Category:INSPECTION REPORT
MONTHYEARIR 05000250/20224032024-11-18018 November 2024 Material Control & Accounting Program - Inspection Report 05000250/2022403 & 05000251/2022403 IR 05000250/20240032024-11-13013 November 2024 Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 IR 05000250/20240022024-08-0101 August 2024 Integrated Inspection Report 05000250/2024002 and 05000251/2024002 IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation ML24072A2382024-03-20020 March 2024 Review of the Fall 2023 Steam Generator Tube Inspections During Refueling Outage No. 33 IR 05000250/20244202024-03-11011 March 2024 – Security Baseline Inspection Report 05000250/2024420 and 05000251/2024420 - Final IR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20230042024-02-13013 February 2024 Integrated Inspection Report 05000250/2023004 and 05000251/2023004 IR 05000250/20230032023-11-0909 November 2023 – Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 IR 05000250/20234022023-06-12012 June 2023 – Security Baseline Inspection Report 05000250/2023402 and 05000251/2023402 IR 05000250/20233012023-05-17017 May 2023 – NRC Operator License Examination Report 05000250/2023301 and 05000251/2023301 IR 05000250/20230012023-05-12012 May 2023 – Integrated Inspection Report 05000250/2023001 and 05000251/2023001 IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) IR 05000250/20220042023-01-27027 January 2023 – Integrated Inspection Report 05000250/2022004 and 05000251/2022004 IR 05000250/20220112022-12-20020 December 2022 – Design Basis Assurance Inspection (Programs) Inspection Report 05000250/2022011 and 05000251/2022011 IR 05000250/20220102022-11-29029 November 2022 Triennial Fire Protection Inspection Report 05000250/2022010 and 05000251/2022010 IR 05000250/20224022022-11-0707 November 2022 Security Baseline Inspection Report 05000250 2022402 and 05000251 2022402 IR 05000250/20220032022-10-31031 October 2022 Integrated Inspection Report 05000250/2022003 and 05000251/2022003 ML22286A1262022-10-28028 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections During Refueling Outage No. 32 IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) IR 05000250/20220022022-08-12012 August 2022 Integrated Inspection Report 05000250/2022002 and 05000251/2022002 IR 05000250/20220012022-05-11011 May 2022 Integrated Inspection Report 05000250/2022001 and 05000251/2022001 L-2022-072, Steam Generator Tube Inspection Report2022-05-0606 May 2022 Steam Generator Tube Inspection Report IR 05000250/20224012022-03-0808 March 2022 Security Baseline Inspection Report 05000250/2022401 and 05000251/2022401(U) IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) IR 05000250/20210042022-02-0202 February 2022 Integrated Inspection Report 05000250/2021004 and 05000251/2021004 IR 05000250/20210032021-11-0303 November 2021 Integrated Inspection Report 05000250/2021003 and 05000251/2021003 IR 05000250/20210072021-11-0303 November 2021 Follow-Up Assessment Letter Report 05000250/2021007 IR 05000250/20210402021-09-30030 September 2021 95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040 IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) IR 05000250/20210022021-08-0404 August 2021 Integrated Inspection Report 05000250/2021002 and 05000251/2021002 IR 07200062/20210012021-07-21021 July 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200062/2021001 IR 05000250/20214012021-06-11011 June 2021 Security Baseline Inspection Report 05000250/2021401, 05000251/2021401, and 07200062/2021401 IR 05000250/20210012021-05-0707 May 2021 Integrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter IR 05000250/20210122021-05-0505 May 2021 Biennial Problem Identification and Resolution Inspection Report 05000250/2021012 and 05000251/2021012 IR 05000250/20214202021-04-29029 April 2021 Security Baseline Inspection Report 05000250/2021420 and 05000251/2021420 Cover Letter IR 05000250/20213012021-04-10010 April 2021 NRC Operator License Examination Report 05000250/2021301 and 05000251/2021301 IR 05000250/20210902021-04-0606 April 2021 Notice of Violation and Proposed Imposition of Civil Penalty $150,000, NRC Inspection Report Nos.05000250/2021090 and 05000251/2021090; Investigation Report Nos. 2-2019-011 and 2-2019-025 Exercise of Enforcement Discretion IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 IR 05000250/20210102021-02-26026 February 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000250/2021010 and 05000251/2021010 2024-08-06
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000250/19990051999-10-0404 October 1999 Insp Repts 50-250/99-05 & 50-251/99-05 on 990725-0904.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000250/19990041999-08-23023 August 1999 Insp Repts 50-250/99-04 & 50-251/99-04 on 990613-0724.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000250/19990031999-07-0202 July 1999 Insp Repts 50-250/99-03 & 50-251/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000250/19990021999-05-27027 May 1999 Insp Repts 50-250/99-02 & 50-251/99-02 on 990321-0521.One Violation Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000250/19990011999-04-16016 April 1999 Insp Repts 50-250/99-01 & 50-251/99-01 on 990207-0320.One Violation Occurred & Being Treated as non-cited Violation. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support,Including Biennial EP Exercise IR 05000250/19980131999-03-0808 March 1999 Insp Repts 50-250/98-13 & 50-251/98-13.No Violations Noted. Major Areas Inspected:Licensee Operation,Maint,Engineering & Plant Support IR 05000250/19980121999-01-12012 January 1999 Insp Repts 50-250/98-12 & 50-251/98-12 on 981115-1226.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19980111998-12-0909 December 1998 Insp Repts 50-250/98-11 & 50-251/98-11 on 981004-1114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Rept Also Includes Results of Insp by Regional Health Physics Inspector IR 05000250/19980101998-11-0202 November 1998 Insp Repts 50-250/98-10 & 50-251/98-10 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000250/19980091998-09-22022 September 1998 Insp Repts 50-250/98-09 & 50-251/98-09 on 980727-31 & 0810- 14.No Violations Noted.Major Areas Inspected:Operations, Maint & Engineering IR 05000250/19980081998-09-15015 September 1998 Insp Repts 50-250/98-08 & 50-251/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML17354B0831998-08-10010 August 1998 Insp Repts 50-250/98-07 & 50-251/98-07 on 980531-0711.One Apparent Violations Noted & Being Considered for Escalated Ea.