB + P/F REVIEW Baseline Inspections 11/01/2007 11/01/2007 1, 2 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Limerick Inspection / Activity Plan 01/01/2007 - 06/30/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2007 08:39:36 Report 22

7111121

- CDBI (COMPONENT DESIGN BASES INSPECTION)

Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111121 IP Component Design Bases Inspection

7112203

- PUB RAD SAFETY - REMP Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections 01/07/2008 01/11/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas

7111108G

- U1 INSERVICE INSPECTION Baseline Inspections 03/10/2008 03/14/2008

7111108G IP Inservice Inspection Activities - BWR

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112102 IP ALARA Planning and Controls

7111111B

- LSRO REQUAL INSPECTION Baseline Inspections 06/02/2008 06/06/2008 1, 2 7111111B IP Licensed Operator Requalification Program

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/02/2008 06/06/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation

71152B

- PI&R Baseline Inspections 06/09/2008 06/13/2008 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 06/23/2008 06/27/2008 1, 2 71152B IP Identification and Resolution of Problems This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

2