IR 05000250/2024002
| ML24207A249 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/01/2024 |
| From: | Renee Taylor NRC/RGN-II/DRP/RPB3 |
| To: | Coffey B Florida Power & Light Co |
| References | |
| IR 2024002 | |
| Download: ML24207A249 (12) | |
Text
SUBJECT:
TURKEY POINT UNITS 3 & 4 - INTEGRATED INSPECTION REPORT 05000250/2024002 AND 05000251/2024002
Dear Bob Coffey:
On June 30, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Turkey Points Unit 3 & 4. On July 16, 2024, the NRC inspectors discussed the results of this inspection with Carlos Santos, Organizational Effectiveness Site Director, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ryan C. Taylor, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000250 and 05000251
License Numbers:
Report Numbers:
05000250/2024002 and 05000251/2024002
Enterprise Identifier:
I-2024-002-0028
Licensee:
Florida Power & Light Company
Facility:
Turkey Point Units 3 & 4
Location:
Homestead, FL 33035
Inspection Dates:
April 01, 2024 to June 30, 2024
Inspectors:
A. Donley, Senior Resident Inspector
A. Knotts, Resident Inspector
Approved By:
Ryan C. Taylor, Chief
Reactor Projects Branch 3
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at TURKEY POINT UNITS 3 & 4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
Type Issue Number Title Report Section Status LER 05000250/2024-002-00 LER 2024-002-0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications 71153 Closed LER 05000250/2024-002-01 LER 2024-002-01 for Turkey Point Unit 3, Condition Prohibited by Technical Specifications 71153 Closed
PLANT STATUS
Unit 3 and 4 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions, on May 30, 2024, prior to the onset of hurricane season for the following systems:
- Intake structure and unit 3 and 4 intake cooling water pumps
- Unit 3 and 4 start-up, main, and auxiliary transformer areas and the switchyard
- Unit 3 and 4 emergency diesel generator (EDG) building areas
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Fire Zones 53 and 54, Unit 3 safety injection pump room and component cooling water pump and heat exchanger area on April 11, 2024
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire brigade training and performance during an actual event where the fire brigade responded to reports of acrid odor and haze in the 3B motor control center room on April 22, 2024.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during entry into 0-ONOP-16.10, Safe Shutdown Manual Actions, due to reported acrid odor and haze in the 3B motor control center room and investigation of the resulting power supply issue to the rod control cabinets on April 22,2024.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator continuing training 2024 annual exam scenario 2 on May14, 2024.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) AR 2484782, 125 VDC vital batteries following spare battery bank, D52, failure of 18-month surveillance test on April 24, 2024, review completed June 13, 2024 (2)the most recent 10 CFR 50.65(a)(3) periodic assessment, for the period of February 27, 2022, to March 10, 2023, on June 14, 2024
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) High risk associated with emergent work due to failed signal line conditioner of Unit 4 turbine control valve 4, LDVT-1, on May 14, 2024.
- (2) Unit 3 leading edge flow meter replacement and power calorimetric compensatory measures on June 20, 2024
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) AR 02483150, 4B EDG locked in trouble alarm without subsequent trip
- (2) AR 02481423, Unit 3 channel A qualified safety parameter display system (QSPDS)failed
- (3) AR 02485045, pressurizer code safety relief valve failed as found testing at vendor facility
- (4) AR 02488628, auxiliary feedwater pump A main oil pump suction level gauge empty
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) EC 299634, removal of the solatron line voltage regulator from the main control power feed to the unit 3 rod control system, following emergent failure on April 22, 2024
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)
- (1) WO 40937262, replacement of pressure switch, PS-4-6686B, due to locked in piston cooling oil low pressure alarm on 4B EDG
- (2) WO 40886228, 4A emergency containment cooler outlet, CV-4-2907, pilot lock up valve replacement
- (3) WO 40975857, restoration and service testing of 125 VDC spare battery, D52, following failure of cell #13
Surveillance Testing (IP Section 03.01) (3 Samples)
(1)4-OSP-024.2, Emergency Bus Load Sequencers Manual Test, on April 17, 2024 (2)0-SME-003.04, 125 VDC Station Battery Maintenance, on June 14, 2024 (3)3-SMI-041.01A, F-3-414 RCS Flow Channel Operational Test Loop A, Protection Set I, on June 12, 2024
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
- (1) WO 40880801, 4B containment spray (CS) pump comprehensive full flow in-service test, on May 01, 2024
Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)
- (1) Unit 3 and 4 reactor coolant system leak rate calculation, due to elevated leakage from degraded reactor coolant pump seals, on April 19, 2024
Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)
- (1) WO 40888630, annual full load test of PDG-3, FLEX 480 V portable diesel generator
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===
- (1) Unit 3 (April 1, 2023 through March 31, 2024)
- (2) Unit 4 (April 1, 2023 through March 31, 2024)
BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)
- (1) Unit 3 (April 1, 2023 through March 31, 2024)
- (2) Unit 4 (April 1, 2023 through March 31, 2024)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) AR 2481751, technical specification bases section B 3.3.3 change and associated 50.59 screening
- (2) AR 2480087, issue investigation for 4B steam generator steam flow indicator, FI-4-484, failed high
71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)
- (1) The inspectors reviewed the licensees corrective action program to identify potential trends in fire protection that might be indicative of a more significant safety issue. A potential adverse trend was identified, and an observation is documented in the results section of this report.
71153 - Follow Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)
The inspectors evaluated the following licensees event reporting determinations to ensure it complied with reporting requirements.
