ML17059B553

From kanterella
Revision as of 08:49, 29 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1
ML17059B553
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1997
From: COLEMAN D E
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B552 List:
References
NUDOCS 9705220319
Download: ML17059B553 (2)


Text

OPERATINGSTATUSRev.IOPERATINGDATAREPORTDOCKETNO.:50-220DATE:3/05/97PREPAREDBY:D.E.ColemanTELEPHONE:(315)349-2558I1.UnitName:NineMilePointUnit//12.ReportingPeriod:February19973.LicensedThermalPower(MWt):18504.NameplateRating(GrossMWe):6425.DesignElectricalRating(NetMWe):6136.MaximumDependableCapacity(GrossMWe):5847.MaximumDependableCapacity(NetMWe):5658.IfChangesOccurinCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted,IfAny(NetMWe):10.ReasonsForRestrictions,IfAny:ThisMonthYr-to-DateCumulative1416.01381.901374,202,497,347.0853,969.0830,712,097.097.0103.895.73.011.HoursinReportingPeriod672.012.NumberofHoursReactorWasCritical672.013.ReactorReserveShutdownHours014.HoursGeneratorOn-Line672.015.UnitReserveShutdownHours016.GrossThermalEnergyGenerated(MWH)1,211,908.017.GrossElectricalEnergyGenerated(MWH)414,717.018.NetElectricalEnergyGenerated(MWH)403,462.019.UnitServiceFactor100.020.UnitAvailabilityFactor100.021.UnitCapacityFactor(UsingMDCNet)106.322.UnitCapacityFactor(UsingDERNet)97.923.UnitForcedOutageRate0.024.ShutdownsScheduledOverNext6Months(Type,DateandDurationofEach):(35DayRefuelOutagescheduledforMarch3,1997)240,673.2163658.91,204.2159,730.420.4271,704,127.090,432,425.087,692,266,066.466.460.358.822.225.IfshutdownAtEndofReportPeriod,EstimatedDateofStartup:97052203%9970512PDRADQCK05000220.RPDR

~0