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML17354B0101998-06-25025 June 1998 Partially Withheld Insp Repts 50-250/98-06 & 50-251/98-06 on 980521-22 & 0601-03 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors IR 05000250/19980041998-05-18018 May 1998 Insp Repts 50-250/98-04 & 50-251/98-04 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19980031998-04-0101 April 1998 Insp Repts 50-250/98-03 & 50-251/98-03 on 980302-06.No Violations Noted.Major Areas Inspected:Plant Support Including Physical Security Program for Power Reactors IR 05000250/19980021998-03-26026 March 1998 Insp Repts 50-250/98-02 & 50-251/98-02 on 980125-0307.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Rept Includes Regional Announced Insp of Health Physics Also IR 05000250/19970131998-02-19019 February 1998 Insp Repts 50-250/97-13 & 50-251/97-13 on 971214-980121.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000250/19970111997-11-24024 November 1997 Insp Repts 50-250/97-11 & 50-251/97-11 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19970091997-09-26026 September 1997 Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists IR 05000250/19970081997-09-0505 September 1997 Insp Repts 50-250/97-08 & 50-251/97-08 on 970628-0809.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000250/19970071997-07-17017 July 1997 Insp Repts 50-250/97-07,50-251/97-07,50-335/97-07 & 50-389/97-07 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML17354A5601997-06-25025 June 1997 Insp Repts 50-250/97-05 & 50-251/97-05 on 970512-16.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise IR 05000250/19970041997-05-30030 May 1997 Insp Repts 50-250/97-04 & 50-251/97-04 on 970330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19970031997-04-23023 April 1997 Integated Insp Repts 50-250/97-03 & 50-251/97-03 on 970216- 0329.No Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support IR 05000250/19970011997-03-0707 March 1997 Insp Repts 50-250/97-01 & 50-251/97-01 on 970101-0215.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000250/19960121996-12-10010 December 1996 Insp Repts 50-250/96-12 & 50-251/96-12 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML17354A3141996-10-15015 October 1996 Insp Repts 50-250/96-11 & 50-251/96-11 on 960818-0928. Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering,Plant Support & Fire Protection Barrier Requirements IR 05000250/19960101996-09-11011 September 1996 Insp Repts 50-250/96-10 & 50-251/96-10 on 960817.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19960091996-08-23023 August 1996 Insp Repts 50-250/96-09 & 50-251/96-09 on 960722-26.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program for Power Reactors IR 05000250/19960081996-08-16016 August 1996 Insp Repts 50-250/96-08 & 50-251/96-08 on 960616-0720.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000250/19960071996-07-10010 July 1996 Insp Repts 50-250/96-07 & 50-251/96-07 on 960612-14.No Violations Noted.Major Areas Inspected:Psychological Evaluations & Training of Personnel & Supervisors IR 05000250/19960061996-06-15015 June 1996 Insp Repts 50-250/96-06 & 50-251/96-06 on 960505-0615. Violation Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000250/19960051996-05-31031 May 1996 Insp Repts 50-250/96-05,50-251/96-05,50-335/96-07 & 50-389/96-07.No Violations Noted.Major Areas Inspected: Effectiveness of Licensee Speakout Programs in Addressing Safety Concerns IR 05000250/19960021996-04-22022 April 1996 Insp Repts 50-250/96-02 & 50-251/96-02 on 960211-0323.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering,Plant Support,Summary of Plant Status, & Operations IR 05000250/19960011996-03-0808 March 1996 Insp Repts 50-250/96-01 & 50-251/96-01 on 951230-960210.No Violations Noted.Major Areas Inspected:Plant Operations, Plant Events,Maint,Engineering,Plant Support & Radiological Controls & Fire Protection IR 05000250/19950221996-01-26026 January 1996 Insp Repts 50-250/95-22 & 50-251/95-22 on 951119-1230.No Violations Noted.Major Areas Inspected:Plant Operations Including Operational Safety & Plant Event,Maint,Including Surveillance Observations & Fire Protection IR 05000250/19950231996-01-0404 January 1996 Insp Repts 50-250/95-23 & 50-251/95-23 on 951211-15.No Violations Noted.Major Areas Inspected:Emergency Plan, Emergency Facilities,Organization & Mgt Control,Independent & Internal Reviews/Audits & Training IR 05000250/19950171995-12-0707 December 1995 Insp Repts 50-250/95-17 & 50-251/95-17 on 951106-17.No Violations Noted.Major Areas Inspected:Procurement Engineering,Focussing on Matl Upgrades & Item Substitutions IR 05000250/19950201995-12-0505 December 1995 Insp Repts 50-250/95-20 & 50-251/95-20 on 951106-09.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Radwaste Group,Audits,Plant Water Chemistry & Annual Radioactive Effluent Release Rept IR 05000250/19950191995-12-0404 December 1995 Insp Repts 50-250/95-19 & 50-251/95-19 on 951015-1118.No Violations Noted.Major Areas Inspected:Plant Operations Including Operational Safety & Plant Events;Maint Including Surveillance Observations;Engineering & Plant Support ML17353A4411995-11-0808 November 1995 Insp Repts 50-250/95-16 & 50-251/95-16 on 950903-1014. Violations Noted.Major Areas Inspected:Plant Operations, Including ESF Walkdown,Operational Safety,Refueling Outage Activities,Plant Events & Maint IR 05000250/19950151995-09-29029 September 1995 Insp Repts 50-250/95-15 & 50-251/95-15 on 950730-0902.No Violations Noted.Major Areas Inspected:Plant Operations, Operational Safety,Refueling Preparation,Plant Events, Maintenance & Engineering IR 05000250/19950131995-08-16016 August 1995 Insp Repts 50-250/95-13 & 50-251/95-13 on 950717-21.No Violations or Deviations Noted.Major Areas Inspected:Area of Confirmatory Measurements IR 05000250/19950141995-08-11011 August 1995 Insp Repts 50-250/95-14 & 50-251/95-14 on 950702-29.No Violations Noted.Major Areas Inspected:Plant Operations Including Operational Safety,Refueling Preparations & Plant Events;Maint Including Surveillance Observations IR 05000250/19950111995-07-28028 July 1995 Insp Repts 50-250/95-11 & 50-251/95-11 on 950528-0701.No Violations or Deviations Noted.Major Areas Inpected:Plant Operations Including Operational Safety & Plant Events,Maint Including Surveillance Observations & Engineering IR 05000250/19950121995-07-10010 July 1995 Insp Repts 50-250/95-12 & 50-251/95-12 on 950626-30.No Violations or Deviations Noted.Major Areas Inspected: Implementation of New 10CFR20 Requirements IR 05000250/19950101995-06-22022 June 1995 Insp Repts 50-250/95-10 & 50-251/95-10 on 950430-0526.No Violations Noted.Major Areas Inspected:Plant Operations Including Operational Safety & Plant Events,Maint Including Surveillance Observations,Engineering & Plant Support IR 05000250/19950091995-05-17017 May 1995 Insp Repts 50-250/95-09 & 50-251/95-09 on 950326-0429.Two non-cited Violations Noted.Major Areas Inspected:Plant Operations,Plant Events,Maint,Chemistry & Fire Protection IR 05000250/19950071995-05-0303 May 1995 Insp Repts 50-250/95-07 & 50-251/95-07 on 950320-24.No Violations Noted.Major Areas Inspected:Annual EP Exercise Conducted at Plant on 950322 Including Er Program & Implementation of Emergency Plan IR 05000250/19950051995-04-27027 April 1995 Insp Repts 50-250/95-05 & 50-251/95-05 on 950306-10 & 0328-29.No Violations Noted.Major Areas Inspected:Annual Radiological Environ Operating Rept,Radiological Liquid & Gaseous Effluent Releases 1999-08-23
