SUBJECT:

TURKEY POINT UNITS 3 & 4 - INTEGRATED INSPECTION REPORT 05000250/2024002 AND 05000251/2024002

Dear Bob Coffey:

On June 30, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Turkey Points Unit 3 & 4. On July 16, 2024, the NRC inspectors discussed the results of this inspection with Carlos Santos, Organizational Effectiveness Site Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ryan C. Taylor, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000250 and 05000251

License Numbers: DPR-31 and DPR-41

Report Numbers: 05000250/2024002 and 05000251/2024002

Enterprise Identifier: I-2024-002-0028

Licensee: Florida Power & Light Company

Facility: Turkey Point Units 3 & 4

Location: Homestead, FL 33035

Inspection Dates: April 01, 2024 to June 30, 2024

Inspectors: A. Donley, Senior Resident Inspector A. Knotts, Resident Inspector

Approved By: Ryan C. Taylor, Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at TURKEY POINT UNITS 3 & 4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000250/2024-002-00 LER 2024-002-0 for Turkey 71153 Closed Point, Unit 3 - Condition Prohibited by Technical Specifications

LER 05000250/2024-002-01 LER 2024-002-01 for Turkey 71153 Closed Point Unit 3, Condition Prohibited by Technical Specifications

PLANT STATUS

Unit 3 and 4 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions, on May 30, 2024, prior to the onset of hurricane season for the following systems:
  • Intake structure and unit 3 and 4 intake cooling water pumps
  • Unit 3 and 4 start-up, main, and auxiliary transformer areas and the switchyard

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zones 53 and 54, Unit 3 safety injection pump room and component cooling water pump and heat exchanger area on April 11, 2024

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an actual event where the fire brigade responded to reports of acrid odor and haze in the 3B motor control center room on April 22, 2024.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during entry into 0-ONOP-16.10, Safe Shutdown Manual Actions, due to reported acrid odor and haze in the 3B motor control center room and investigation of the resulting power supply issue to the rod control cabinets on April 22,2024.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator continuing training 2024 annual exam scenario 2 on May14, 2024.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) AR 2484782, 125 VDC vital batteries following spare battery bank, D52, failure of 18-month surveillance test on April 24, 2024, review completed June 13, 2024
(2) the most recent 10 CFR 50.65(a)(3) periodic assessment, for the period of February 27, 2022, to March 10, 2023, on June 14, 2024

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) High risk associated with emergent work due to failed signal line conditioner of Unit 4 turbine control valve 4, LDVT-1, on May 14, 2024.
(2) Unit 3 leading edge flow meter replacement and power calorimetric compensatory measures on June 20, 2024

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) AR 02483150, 4B EDG locked in trouble alarm without subsequent trip
(2) AR 02481423, Unit 3 channel A qualified safety parameter display system (QSPDS)failed
(3) AR 02485045, pressurizer code safety relief valve failed as found testing at vendor facility
(4) AR 02488628, auxiliary feedwater pump A main oil pump suction level gauge empty

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) EC 299634, removal of the solatron line voltage regulator from the main control power feed to the unit 3 rod control system, following emergent failure on April 22, 2024

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1) WO 40937262, replacement of pressure switch, PS-4-6686B, due to locked in piston cooling oil low pressure alarm on 4B EDG
(2) WO 40886228, 4A emergency containment cooler outlet, CV-4-2907, pilot lock up valve replacement
(3) WO 40975857, restoration and service testing of 125 VDC spare battery, D52, following failure of cell #13

Surveillance Testing (IP Section 03.01) (3 Samples)

(1) 4-OSP-024.2, Emergency Bus Load Sequencers Manual Test, on April 17, 2024
(2) 0-SME-003.04, 125 VDC Station Battery Maintenance, on June 14, 2024
(3) 3-SMI-041.01A, F-3-414 RCS Flow Channel Operational Test Loop A, Protection Set I, on June 12, 2024

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) WO 40880801, 4B containment spray (CS) pump comprehensive full flow in-service test, on May 01, 2024

Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) Unit 3 and 4 reactor coolant system leak rate calculation, due to elevated leakage from degraded reactor coolant pump seals, on April 19, 2024

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) WO 40888630, annual full load test of PDG-3, FLEX 480 V portable diesel generator

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===

(1) Unit 3 (April 1, 2023 through March 31, 2024)
(2) Unit 4 (April 1, 2023 through March 31, 2024)

BI02: RCS Leak Rate Sample (IP Section 02.11) (2 Samples)

(1) Unit 3 (April 1, 2023 through March 31, 2024)
(2) Unit 4 (April 1, 2023 through March 31, 2024)

===71152A - Annual Follow-up Problem Identification and Resolution

Annual Follow-up of Selected Issues (Section 03.03)===

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) AR 2481751, technical specification bases section B 3.3.3 change and associated 50.59 screening
(2) AR 2480087, issue investigation for 4B steam generator steam flow indicator, FI-4-484, failed high

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program to identify potential trends in fire protection that might be indicative of a more significant safety issue. A potential adverse trend was identified, and an observation is documented in the results section of this report.

71153 - Follow Up of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensees event reporting determinations to ensure it complied with reporting requirements.

(1) LER 05000250/2024-002-00 and LER 05000250/2024-002-01, Condition Prohibited by Technical Specifications (ML24102A024 and ML24193A211)

The inspectors reviewed the LER and updated LER submittal. The associated inspection conclusions are documented in Inspection Report 05000250/2023004, under Inspection Results Section 71111.15, as NCV 05000250/2023004-02, Failure to Address Operability of the ECCS and Submit a 10 CFR 50.73 report. These LERs are Closed.

