April 28, 2023
SUBJECT:
LIMERICK GENERATING STATION, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000352/2023001 AND 05000353/2023001
Dear David Rhoades:
On March 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Limerick Generating Station, Units 1 and 2. On April 17, 2023, the NRC inspectors discussed the results of this inspection with Michael Gillin, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Sarah H. Elkhiamy, Chief Projects Branch 4 Division of Operating Reactor Safety
Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000352 and 05000353
License Numbers:
Report Numbers:
05000352/2023001 and 05000353/2023001
Enterprise Identifier: I-2023-001-0044
Licensee:
Constellation Energy Generation, LLC
Facility:
Limerick Generating Station, Units 1 and 2
Location:
Sanatoga, PA
Inspection Dates:
January 1, 2023 to March 31, 2023
Inspectors:
A. Ziedonis, Senior Resident Inspector
L. Grimes, Resident Inspector
Approved By:
Sarah H. Elkhiamy, Chief
Projects Branch 4
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting an integrated inspection at Limerick Generating Station, Units 1 and
2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the
NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer
to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 began the inspection period at rated thermal power. On March 2, 2023, the unit entered a
planned end of cycle coastdown condition toward the end of the two-year operating cycle, which
resulted in a planned gradual slow reduction of thermal power. On March 18, 2023, the unit was
shutdown, from approximately 90 percent thermal power, for a maintenance outage to replace
the 'A' recirculation pump seal as a result of degraded conditions that were identified by the
licensee. The unit was returned to approximately 90 percent thermal power on
March 23, 2023, and continued in an end of cycle coastdown status for the remainder of the
inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed activities described in IMC 2515,
Appendix DProperty "Inspection Manual Chapter" (as page type) with input value "NRC Inspection Manual 2515,</br></br>Appendix D" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process., Plant Status, observed risk significant activities, and completed on-site portions of
IPs. The inspectors reviewed selected procedures and records, observed activities, and
interviewed personnel to assess licensee performance and compliance with Commission rules
and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following
systems/trains:
(1)
Unit 1 feedwater system during online noble chemistry injection during the week of
January 2, 2023
(2)
Unit 1 circulating water system following flooding in pump house lower level on
January 19, 2023
(3)
Unit 2 emergency diesel generator (EDG) D21 jacket water system on
January 23, 2023
71111.05 - Fire Protection
Fire Area Walkdown and Inspection (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a
walkdown and performing a review to verify program compliance, equipment functionality,
material condition, and operational readiness of the following fire areas:
(1)
Unit 1 fire area 37, 'D' core spray pump room on January 9, 2023
(2)
Unit 1 fire area 80, D13 EDG room and fuel oil and lube oil tank room on
January 17, 2023
(3)
Unit common fire outbuilding area, circulating water pump house on
January 20, 2023
(4)
Unit 2 fire area 57, high-pressure coolant injection (HPCI) pump room on
February 10, 2023
(5)
Unit 2 fire area 68, reactor building control rod drive equipment and neutron
monitoring areas on March 17, 2023
71111.06 - Flood Protection Measures
Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
(1)
Unit 1 reactor building safeguards system access area rooms 200 and 304, and core
spray pump rooms on March 29, 2023
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
(1)
Unit 1 'A' residual heat removal (RHR) heat exchanger heat transfer rate test on
January 31 and February 1, 2023
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
(1)
The inspectors observed and evaluated licensed operator performance in the control
room during a Unit 2 planned power reduction for the removal of 5B feedwater heater
from service on February 24, 2023; during a Unit 2 planned power reduction for the
removal of 5A and 5C feedwater heaters from service on March 1, 2023; during
shutdown for maintenance outage 2M57 on March 18, 2023; and during reactor
startup from 2M57 on March 22, 2023
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
(1)
The inspectors observed and evaluated licensed operator requalification training