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000250/20224032024-11-18018 November 2024 Material Control & Accounting Program - Inspection Report 05000250/2022403 & 05000251/2022403 IR 05000250/20240032024-11-13013 November 2024 Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 IR 05000250/20240022024-08-0101 August 2024 Integrated Inspection Report 05000250/2024002 and 05000251/2024002 IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation ML24072A2382024-03-20020 March 2024 Review of the Fall 2023 Steam Generator Tube Inspections During Refueling Outage No. 33 IR 05000250/20244202024-03-11011 March 2024 – Security Baseline Inspection Report 05000250/2024420 and 05000251/2024420 - Final IR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20230042024-02-13013 February 2024 Integrated Inspection Report 05000250/2023004 and 05000251/2023004 IR 05000250/20230032023-11-0909 November 2023 – Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 IR 05000250/20234022023-06-12012 June 2023 – Security Baseline Inspection Report 05000250/2023402 and 05000251/2023402 IR 05000250/20233012023-05-17017 May 2023 – NRC Operator License Examination Report 05000250/2023301 and 05000251/2023301 IR 05000250/20230012023-05-12012 May 2023 – Integrated Inspection Report 05000250/2023001 and 05000251/2023001 IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) IR 05000250/20220042023-01-27027 January 2023 – Integrated Inspection Report 05000250/2022004 and 05000251/2022004 IR 05000250/20220112022-12-20020 December 2022 – Design Basis Assurance Inspection (Programs) Inspection Report 05000250/2022011 and 05000251/2022011 IR 05000250/20220102022-11-29029 November 2022 Triennial Fire Protection Inspection Report 05000250/2022010 and 05000251/2022010 IR 05000250/20224022022-11-0707 November 2022 Security Baseline Inspection Report 05000250 2022402 and 05000251 2022402 IR 05000250/20220032022-10-31031 October 2022 Integrated Inspection Report 05000250/2022003 and 05000251/2022003 ML22286A1262022-10-28028 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections During Refueling Outage No. 32 IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) IR 05000250/20220022022-08-12012 August 2022 Integrated Inspection Report 05000250/2022002 and 05000251/2022002 IR 05000250/20220012022-05-11011 May 2022 Integrated Inspection Report 05000250/2022001 and 05000251/2022001 L-2022-072, Steam Generator Tube Inspection Report2022-05-0606 May 2022 Steam Generator Tube Inspection Report IR 05000250/20224012022-03-0808 March 2022 Security Baseline Inspection Report 05000250/2022401 and 05000251/2022401(U) IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) IR 05000250/20210042022-02-0202 February 2022 Integrated Inspection Report 05000250/2021004 and 05000251/2021004 IR 05000250/20210032021-11-0303 November 2021 Integrated Inspection Report 05000250/2021003 and 05000251/2021003 IR 05000250/20210072021-11-0303 November 2021 Follow-Up Assessment Letter Report 05000250/2021007 IR 05000250/20210402021-09-30030 September 2021 95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040 IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) IR 05000250/20210022021-08-0404 August 2021 Integrated Inspection Report 05000250/2021002 and 05000251/2021002 IR 07200062/20210012021-07-21021 July 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200062/2021001 IR 05000250/20214012021-06-11011 June 2021 Security Baseline Inspection Report 05000250/2021401, 05000251/2021401, and 07200062/2021401 IR 05000250/20210012021-05-0707 May 2021 Integrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter IR 05000250/20210122021-05-0505 May 2021 Biennial Problem Identification and Resolution Inspection Report 05000250/2021012 and 05000251/2021012 IR 05000250/20214202021-04-29029 April 2021 Security Baseline Inspection Report 05000250/2021420 and 05000251/2021420 Cover Letter IR 05000250/20213012021-04-10010 April 2021 NRC Operator License Examination Report 05000250/2021301 and 05000251/2021301 IR 05000250/20210902021-04-0606 April 2021 Notice of Violation and Proposed Imposition of Civil Penalty $150,000, NRC Inspection Report Nos.05000250/2021090 and 05000251/2021090; Investigation Report Nos. 2-2019-011 and 2-2019-025 Exercise of Enforcement Discretion IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 IR 05000250/20210102021-02-26026 February 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000250/2021010 and 05000251/2021010 2024-08-06
[Table view] Category:UTILITY
MONTHYEARIR 05000250/19900361990-11-15015 November 1990 Insp Repts 50-250/90-36 & 50-251/90-36 on 901005-1102.No Violations Noted.Major Areas Inpected:Monthly Surveillance Observations,Monthly Maint Observations,Operational Safety & Plant Events IR 05000250/19900331990-11-0202 November 1990 Insp Repts 50-250/90-33 & 50-251/90-33 on 901001-05.No Violations or Deviations Noted.Major Areas Inspected: Electrical Construction Activities Related to Emergency Power Sys Enhancement Program IR 05000250/19900321990-11-0202 November 1990 Insp Repts 50-250/90-32 & 50-251/90-32 on 901001-05.No Violations or Deviations Noted.Major Areas Inspected:Spent Fuel Cooling Sys Mod,New Emergency Diesel Generator Bldg Construction & Previous Open Items IR 05000250/19900371990-11-0101 November 1990 Insp Repts 50-250/90-37 & 50-251/90-37 on 901015-19.No Violations or Deviations Noted.Major Areas Inspected:General Design Criteria & Qualification for Emergency Diesel,Test & Qualification Repts,Safety Evaluations & Procedures IR 05000250/19900311990-10-31031 October 1990 Insp Repts 50-250/90-31 & 50-251/90-31 on 900901-1004.No Violations or Deviations Noted.Major Areas Inspected:Monthly Maint Observations,Engineered Safety Features Walkdowns, Operational Safety & Plant Events IR 05000250/19900341990-10-30030 October 1990 Insp Repts 50-250/90-34 & 50-251/90-34 on 901001-05. Violation Noted But Not Cited.Major Areas Inspected: Radiological Liquid & Gaseous Effluent Processing & Releases & Water Chemistry ML17348A5861990-09-21021 September 1990 Insp Repts 50-250/90-30 & 50-251/90-30 on 900804-31. Violation Noted.Major Areas Inspected:Monthly Surveillance Observations,Monthly Maint Observations,Operational Safety & Plant Events IR 