ML17059B554

From kanterella
Revision as of 22:53, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1
ML17059B554
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/31/1997
From: COLEMAN D E
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B552 List:
References
NUDOCS 9705220320
Download: ML17059B554 (2)


Text

OPERATING STATUSRev.1OPERATING DATAREPORTDOCKETNO.:50-220DATE:4/03/97PREPAREDBY:D.E.ColemanTELEPHONE:

(315)349-25581.UnitName:NineMilePointUnit//12.Reporting Period:March19973.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6425.DesignElectrical Rating(NetMWe):6136.MaximumDependable Capacity(GrossMWe):5847.MaximumDependable Capacity(NetMWe):5658.IfChangesOccurinCapacityRatings(ItemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 11.HoursinReporting Period12.NumberofHoursReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator On-Line15.UnitReserveShutdownHours16.GrossThermalEnergyGenerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months(Type,Date(35DayRefuelOutagescheduled forMarch3,1997)2160.01452.901445.202,613,580.0 893,362.0 868,938.0 66.966.971.265.62.8744.071.0071.00116)233.039,393.038,226.09.59.59.18.40.0andDurationofEach):241)417.2163729.91,204.2159,801.4 20.42718203600I90,471,818.0 87,730,492.0 66.266.260.258.722.225.IfshutdownAtEndofReportPeriod,Estimated DateofStartup:April18,19979705220320 970512PDRADOCK05000220RPDR

'i(yL~I'tg~Is()ergI41h