Partially Withheld Insp Repts 50-250/97-09 & 50-251/97-09 on 970825-26.No Violations Noted.Major Areas Inspected: Insp Conducted in Area of Plant Support by Regional Safeguards Specialists
ML20217E593
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/26/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20217E562 List:
References
50-250-97-09, 50-250-97-9, 50-251-97-09, 50-251-97-9, NUDOCS 9710070096
Download: ML20217E593 (2)


Text

- U. S. NUCLEAR REGULATORY COMMISSION REGION 11 Docket Nos: 50 250/251 License Nos: DPR-31 and DPR 41 Report No: 50 250/251/97-09 Licensee: Florida Power & Ught Company Facility: Turkey Point Nuclear Plant Location: 925 West Flager Street l Miami, FL 33102 Dates: August 25 26,1997 Inspectors: D. Thompson, Safeguards Inspector L. Stratton, Safeguards inspector Approved by: Caudle A. Julian, Acting Chief SpecialInspection Branch Division of Reactor Projects 9710070096 970926 PDR ADOCK 05000250 G PDR Documentteneminedharemeh e- -

" * ' " * ' * ' "

  • ~~ --

-

-

-

- .. .

. . _ _ _ _

o

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _

,

. EXECUTIVE SUMMARY Turkey Point Nuclear Plant NRC Inspection Report 50 250/251/97-09 This routine announced inspection was conducted in the area of plant support by regional safeguards specialists. The specific area evaluated was the Malevolent Use of Vehicles at Nuclear Power Plant e The inspector concluded that the vehicle barrier system, using a combination of steel cables, gates, concrete barriers, barrier post, bollards (fixed and removable),

buildings and terrain, was an acceptable barrior' capable of stopping a design basis vehicle traveling at the establishea speed prior to the vehicle penetrating the l- protected area perimeter and causing damage to vital equipment. (S2.5.1)

e The inspector determined that the licensee had installed the vehicle barrier at a distance that would preclude an explosion from a bomb-laden vehicle from causing damage to vital targets required for the safe shutdown of the reactor. (S2.5.2)

e Based on the inspector's review of the vehicle barrier system procedures and in discussion with the licensee, the inspector concluded that the plans and procedures were acceptable for implementing the vehicle barrier system. (S2.5.3)