05000250/19900281990-09-0707 September 1990 Insp Repts 50-250/90-28 & 50-251/90-28 on 900806-10.Noncited Violations Noted.Major Areas Inspected:Operational Readiness of Site Emergency Preparedness Program Including Emergency Plan & Associated Implementing Procedures & Training IR 05000250/19900251990-08-17017 August 1990 Insp Repts 50-250/90-25 & 50-251/90-25 on 900630-0803.One Noncited Violation,Unresolved Item & Concern Noted.Major Areas Inspected:Monthly Surveillance & Maint Observations, ESF Walkdowns & Operational Safety ML17348A4841990-07-23023 July 1990 Insp Repts 50-250/90-18 & 50-251/90-18 on 900526-0629. Violations Noted.Major Areas Inspected:Monthly Surveillance Observations,Monthly Maint Observations,Esf Walkdowns, Operational Safety & Plant Events IR 05000250/19900221990-07-19019 July 1990 Insp Repts 50-250/90-22 & 50-251/90-22 on 900618-22.No Violations or Deviations Noted.Major Areas Inspected: Inservice Testing of Pressure Isolation Valves & Review of Licensee Action on Previous Insp Findings IR 05000250/19900211990-07-18018 July 1990 Insp Repts 50-250/90-21 & 50-251/90-21 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected: Security Plan & Implementing Procedures,Physical Barriers - Protected Area & Vital Areas IR 05000250/19900241990-07-17017 July 1990 Insp Repts 50-250/90-24 & 50-251/90-24 on 900625-29.No Violations Noted.Major Areas Inspected:Inservice Testing,Ie Bulletin Followup & Followup on Previous Insp Findings IR 05000250/19900231990-07-16016 July 1990 Insp Repts 50-250/90-23 & 50-251/90-23 on 900625-29.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection IR 05000250/19900191990-07-12012 July 1990 Insp Repts 50-250/90-19 & 50-251/90-19 on 900618-22.No Violations or Deviations Noted.Major Areas Inspected:Design Control,Engineering Support Functions,Commercial Grade Procurement & Licensee Action on Previous Insp Findings IR 05000250/19900151990-06-21021 June 1990 Insp Repts 50-250/90-15 & 50-251/90-15 on 900521-25.No Violations or Deviations Noted.Major Areas Inspected: Radiological Liguid & Gaseous Effluent Processing & Releases & Environ Monitoring Programs & Water Chemistry ML17348A3541990-06-21021 June 1990 Insp Repts 50-250/90-14 & 50-251/90-14 on 900428-0525. Violations Noted.Major Areas Inspected:Monthly Surveillance Observations,Monthly Maint Observations & ESF Walkdowns IR 05000250/19900161990-06-14014 June 1990 Insp Repts 50-250/90-16 & 50-251/90-16 on 900522-25 & 0530- 0601.No Violations or Deviations Noted.Major Areas Inspected:Initial Criticality & Low Power Physics Testing of Unit 3,Cycle 12 & Closeout of Open Items IR 05000250/19900131990-06-13013 June 1990 Insp Repts 50-250/90-13 & 50-251/90-13 on 900430-0504 & 0514-18.No Violations or Deviations Noted.Major Areas Inspected:Containment Leak Rate Testing,Containment Integrity & Licensee Action on Previous Insp Findings IR 05000250/19900171990-06-12012 June 1990 Partially Withheld Insp Repts 50-250/90-17 & 50-251/90-17 on 900529-0601 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000250/19900081990-06-0505 June 1990 Insp Repts 50-250/90-08 & 50-251/90-08 on 900402-06, 0430-0504 & 10.Violations Noted.Major Areas Inspected: Radiation Protection Program,Including Health Physics (HP) Activities During Contractor HP Technician Walkout IR 05000250/19900121990-05-15015 May 1990 Insp Repts 50-250/90-12 & 50-251/90-12 on 900507-11.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Including Review of NDE Procedures,Review of Personnel Qualifications & Complete NDE Data IR 05000250/19900101990-04-25025 April 1990 Insp Repts 50-250/90-10 & 50-251/90-10 on 900409-12.No Violations Noted.Major Areas Inspected:Concrete Placement for Addition of New Emergency Diesel Generator IR 05000250/19900061990-04-13013 April 1990 Insp Repts 50-250/90-06 & 50-251/90-06 on 900224-0323. Noncited Violations Noted Re Installation of Nonconforming Valve for Isolating Pressure Gauge.Major Areas Inspected: Monthly Maint/Surveillance Observation & ESF Walkdowns IR 05000250/19900071990-04-12012 April 1990 Insp Repts 50-250/90-07 & 50-251/90-07 on 900319-23.No Violations or Deviations Noted.Major Areas Inspected: Quality Verification Functions & Followup of Previous Insp Findings IR 05000250/19900021990-03-15015 March 1990 Partially Withheld Insp Repts 50-250/90-02 & 50-251/90-02 on 900129-0202 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Detection & Assessment Aids IR 05000250/19900051990-03-0909 March 1990 Insp Repts 50-250/90-05 & 50-251/90-05 on 900226-0302.No Violations or Deviations Noted.Major Areas Inspected:Routine Unannounced Insp in Area of Inservice Insp,Including Review of Program Implementing Procedures IR 05000250/19900031990-03-0606 March 1990 Insp Repts 50-250/90-03 & 50-251/90-03 on 900205-09.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness,Including Maint of Select Emergency Kits & Equipment & Proposed Organizational Changes ML17347B5931990-02-14014 February 1990 Insp Repts 50-250/89-54 & 50-251/89-54 on 891223-900126. Violations Noted.Major Areas Inspected:Monthly Surveillance Observations,Monthly Maint Observations,Operational Safety, Plant Events & Mgt Meetings IR 05000250/19900011990-02-0101 February 1990 Insp Repts 50-250/90-01 & 50-251/90-01 on 900108-12.No Violations Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97,instrumentation for light-water Cooled Plant to Assess Conditions During & After Accident IR 05000250/19890371990-01-0404 January 1990 Insp Repts 50-250/89-37 & 50-251/89-37 on 891113-17.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Requirements of 10CFR50,App R,Sections Iii.G,Iii.J & Iii.O IR 05000250/19890491989-12-20020 December 1989 Resident Insp Repts 50-250/89-49 & 50-251/89-49 on 891028- 1201.No Violations Noted.Inspector Followup Item Noted Re Discrepancies in Breaker Numbers.Major Areas Inspected: Monthly Surveillance & Maint Observations & ESF Walkdowns IR 05000250/19890501989-12-18018 December 1989 Insp Repts 50-250/89-50 & 50-251/89-50 on 891128-1201.No Violations or Deviations Noted.Major Areas Inspected:Annual Radiological Emergency Preparedness Exercise ML20005E2031989-12-18018 December 1989 Partially Withheld Insp Repts 50-250/89-51 & 50-251/89-51 on 891204-08 (Ref 10CFR2.790(d) & 73.21)).Violation Noted: Fazilure to Control Safeguards Info.Major Areas Inspected: Progress in Area of Security Upgrade & Event 89-S06 IR 05000250/19890471989-12-12012 December 1989 Insp Repts 50-250/89-47 & 50-251/89-47 on 891023-27.No Violations or Deviations Noted.Major Areas Inspected: Previous Open Items,Recent Mods & Snubber Insp & Waterhammer Prevention Programs ML17347B4711989-11-30030 November 1989 Insp Repts 50-250/89-44 & 50-251/89-44 on 891002-20.No Violations or Deviations Noted.Major Areas