February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR TURKEY POINT UNITS 3 & 4 -

REPORT 05000250/2023006 AND 05000251/2023006

Dear Bob Coffey:

The NRC has completed its end-of-cycle performance assessment of Turkey Point Units 3 & 4, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Turkey Point Units 3 & 4 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4628 with any questions you have regarding this letter.

Sincerely, David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41 Enclosure:

Turkey Point Activity/Inspection Plan (3/1/2024 - 12/31/2025)

cc:

w/ encl: Distribution via LISTSERV Signed by Dumbacher, David on 02/28/24

ML24053A045

Site Inspection Activity Plan Prepared on 2/21/2024 1:58:52 PM 1 of 3 Turkey Point 03/01/2024 - 12/31/2025 FOCUSED ENGINEERING INSPECTION (AGE-RELATED)

3,4 3/4/2024 3/8/2024 IP 71111.21N.04 001832 Age-Related Degradation 3,4 3/18/2024 3/22/2024 IP 71111.21N.04 001832 Age-Related Degradation FPL CORPORATE SECURITY INSPECTION AA/FFD

3,4 4/15/2024 4/18/2024 IP 71130.01 000733 Access Authorization 3,4 4/15/2024 4/18/2024 IP 71130.08 000740 Fitness-For-Duty Program SECURITY BASELINE INSPECTION

3,4 5/20/2024 5/23/2024 IP 71130.01 000733 Access Authorization 3,4 5/20/2024 5/23/2024 IP 71130.02 000734 Access Control 3,4 5/20/2024 5/23/2024 IP 71130.08 000740 Fitness-For-Duty Program 3,4 5/20/2024 5/23/2024 IP 71130.09 001656 Security Plan Changes 3,4 5/20/2024 5/23/2024 IP 71151 001338 Performance Indicator Verification COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)

3,4 6/10/2024 6/14/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 3,4 6/24/2024 6/28/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection TURKEY 3,4 POINT INITIAL EXAM 7/8/2024 7/12/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3,4 8/11/2024 8/24/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

MATERIAL CONTROL AND ACCOUNTING

3,4 7/15/2024 7/19/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION

3,4 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 10/21/2024 10/25/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 3,4 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification UNIT 3 IN-SERVICE INSPECTION

3 10/28/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

SECURITY BASELINE INSPECTION

3,4 1/27/2025 1/30/2025 IP 71130.02 000734 Access Control 3,4 1/27/2025 1/30/2025 IP 71130.05 000737 Protective Strategy Evaluation 3,4 1/27/2025 1/30/2025 IP 71130.09 001656 Security Plan Changes 3,4 1/27/2025 1/30/2025 IP 71151 001338 Performance Indicator Verification Unit Start End Activity CAC Title Staff Count OPERATION OF AN ISFSI

3,4 11/4/2024 11/8/2024 IP 60855 001001 Operation Of An ISFSI

Site Inspection Activity Plan Prepared on 2/21/2024 1:58:52 PM 2 of 3 EMERGENCY PREPAREDNESS EXERCISE INSPECTION

3,4 2/10/2025 2/14/2025 IP 71114.01 000716 Exercise Evaluation 3,4 2/10/2025 2/14/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3,4 2/10/2025 2/14/2025 IP 71151 001397 Performance Indicator Verification RP OCCUPATIONAL RADIATION SAFETY BASELINE INSPECTION

3,4 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 3/3/2025 3/7/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 3/3/2025 3/7/2025 IP 71124.04 000728 Occupational Dose Assessment 3,4 3/3/2025 3/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 3/3/2025 3/7/2025 IP 71151 000746 Performance Indicator Verification 3,4 3/31/2025 4/4/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 3/31/2025 4/4/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 3/31/2025 4/4/2025 IP 71124.04 000728 Occupational Dose Assessment 3,4 3/31/2025 4/4/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 3/31/2025 4/4/2025 IP 71151 000746 Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION +SG

SECURITY BASELINE INSPECTION

3,4 5/19/2025 5/22/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 3,4 5/19/2025 5/22/2025 IP 71130.07 000739 Security Training FOCUSED ENGINEERING INSPECTION (FPTI)

3,4 6/2/2025 6/6/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

3,4 6/16/2025 6/20/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

PROBLEM IDENTIFICATION AND RESOLUTION

3,4 7/14/2025 7/18/2025 IP 71152B 000747 Problem Identification and Resolution 3,4 7/28/2025 8/1/2025 IP 71152B 000747 Problem Identification and Resolution CYBER SECURITY INSPECTION

3,4 8/4/2025 8/8/2025 IP 71130.10 000741 Cybersecurity TURKEY POINT INITIAL EXAM

3,4 7/13/2025 7/19/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

3,4 8/17/2025 8/30/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

TURKEY POINT REQUAL INSPECTION

PREOPERATIONAL TESTING OF AN ISFSI

3,4 10/13/2025 10/24/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations 3,4 11/3/2025 11/21/2025 IP 60854 001000 Preoperational Testing Of An ISFSI

3/10/2025 3/21/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

3,4 10/6/2025 10/10/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Site Inspection Activity Plan Prepared on 2/21/2024 1:58:52 PM 3 of 3 TARGET SET INSPECTION

3,4 11/3/2025 11/7/2025 IP 71130.14 000743 Review of Power Reactor Target Sets