- (1) LER 05000250/2024-002-00 and LER 05000250/2024-002-01, Condition Prohibited by Technical Specifications (ML24102A024 and ML24193A211)
The inspectors reviewed the LER and updated LER submittal. The associated inspection conclusions are documented in Inspection Report 05000250/2023004, under Inspection Results Section 71111.15, as NCV 05000250/2023004-02, Failure to Address Operability of the ECCS and Submit a 10 CFR 50.73 report. These LERs are Closed.
INSPECTION RESULTS
Observation: Adverse trend in fire protection 71152S The inspectors reviewed the licensee's corrective action program (CAP) for trends associated with implementation of fire protection program controls and equipment during a six-month period ending on June 30, 2024. There were 80 condition reports reviewed with the trend code Fire Pro and involved programmatic issues from longstanding open fire impairments, delayed detector testing, housekeeping, spurious alarms, actual fire brigade response, and equipment issues. Nine of these were NRC identified issues and one (AR 2478849) was considered a green NCV documented in the first quarter 2024 inspection report. The licensee identified an adverse trend (AR 2475859) in January, in the amount of open fire impairments and has made progress in fixing the equipment issues and closing more than half of the identified impairments. The licensee has also documented an adverse trend (AR 2489315) in sporadic deluge actuation, and final corrective actions to mitigate the adverse trend were in development.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On July 16, 2024, the inspectors presented the integrated inspection results to Mr.
Carlos Santos, Organizational Effectiveness Site Director and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
action requests
2483450, 2485553, 2485068, 2483302, 2473722,
Corrective Action
Documents
Resulting from
Inspection
action requests
2487396, 2487445
0-ADM-116
Hurricane Season Readiness
Procedures
Nuclear Division Storm Coordinator Procedure
Corrective Action
Documents
Resulting from
Inspection
action requests
2484679
Unit 3&4 Auxiliary Building
Fire Plans
Unit 3 and 4 Control Building
0-ADM-016.8
Pre-Fire Plan Standard Operating Procedures
0-ONOP-016.10
Safe Shutdown Manual Actions
Procedures
0-ONOP-016.8
Response to a Fire/Smoke Detection System Alarm
Drawings
5610-M401F-48
Sheet 13
Schematic Diagram Solid State Rod Control Power
0-EPIP-20101
Duties of the Emergency Coordinator
Procedures
3-ARP-097.CR.B
Control Room Response - Panel B
Corrective Action
Documents
action requests
2482333
5613-E-1605
Battery 3A & 3B Load Profiles
Drawings
5614-E-1605
Battery 4A & 4B Load Profile
Engineering
Changes
Engineering
Evaluations
JPN-PTN-SEEJ-
91-013
Engineering Evaluation for Performance of Load Profile
Testing of Safety Related Station Batteries
Miscellaneous
Maintenance
Rule Scope
Evaluation
System 003 - DC power System - Class 1E
8/16/2016
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
0-ADM-705
Battery Monitoring and Maintenance Program
0-SME-003.04
25VDC Station Battery Maintenance
11, 12
0-SME-003.15
Station Battery 60 Month Maintenance
Procedures
Maintenance Rule Program Administration
Work Orders
work orders
40958903, 40975957, 40886140, 40802386, 40695883,
40656463
Corrective Action
Documents
action requests
2486241
Miscellaneous
Operator Logs
6/17-6/20/2024
0-ADM-225
Online Risk Assessment and Management
2/24/2023
3-NOP-095.03
Distributed Control System (DCS/ERADS) Hardware and
Software Operations
3-OSP-059.5
Power Range Nuclear Instrumentation Shift Checks and
Daily Calibrations
Procedures
Work Activity Risk Management
Work Orders
work orders
40978185
Corrective Action
Documents
action requests
2482526, 02485377
Work Orders
work orders
40973262, 40970062, 40829789, 40981528
Corrective Action
Documents
action requests
2484679
Procedures
Standard Design Process
Work Orders
work orders
40975771
Corrective Action
Documents
action requests
2483150, 2484362, 2471032, 2473931, 2461913, 2484858,
2481398, 2483730, 2485394, 2484782
Corrective Action
Documents
Resulting from
Inspection
action requests
2488226, 2488328
0-ADM-705
Battery Monitoring and Maintenance Program
0-CME-003.1
Station Vital Battery Equalizing Charge
0-OSP-083.33
Periodic Testing of PDG-3, FLEX 480 V Portable Diesel
Generator
Procedures
0-SME-003.04
25 VDC Station Battery Maintenance
11, 12, 13
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
3-OSP-041.1
Reactor Coolant System Leak Rate Calculations
3-SMI-041.20
4-3-414 RCS Flow Channel Calibration Loop A, Protection
Set I
4-OSP-041.1
Reactor Coolant System Leak Rate Calculation
4-OSP-055.1
Emergency Containment Cooler Operability Test
4-OSP-068.5B
4B CS Pump Inservice Test
Work Orders
work orders
40886132, 40907565, 40977452, 40874716, 40886947,
40887026
Corrective Action
Documents
action requests
2461913, 2471032, 2473931, 2486526
Corrective Action
Documents
Resulting from
Inspection
action requests
2486612
Miscellaneous
Operator Logs
April 2023-March 2024
0-ADM-032
NRC Performance Indicators Turkey Point
71151
Procedures
CY-TP-102-0106
Determination of Reactor Coolant Activity
Corrective Action
Documents
action requests
2481423
Drawings
PTN-P-247068-
20
Main Steam System FT-4-484 Tubing Installation
Engineering
Changes
299453
Tubing Repairs at FT-4-484 per Spec-C-021
Work Orders
work orders
40087810, 40966442
Corrective Action
Documents
Resulting from
Inspection
action request
2489795