Inspected:Util Corrective Actions & Programs in Response to Independent Mgt Assessment Conducted Between Dec 1987 & Mar 1988 IR 05000250/19890461989-11-29029 November 1989 Insp Repts 50-250/89-46 & 50-251/89-46 on 891023-27.No Violations or Deviations Noted.Major Areas Inspected: Radiological Liquid & Gaseous effluents,post-accident Sampling Sys & Water Chemistry IR 05000250/19890411989-10-25025 October 1989 Insp Repts 50-250/89-41 & 50-251/89-41 on 890828-0901.No Violations or Deviations Noted.Major Areas Inspected: Implementation of Performance Enhancement Program,Selected Task Items for Project 2,operations Enhancement & Project 3 IR 05000250/19890391989-10-23023 October 1989 Insp Repts 50-250/89-39 & 50-251/89-39 on 890809-11.No Violations Noted.Major Areas Inspected:Followup to NRC- Administered Requalification Exams,Special Announced Insps & NRC-administered Retake Exams IR 05000250/19890421989-09-21021 September 1989 Partially Withheld Insp Repts 50-250/89-42 & 50-251/89-42 on 890828-0901 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures & Security Organization IR 05000250/19890401989-09-19019 September 1989 Insp Repts 50-250/89-40 & 50-251/89-40 on 890729-0825.No Violations Noted.Major Areas Inspected:Direct Insp at Site in Areas of Monthly Surveillance Observations,Monthly Maint Observations & ESF Walkdowns IR 05000250/19890341989-08-31031 August 1989 Insp Repts 50-250/89-34 & 50-251/89-34 on 890701-28.No Violations or Deviations Noted.Major Areas Inspected:Monthly Surveillance & Maint Observations,Esf Walkdowns,Operational Safety & Plant Events IR 05000250/19890351989-08-29029 August 1989 Insp Repts 50-250/89-35 & 50-251/89-35 on 890724-28.Noncited Violations Noted Re Failure to Rept Correct Total Radioactivity on Waste Shipping Manifests.Major Areas Inspected:Radiation Protection Program & Employee Training IR 05000250/19890321989-08-21021 August 1989 Insp Repts 50-250/89-32 & 50-251/89-32 on 890626-30.No Violations Noted.Major Areas inspected:post-refueling Startup Tests,Core Performance Monitoring,Nuclear Instrument Calibrs & Thermal Power Monitoring IR 05000250/19890331989-08-0909 August 1989 Partially Withheld Insp Repts 50-250/89-33 & 50-251/89-33 on 890717-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Effectiveness, Physical Barriers,Assessment Aids & Personnel Training IR 05000250/19890311989-07-28028 July 1989 Insp Repts 50-250/89-31 & 50-251/89-31 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Program,Including Emergency Detection & Classification & Protective Action Decision Making ML17347B2581989-07-28028 July 1989 Insp Repts 50-250/89-27 & 50-251/89-27 on 890527-0630. Violations Noted.Major Areas Inspected:Monthly Surveillance & Maint Observations,Esf Walkdowns,Operational Safety,Plant Events & Unit 3 Startup from Outage IR 05000250/19890301989-07-27027 July 1989 Partially Withheld Insp Repts 50-250/89-30 & 50-251/89-30 on 890614-16 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Access Control of Personnel,Packages,Vehicles & Alarm Stations IR 05000250/19890281989-07-20020 July 1989 Insp Repts 50-250/89-28 & 50-251/89-28 on 890613-16.No Violations or Deviations Noted.Major Areas Inspected:Quality Records for Concrete Placed in New Diesel Generator Bldg, Snubber Surveillance Program & Licensee Identified Item IR 05000250/19890291989-06-30030 June 1989 Insp Repts 50-250/89-29 & 50-251/89-29 on 890619-23.No Violations or Deviations Identified.Major Areas Inspected: Followup on Licensee Actions on Previous Insp Findings 1990-09-07
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000250/19993011999-10-18018 October 1999 NRC Operator Licensing Exam Repts 50-250/99-301 & 50-251/99-301 (Including Completed & Graded Tests) for Tests Administered on 990830-0916.All Applicants,Two SRO & Five RO Passed Exams IR 05000250/19990051999-10-0404 October 1999 Insp Repts 50-250/99-05 & 50-251/99-05 on 990725-0904.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-II-99-037A, on 990914,preparations for Hurricane Floyd Were Made.Fp&L Is Continuing to Prepare for Approach of Hurricane,Including Implementation of Procedures for Severe Weather Preparations.Nrc Entered Monitoring Mode1999-09-14014 September 1999 PNO-II-99-037A:on 990914,preparations for Hurricane Floyd Were Made.Fp&L Is Continuing to Prepare for Approach of Hurricane,Including Implementation of Procedures for Severe Weather Preparations.Nrc Entered Monitoring Mode PNO-II-99-037B, on 990914,Hurricane Floyd Was Located Approx 200 Miles east-southeast of St Lucie Nuclear Plant & with Ctr Estimated Near Latitude 26.0 North & Longitude 77.0 West.Licensee Continuing to Monitor Progress of Hurricane1999-09-14014 September 1999 PNO-II-99-037B:on 990914,Hurricane Floyd Was Located Approx 200 Miles east-southeast of St Lucie Nuclear Plant & with Ctr Estimated Near Latitude 26.0 North & Longitude 77.0 West.Licensee Continuing to Monitor Progress of Hurricane PNO-II-99-037, on 990914,Hurricane Floyd Was Located Approx 255 Miles Due East of Turkey Point Nuclear Plant & with Ctr Estimated Near Latitude 25.4 North & Longitude 76.2 West. FEMA Region IV Regional Operations Ctr Fully Activated1999-09-14014 September 1999 PNO-II-99-037:on 990914,Hurricane Floyd Was Located Approx 255 Miles Due East of Turkey Point Nuclear Plant & with Ctr Estimated Near Latitude 25.4 North & Longitude 76.2 West. FEMA Region IV Regional Operations Ctr Fully Activated PNO-II-99-037C, on 990914,Hurricane Floyd Was Located Approx 200 Miles east-southeast of St Lucie Nuclear Plant & with Ctr Estimated Near Latitude 26.5 North & Longitude 77.4 West.Storm Moving Northwest at 12 Mph1999-09-14014 September 1999 PNO-II-99-037C:on 990914,Hurricane Floyd Was Located Approx 200 Miles east-southeast of St Lucie Nuclear Plant & with Ctr Estimated Near Latitude 26.5 North & Longitude 77.4 West.Storm Moving Northwest at 12 Mph IR 05000250/19990041999-08-23023 August 1999 Insp Repts 50-250/99-04 & 50-251/99-04 on 990613-0724.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000250/19990031999-07-0202 July 1999 Insp Repts 50-250/99-03 & 50-251/99-03 on 990502-0612.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000250/19990021999-05-27027 May 1999 Insp Repts 50-250/99-02 & 50-251/99-02 on 990321-0521.One Violation Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000250/19990011999-04-16016 April 1999 Insp Repts 50-250/99-01 & 50-251/99-01 on 990207-0320.One Violation Occurred & Being Treated as non-cited Violation. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support,Including Biennial EP Exercise IR 05000250/19980131999-03-0808 March 1999 Insp Repts 50-250/98-13 & 50-251/98-13.No Violations Noted. Major Areas Inspected:Licensee Operation,Maint,Engineering & Plant Support IR 05000250/19980121999-01-12012 January 1999 Insp Repts 50-250/98-12 & 50-251/98-12 on 981115-1226.