INSPECTION RESULTS

Observation: Adverse trend in fire protection 71152S The inspectors reviewed the licensee's corrective action program (CAP) for trends associated with implementation of fire protection program controls and equipment during a six-month period ending on June 30, 2024. There were 80 condition reports reviewed with the trend code Fire Pro and involved programmatic issues from longstanding open fire impairments, delayed detector testing, housekeeping, spurious alarms, actual fire brigade response, and equipment issues. Nine of these were NRC identified issues and one (AR 2478849) was considered a green NCV documented in the first quarter 2024 inspection report. The licensee identified an adverse trend (AR 2475859) in January, in the amount of open fire impairments and has made progress in fixing the equipment issues and closing more than half of the identified impairments. The licensee has also documented an adverse trend (AR 2489315) in sporadic deluge actuation, and final corrective actions to mitigate the adverse trend were in development.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 16, 2024, the inspectors presented the integrated inspection results to Mr.

Carlos Santos, Organizational Effectiveness Site Director and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Corrective Action action requests 2483450, 2485553, 2485068, 2483302, 2473722,

Documents

Corrective Action action requests 2487396, 2487445

Documents

Resulting from

Inspection

Procedures 0-ADM-116 Hurricane Season Readiness 34

EP-SR-1001 Nuclear Division Storm Coordinator Procedure 21

71111.05 Corrective Action action requests 02484679

Documents

Resulting from

Inspection

Fire Plans PFP-AB-18 Unit 3&4 Auxiliary Building 02

PFP-CB-18 Unit 3 and 4 Control Building 1

Procedures 0-ADM-016.8 Pre-Fire Plan Standard Operating Procedures 1

0-ONOP-016.10 Safe Shutdown Manual Actions 10

0-ONOP-016.8 Response to a Fire/Smoke Detection System Alarm 27

71111.11Q Drawings 5610-M401F-48 Schematic Diagram Solid State Rod Control Power 6

Sheet 13

Procedures 0-EPIP-20101 Duties of the Emergency Coordinator 35

3-ARP-097.CR.B Control Room Response - Panel B 20

71111.12 Corrective Action action requests 2482333

Documents

Drawings 5613-E-1605 Battery 3A & 3B Load Profiles 20

5614-E-1605 Battery 4A & 4B Load Profile 20

Engineering EC 270569 1

Changes

Engineering JPN-PTN-SEEJ-Engineering Evaluation for Performance of Load Profile 1

Evaluations91-013 Testing of Safety Related Station Batteries

Miscellaneous Maintenance System 003 - DC power System - Class 1E 8/16/2016

Rule Scope

Evaluation

Inspection Type Designation Description or Title Revision or

Procedure Date

Procedures 0-ADM-705 Battery Monitoring and Maintenance Program 0

0-SME-003.04 125VDC Station Battery Maintenance 11, 12

0-SME-003.15 Station Battery 60 Month Maintenance 16

ER-AA-100-2002 Maintenance Rule Program Administration 15

Work Orders work orders 40958903, 40975957, 40886140, 40802386, 40695883,

40656463

71111.13 Corrective Action action requests 2486241

Documents

Miscellaneous Operator Logs 6/17-6/20/2024

Procedures 0-ADM-225 Online Risk Assessment and Management 02/24/2023

3-NOP-095.03 Distributed Control System (DCS/ERADS) Hardware and 17

Software Operations

3-OSP-059.5 Power Range Nuclear Instrumentation Shift Checks and 13

Daily Calibrations

WM-AA-100-1000 Work Activity Risk Management 25

Work Orders work orders 40978185

71111.15 Corrective Action action requests 02482526, 02485377

Documents

Work Orders work orders 40973262, 40970062, 40829789, 40981528

71111.18 Corrective Action action requests 2484679

Documents

Procedures EN-AA-205-1104 Standard Design Process 2

Work Orders work orders 40975771

71111.24 Corrective Action action requests 2483150, 2484362, 2471032, 2473931, 2461913, 2484858,

Documents 2481398, 2483730, 2485394, 2484782

Corrective Action action requests 2488226, 2488328

Documents

Resulting from

Inspection

Procedures 0-ADM-705 Battery Monitoring and Maintenance Program 0

0-CME-003.1 Station Vital Battery Equalizing Charge 2

0-OSP-083.33 Periodic Testing of PDG-3, FLEX 480 V Portable Diesel 8

Generator

0-SME-003.04 125 VDC Station Battery Maintenance 11, 12, 13

Inspection Type Designation Description or Title Revision or

Procedure Date

3-OSP-041.1 Reactor Coolant System Leak Rate Calculations 17

3-SMI-041.20 4-3-414 RCS Flow Channel Calibration Loop A, Protection 7

Set I

4-OSP-041.1 Reactor Coolant System Leak Rate Calculation 20

4-OSP-055.1 Emergency Containment Cooler Operability Test 21

4-OSP-068.5B 4B CS Pump Inservice Test 18

Work Orders work orders 40886132, 40907565, 40977452, 40874716, 40886947,

40887026

71151 Corrective Action action requests 2461913, 2471032, 2473931, 2486526

Documents

Corrective Action action requests 2486612

Documents

Resulting from

Inspection

Miscellaneous Operator Logs April 2023-March 2024

Procedures 0-ADM-032 NRC Performance Indicators Turkey Point 14

CY-TP-102-0106 Determination of Reactor Coolant Activity 9

71152A Corrective Action action requests 2481423

Documents

Drawings PTN-P-247068-Main Steam System FT-4-484 Tubing Installation 2

20

Engineering 299453 Tubing Repairs at FT-4-484 per Spec-C-021 0

Changes

Work Orders work orders 40087810, 40966442

71153 Corrective Action action request 2489795

Documents

Resulting from

Inspection

10