scenarios in the simulator on February 13, 2023
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following
structures, systems, and components remain capable of performing their intended function:
(1)
Unit 2 recirculation pump 'A' seal during the week of February 21, 2023
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management (IP Section 03.01) (4 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the
following planned and emergent work activities to ensure configuration changes and
appropriate work controls were addressed:
(1)
Unit 1 risk assessment and emergent work in response to a main generator exciter
cooling service water leak during the week of January 2, 2023
(2)
Unit 1 planned action green risk during HPCI maintenance on
January 9 and 10, 2023
(3)
Unit common emergent work in response to an unplanned trip of the 'A' main control
room chiller on March 17, 2023
(4)
Unit 2 elevated risk condition due to the drywell being de-inerted during reactor start-
up and plant heat-up on March 22, 2023
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the
following operability determinations and functionality assessments:
(1)
Unit common main control room envelope during corrective maintenance in support of
sewer line repairs during the week of January 9, 2023
(2)
Unit 1 HPCI system with non-functional barometric condenser vacuum pump during
the week of January 9, 2023
(3)
Unit 1 control rod position indication following loss of core display and 4-rod display
on March 10 and March 13, 2023
(4)
Unit 2 'C' source range monitor (SRM) following circuit wind-up condition on
March 20, 2023
(5)
Unit 2 HPCI steam admission motor-operated valve following NRC identification of
oil/grease separation on March 18 and 21, 2023
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
(1)
Unit 1 main generator air cooler mechanical line stop device installation following
discovery of a service water leak on January 24 and 25, 2023
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage (IP Section 03.01) (1 Sample)
(1)
The inspectors evaluated Unit 2 maintenance outage (2M57) activities from
March 18, 2023 through March 23, 2023
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system
operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (6 Samples)
(1)
Unit 1 HPCI pump, valve and flow test following planned maintenance on
January 10 and 11, 2023
(2)
Unit 2 'C' RHR pump, valve and flow test following planned maintenance on
January 20, 2023
(3)
Unit 1 D11 diesel generator slow start operability test run on February 28, 2023
(4)
Unit 2 'A' SRM following corrective maintenance on March 19, 2023
(5)
Unit 2 'D' inboard main steam isolation valve following packing replacement on
March 20, 2023
(6)
Unit 2 'A' recirculation pump seal following replacement on March 22, 2023
Surveillance Testing (IP Section 03.01) (2 Samples)
(1)
ST-6-049-230-1, Unit 1 reactor core isolation cooling (RCIC) pump, valve and flow
test on February 2 and 6, 2023
(2)
ST-6-049-230-1, Unit 2 RCIC pump, valve and flow test on February 15, 2023
Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)
(1)
ST-6-107-590-2, Unit 2 reactor coolant system elevated unidentified leak rate during
the week of February 27, 2023
Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)
(1)
'B' FLEX diesel generator functional test on January 18, 2023
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)
The inspectors evaluated:
(1)
The inspectors observed and evaluated licensed operator requalification training
scenarios in the simulator on February 6, 2023
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
IE03: Unplanned Power Changes per 7000 Critical Hours (IP Section 02.02) (2 Samples)
(1)
Unit 1 for the period of January 1, 2022 through December 31, 2022
(2)
Unit 2 for the period of January 1, 2022 through December 31, 2022
MS07: High-Pressure Injection Systems (IP Section 02.06) (2 Samples)
(1)
Unit 1 for the period of January 1, 2022 through December 31, 2022
(2)
Unit 2 for the period of January 1, 2022 through December 31, 2022
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
(1)
Unit 1 for the period of January 1, 2022 through December 31, 2022
(2)
Unit 2 for the period of January 1, 2022 through December 31, 2022
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 17, 2023, the inspectors presented the integrated inspection results to
Michael Gillin, Site Vice President, and other members of the licensee staff.
THIRD PARTY REVIEWS
Inspectors reviewed Institute on Nuclear Power Operations reports that were issued during the
inspection period.