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19980111998-12-0909 December 1998 Insp Repts 50-250/98-11 & 50-251/98-11 on 981004-1114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Rept Also Includes Results of Insp by Regional Health Physics Inspector IR 05000250/19980101998-11-0202 November 1998 Insp Repts 50-250/98-10 & 50-251/98-10 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000250/19983011998-10-14014 October 1998 NRC Operator Licensing Exam Repts 50-250/98-301 & 50-251/98-301 (Including Completed & Graded Tests) for Tests Administered on 980807-13 IR 05000250/19980991998-10-0101 October 1998 SALP Repts 50-250/98-99 & 50-251/98-99 for Period of 960818-0822.Major Areas Evaluated:Plant Operations,Maint, Engineering & Plant Support PNO-II-98-042B, on 980925,update on Hurricane Georges Made. Initial Plant Walkdowns Identified No Significant Damage to Plant Equipment.Licensee No Longer Manning Their EOF for Hurricane Monitoring.Normal Security Patrols Restored1998-09-25025 September 1998 PNO-II-98-042B:on 980925,update on Hurricane Georges Made. Initial Plant Walkdowns Identified No Significant Damage to Plant Equipment.Licensee No Longer Manning Their EOF for Hurricane Monitoring.Normal Security Patrols Restored PNO-II-98-042A, on 980925,update on Hurricane Georges Made. FP&L Remains in Unusual Event Due to Hurricane Warning for Area.Four Region II Inspectors Remain Onsite Monitoring Licensee Activities1998-09-25025 September 1998 PNO-II-98-042A:on 980925,update on Hurricane Georges Made. FP&L Remains in Unusual Event Due to Hurricane Warning for Area.Four Region II Inspectors Remain Onsite Monitoring Licensee Activities PNO-II-98-042, on 980924,licensee Prepared for Approach of Hurricane George & Implemented Procedures for Severe Weather Preparations.Local Officials Instituted Evacuation of Monroe County1998-09-24024 September 1998 PNO-II-98-042:on 980924,licensee Prepared for Approach of Hurricane George & Implemented Procedures for Severe Weather Preparations.Local Officials Instituted Evacuation of Monroe County IR 05000250/19980091998-09-22022 September 1998 Insp Repts 50-250/98-09 & 50-251/98-09 on 980727-31 & 0810- 14.No Violations Noted.Major Areas Inspected:Operations, Maint & Engineering IR 05000250/19980081998-09-15015 September 1998 Insp Repts 50-250/98-08 & 50-251/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML17354B0831998-08-10010 August 1998 Insp Repts 50-250/98-07 & 50-251/98-07 on 980531-0711.One Apparent Violations Noted & Being Considered for Escalated Ea.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML17354B0091998-06-25025 June 1998 Notice of Violation from Insp on 980521-22 & 0601-03. Violation Noted:Licensee Failed to Protect Size of Onsite Reserve Force as Safeguards Info When That Number Was Disclosed in Condition Rept ML17354B0101998-06-25025 June 1998 Partially Withheld Insp Repts 50-250/98-06 & 50-251/98-06 on 980521-22 & 0601-03 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support Re Physical Security Program for Power Reactors PNO-II-98-031, on 980610,unusual Event Declared Because Fire Occurred in 4A Control Rod Drive Motor Generator Set.Fire Fully Extinguished within 29 Minutes After Receiving Smoke Alarm Using Automatic Halon Sys & Portable Extinguishers1998-06-10010 June 1998 PNO-II-98-031:on 980610,unusual Event Declared Because Fire Occurred in 4A Control Rod Drive Motor Generator Set.Fire Fully Extinguished within 29 Minutes After Receiving Smoke Alarm Using Automatic Halon Sys & Portable Extinguishers ML17354A9531998-05-29029 May 1998 Notice of Violation from OI Investigation Conducted on 970924-980225.Violation Noted:On 970909,Training Dept Employee Divulged to Two Sequestered Candidates Info Re Portion of Simulator Exam IR 05000250/19980041998-05-18018 May 1998 Insp Repts 50-250/98-04 & 50-251/98-04 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19980031998-04-0101 April 1998 Insp Repts 50-250/98-03 & 50-251/98-03 on 980302-06.No Violations Noted.Major Areas Inspected:Plant Support Including Physical Security Program for Power Reactors IR 05000250/19980021998-03-26026 March 1998 Insp Repts 50-250/98-02 & 50-251/98-02 on 980125-0307.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Rept Includes Regional Announced Insp of Health Physics Also IR 05000250/19983001998-03-0909 March 1998 NRC Operator Licensing Exam Repts 50-250/98-300 & 50-251/98-300 Administered on 980227.One Senior Reactor Operator Candidate Received JPM re-take Exam.Candidate Performance on JPM Exam Satisfactory IR 05000250/19970131998-02-19019 February 1998 Insp Repts 50-250/97-13 & 50-251/97-13 on 971214-980121.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support PNO-II-98-006, on 980216,Unit 3 Manually Tripped.Root Cause Determination Underway by Event Response Team.Preliminary Reviews Indicate,Failure May Be External Corrosion Induced. Licensee Issued Press Release1998-02-17017 February 1998 PNO-II-98-006:on 980216,Unit 3 Manually Tripped.Root Cause Determination Underway by Event Response Team.Preliminary Reviews Indicate,Failure May Be External Corrosion Induced. Licensee Issued Press Release IR 07100102/20120131998-01-0909 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Rev 32 to Emergency Plan Decreased Effectiveness of Plan IR 05000250/19970111997-11-24024 November 1997 Insp Repts 50-250/97-11 & 50-251/97-11 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19973001997-10-20020 October 1997 NRC Operator Licensing Exam Repts 50-250/97-300 & 50-251/97-300 for Test Administered on 970908-17 IR 05000250/19970091997-09-26026 September 1997 Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists IR 05000250/19970081997-09-0505 September 1997 Insp Repts 50-250/97-08 & 50-251/97-08 on 970628-0809.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000250/19970071997-07-17017 July 1997 Insp Repts 50-250/97-07,50-251/97-07,50-335/97-07 & 50-389/97-07 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML17354A5601997-06-25025 June 1997 Insp Repts 50-250/97-05 & 50-251/97-05 on 970512-16.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise IR 05000250/19970041997-05-30030 May 1997 Insp Repts 50-250/97-04 & 50-251/97-04 on 970330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000250/19970031997-04-23023 April 1997 Integated Insp Repts 50-250/97-03 & 50-251/97-03 on 970216- 0329.No Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20149E5981997-03-20020 March 1997 Partially Deleted Investigation Rept 2-96-027 on 970320.No Noncompliance Noted.Major Areas Investigated:Allegation Re Discrimination Against I&C Technician for Raising Safety Concern Re Calibr of Test Equipment ML20136E5151997-03-0707 March 1997 Partially Withheld NOV on 970203-07 (Ref 10CFR73.21). Violations Noted:Employee Denied Unescorted Access & Was Not Provided Opportunity for Review of Info on Which Denial of Access Authorization Was Based IR 05000250/19970011997-03-0707 March 1997 Insp Repts 50-250/97-01 & 50-251/97-01 on 970101-0215.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support PNO-II-97-013, on 970304,unusual Event Declared Because Electrical Fire Occurred in 4A Control Rod Motor Generator Set & Extinguished Using Automatic Halon & Portable Chemical & Carbon Dioxide Extinguishers.State of Fl Notified1997-03-0404 March 1997 PNO-II-97-013:on 970304,unusual Event Declared Because Electrical Fire Occurred in 4A Control Rod Motor Generator Set & Extinguished Using Automatic Halon & Portable Chemical & Carbon Dioxide Extinguishers.State of Fl Notified PNO-II-97-009, on 970219,licensee Security Officer Discovered Glass Tube W/White Powder Substance at End of Tube.Licensee Inspected All Similar Portable Toilets Onsite & Considering Addl Followup Action.State of Fl Notified1997-02-20020 February 1997 PNO-II-97-009:on 970219,licensee Security Officer Discovered Glass Tube W/White Powder Substance at End of Tube.Licensee Inspected All Similar Portable Toilets Onsite & Considering Addl Followup Action.State of Fl Notified ML17354A4021997-01-30030 January 1997 Notice of Violation from Insp on 961117-1231.Violation noted:non-licensed Operator Failed to Adequately Implement Section 5.1 of Procedure IR 05000250/19960121996-12-10010 December 1996 Insp Repts 50-250/96-12 & 50-251/96-12 on 960929-1116.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support PNO-II-96-073, on 961018,Hurricane Lili Was Located in Vicinity of Plant.Licensee Has Completed Preparations for Hurricane.State of Fl Has Been Informed1996-10-18018 October 1996 PNO-II-96-073:on 961018,Hurricane Lili Was Located in Vicinity of Plant.Licensee Has Completed Preparations for Hurricane.State of Fl Has Been Informed PNO-II-96-073A, on 961018,Hurricane Lili Update Made.Tropical Storm Warning Discontinued for Fl Keys & Bay.Region II Continues to Monitor Hurricane Lili & Resident Inspectors Onsite to Monitor Licensee Activities1996-10-18018 October 1996 PNO-II-96-073A:on 961018,Hurricane Lili Update Made.Tropical Storm Warning Discontinued for Fl Keys & Bay.Region II Continues to Monitor Hurricane Lili & Resident Inspectors Onsite to Monitor Licensee Activities 1999-09-14
[Table view] |
Text
gal% REGgg (4 P
O UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303 Report Nos.:
50-250/78-22 and 50-251/78-22 Docket Nos.:
50-250 and 50-251 License Nos.:
DPR-31 and DPR-41 Licensee:
Florida Power and Light Company P. 0.
Box 529100 Miami, Florida 33152 Facility Name:
Turkey Point Plant Units 3 and
Inspection at:
Turkey Point Plant Homestead, Florida Florida Power and Light Company Miami, Florida Inspection conducted:
S ptember 12-15, 1978 Inspector:
A. L. Cunni ham Approved by J.
.
ufha En ronmenta F
Facilit e
Special Projects Section Materials Safety Branch Date Ins ection Sumna Ins ection on Se tember 12-15 1978 (Re ort Nos. 50-250/78-22 and 50-251/78"22 environmental protection program including management controls; environmental monitoring; environmental surveillance and assessment; plant reporting requirements; review of canal dilution test program; review and discussion plant intake coffer dam leakage; followup on previously identified enforcement items.
Inspection involved 30 inspector-hours on-site by one NRC inspector.
Results:
Of the seven areas inspected, no apparent items of noncompliance and deviations were identified in six areas.
One apparent item of non-coapliance was identified in one area (deficiency - periodic review of groundwater aonitoring schedule, Details I, paragraph 6.b).
781805 GZ qq
<<.'~)HS 4>>'
RII Rpt.
Nos. 50-250/78-22 and 50-251/78-22 DETAILS I Prepared by:
A. L. Cunningham, nvI ntal Scientist Environmental and Special Projects Section Fuel Facility and Materials Safety Branch Dates of Inspection:
S ptem r 12-15, 1978 Reviewed by J
W.
ufha e
Special Projects Safety Branch E
ironmental ection Fu 1 Facility and Materials ate 1.
Persons Contacted
- Y. M. Gaafer, Site Superintendent J. Hays, Plant Manager W. E. Abel, Assistant Supervisor, Monitoring and Research Ronald H. Hix, Senior Environmental Specialist-G. D. Whittier, Licensing Engineer
+J.
Pendland, Nuclear Licensing Engineer
- N. Ranek, Environmental Engineer
- Denotes those present at exit interview.
2.
Licensee Action on Previous Ins ection Findin s (Closed)
Noncompliance (77-09-01):
Reporting Requirements:
Licensee stated that records and analysis of the biological study identifying numbers and variety of fauna associated with the cooling canal banks as compared with the area surrounding the cooling canals which were neglected in previous semiannual reports, would be included in the report for the period ending June 30, 1977.
The licensee also stated that data prior to December 31, 1976, would be submitted separately by September 11, 1977.
The inspector reviewed semiannual and all interim reports for periods extending through June 30, 1978.
Inspection confirmed that faunistic studies were implemented and reported as required.
There were no questions regarding this item.
(Closed)
Noncompliance (77-9-02):
Baseline Terrestrial Ecological Reports.
The licensee stated that suamary reports of the baseline ecological studies, including the years 1975 and 1976 would be
RII Rpt. Nos. 50-250/78-22 and 50-251/78-22 I-2 completed by June 1,
1978.
The inspector reviewed the suamary report submitted.
There were no questions regarding this item.
3.
Unresolved Items No unresolved items were disclosed during this inspection.
4.
Mana ement Controls a
~
Section 5.0 of Appendix B Technical Specifications charges the licensee with responsibility for establishment, execution and review of programs to administer the Environmental Technical Specifications (ETS).
The specification further requires detailed written operating procedures and the establishment of organizational and administrative procedures that will provide for management review and independent audit functions to assure implementation of the ETS.
The inspector reviewed organizational responsibility for implementation of environmental monitoring, surveillance, and special studies programs defined in Appendix B
Technical Specifications.
Review of FPSL Corporate-Organization Environmental Affairs functions and detailed discussions with both licensee and licensee contractor representatives disclosed that program management and responsibilities appeared consistent with those requirements defined in the ETS.
b.
Section 5.1 of Appendix B Technical Specifications provides for periodic management review and independent audit of all requirements and conditions defined in the specifications.
The inspector reviewed the minutes and proceedings of meetings of the Company Environmental Review Group (CERG) for the period July, 1977 through August, 1978.
The inspector also reviewed and discussed with licensee representatives the Quality Assurance Report for Audit Nos.
QAA-LEP-77-1 (May 12 - June 28, 1977)
and QAA-LEP-78-1 (May 31 - August 8, 1978) which concerned the Environmental Engineering Department compliance with FPQ.
QA Manual QPs 4.4, 6.2, 17.1, and implementation of St. Lucie Unit
and Turkey Point Units 3 and 4 ETS.
Inspection disclosed that the licensee's review and audit programs appeared to meet all requirements of the above cited specification.
5.
Environmental Monitorin Appendix B Technical Specification 3.2 requires periodic monitoring of cooling water discharged from the licensed facility into Lake Warren for the following physicochemical parameters:
(1) daily: pH, DO, and salinity; (2) weekly:
NHg, BOD and COD; (3) monthly:
Cu, Zn, Co, hs, Hg.
The inspector reviewed monitoring proceduresy audited monitoring
RII Rpt.
Nos. 50-250/78-22 and 50-251/78-22 I-3 records for the period June, 1977 through August, 1978, and discussed the monitoring program with licensee representatives.
Inspection disclosed that all monitoring requirements were implemented as defined by the above cited specification.
6'.
Environmental Surveillance and Assessment Appendix B Technical Specification 4.0 requires implementation of an environmental surveillance and special study program to provide information for assessment of the impact of plant operation on the environment.
Section 4.A of the specification defines the conditions and requirements for aquatic surveillance.
Surveillance currently includes groundwater studies and biological monitoring of plankton, fish, benthos, and physicochemical characteristics of microbial activity in cooling canal soil sediments.
Section 4.B of the specification defines requirements for terrestrial surveillance which includes the following:
(1) baseline program; (2) impact studies; (3) revegetation of the cooling canal banks; (4) long-term monitoring.
b.
The inspector reviewed the licensee's aquatic surveillance program, including review of procedures, records, reports, and field data for the period June, 1977 through August, 1978.
The following specific areas were inspected:
(1) groundwater studies; (2) monthly plankton, fish and benthos monitoring; (3) semiannual monitoring of benthic organisms.
In the case of the groundwater study, defined in Appendix B Technical Specification 4.A.2.a, inspection disclosed that the licensee implemented a change in the review requirement without benefit of an approved amendment to the specification.
The specification required that the licensee review the groundwater monitoring schedule, on a quarterly basis, with the Central and Southern Florida Flood Control District (CSFFD) in consultation with the USGS.
The licensee changed the above cited review frequency to semiannual making it effective during the third quarter of calendar year 1977.
A licensee representative stated that a request for ETS revisions, including the change implemented above, was submitted to the NRC February 28, 1978; however, the request had not yet been acted upon by the NRC.
The inspector informed licensee representatives that failure to comply with the required review frequency, as stated in the subject specification, constituted an item of noncompliance (250/78-22-01, 251/78-22-01).
The inspector also informed licensee representatives that he would discuss the subject citation with his management upon return to, the Regional Office.
The inspector later contacted the licensee and informed them that NRC regional management concurred in the finding.
Since a change to the subject Technical Specification was requested by the licensee's
RII Rpt. Nos. 50-250/78-22 and 50-251/78-22 I
I-4 letter to the NRC Office of Nuclear Reactor Regulation dated February 28, 1978, no further response to this item is required.
It should be understood, however, that no revision is in accord with the Technical Soecification requirments unless and until it is specifically authorized by the NRC Office of Nuclear Reactor Regulation.
c
~
The inspector reviewed the licensee's terrestrial baseline program.
The program was designed to establish baseline conditions characteristic of the South Florida terrestrial ecosystem through a comprehensive three-year research effort to provide control information against which impact of the cooling canal system would be evaluated.
The study was initiated in March, 1973, and concluded in September, 1976.
The following requirements were included:
(1) definition of types and relative abundance of natural plant associations as a function of topography over a 10,000 acre tract of land which includes tidal, mangrove salt marshes, freshwater wetland, and dry land communities; (2)
kinds and abundance of native animals that live in association with the different plant communities; (3) experimental studies of selected parameters such as effects of soil physicochemical and I
microbial characteristics on occurrence of plant association groups.
Inspection disclosed that all elements of the program were implemented as required.
d.
The inspector reviewed the licensee's program on revegetation of the cooling canal banks, including review of procedures and records (period June, 1977 through August, 1978), discussions with personnel and observation of selected areas of the cooling canal system.
The following specific areas were inspected:
(1)
spoil bank erosion; (2) spoil bank vegetation; (3) physicochemical and nutrient analysis of spoil bank soils.
There were no questions regarding this item.
IP 7.
Plant Re ortin Re uirements Appendix B Technical Specification 5.4.a.
requires that the Semiannual Environmental Monitoring Report include records of monitoring require-ments surveys and samples, and an analysis of environmental data.
The inspector reviewed and audited the Semiannual Environmental Monitoring Report for the periods ending December 31, 1977 and June 30, 1978, to assess its compliance with the above cited specification.
Inspection disclosed that these reports were consistent with the requirements defined in subject specification.
Inspection also included a review of the report on the baseline ecological studies defined in Technical Specification 4.B.1.
There were no questions regarding these item RII Rpt.
Nos. 50-250/78-22 and 50-251/78-22 I-5 8.
S ecial Pro rams The inspector reviewed the status of the In-dilution Test Program.
This program was initiated on July 25, 1978, and involves infusion of water from Card Sound into the cooling canal system at an approximate rate of 300 cfs.
The program is designed to assess the effect of dilution on diminution of "scaling in the Units 1, 2, 3 and
condenser tubing.
At the time of inspection, effect of the test could not be assessed because of heavy rainfall during the test interval.
There were no questions regarding this item.
9.
Intake Canal Coffer Dam During the course of the inspection, the licensee reported that an opening was verified on September 12, 1978, in the intake dam structure separating the cooling canal system from the barge turning basin.
The opening resulted from a separation of the interlock between adjacent sections of barrier dam sheet piling.
Licensee representatives confirmed that some exchange of water was occurring.
through the opening under conditions of normal tidal fluctuations; e.g.,
under the low, low tidal cycle, maximum loss of water from the canal system to the basin was estimated at 68 cfs.
Minimal environ-mental impact was anticipated.
The licensee has initiated steps to repair the breach and submitted a nonroutine report to NRC Region II Director.
This incident and all mitigating actions will be reviewed during a subsequent inspe'ction.
10.
Exit Interview The inspector met with licensee representatives (denoted in paragraph 1) at the conclusion of the inspection on September 15, 1978.
The inspector suamarized the, scope of the inspection and discussed the findings listed herein.