IR 05000250/1995023

From kanterella
Jump to navigation Jump to search
Insp Repts 50-250/95-23 & 50-251/95-23 on 951211-15.No Violations Noted.Major Areas Inspected:Emergency Plan, Emergency Facilities,Organization & Mgt Control,Independent & Internal Reviews/Audits & Training
ML17353A531
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/04/1996
From: Barr K, Sartor W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17353A530 List:
References
50-250-95-23, 50-251-95-23, NUDOCS 9601190286
Download: ML17353A531 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET. N.W., SUITE 2900 ATLANTA,GEORGIA 303234199 Report Nos.:

50-250/95-23 and 50-251/95-23 Licensee:

Florida Power and Light Company 9250 West Flagler Street Miami, FL 33102 Docket Nos.:

50-250 and 50-251 License Nos.:

DPR-31 and DPR-41 Facility Name:

Turkey Point Plant Units 3 and

Inspection Conducted:

December 11-15, 1995 Inspector:

Wi iam M.

S rtor, r.

Ra

'

Specia ist Da e S gne Approved by:

nneth

.

Ba r, Plant Support Branch Division of Reactor Safety D te igned SUMMARY Scope:

This routine, announced inspection was conducted to assess the operational readiness of the site emergency preparedness program through selective review of the following programmatic areas:

(1) Emergency Plan and implementing procedures; (2) emergency facilities, equipment, Instrumentation, and supplies; (3) organization and management control; (4} independent and internal reviews/audits; and (5) training.

Results:

No violations or deviations were identified.

The emergency preparedness program was being maintained in a state of operational readiness.

A program strength was the licensee's hurricane preparedness whereas a program challenge was the maintenance of a sound program during the transitional learning period of the newly assigned Emergency Preparedness Coordinator and Emergency Preparedness Analyst.

960ii90286

'F60104 PDR ADOCK 05000250

PDR Enclosure

REPORT DETAILS Persons Contacted 2.

Licensee Employees

  • T. Abbatiello, Site guality Manager G. Blinde, Operations Continuing Training Supervisor
  • L. George, Project Manager
  • R. Hovey, Site Vice President
  • D. Jernigan, Plant Manager
  • H. Johnson, Operations Manager
  • V. Kaminskas, Services Manager
  • J. Kirkpatrick, Fire Protection/Safety Supervisor
  • J. Knoor, Regulation and Compliance Specialist
  • R. Kundalkar, Engineering Manager
  • F. Harcussen, Plant Security Supervisor
  • R. Hothena, Manager, Emergency Preparedness-Juno
  • D. Rose, Materials Hanager D. Taylor, Simulator Instructor Other licensee employees contacted during this inspection included operators, engineers, security force members, and administrative personnel.

Nuclear Regulatory Commission B. Desai, Resident Inspector

  • S. Caudill, Office of Nuclear Material Safety and Safeguards
  • Attended exit interview on December 15, 1995 An index of abbreviations used throughout this report will be found in the last paragraph Emergency Plan and Implementing Procedures (82701)

This area was inspected to determine whether significant changes were made in the licensee's emergency preparedness program since the last inspection of this area was performed and to assess the impact of any such changes on the overall state of emergency preparedness at the facility, and to determine whether the licensee"s actions in response to actual emergencies were in accordance with the Emergency Plan and its implementing procedures.

Requirements applicable to this area are found in 10 CFR 50 '7(b)(16),

CFR 50.54(q),

Appendix E to 10 CFR Part 50, and the licensee's Emergency Plan.

The inspector reviewed the licensee's system for making changes to the Emergency Plan and its Implementing Procedures.

Through selective review of applicable documents, the inspector determined that a total of four revised Emergency Plans (since July 21, 1993)

and 26 revised EPIPs (since August 3, 1993)

had been reviewed, approved, and distributed in accordance Enclosure

with approved licensee procedures and NRC requirements before implementation.

The current Emergency Plan in use was Revision 28, dated u~cember 3, 1994.

The inspector reviewed the licensee's documentation of emergency declarations made on March 10, 1994 and July 31, 1995.

Both declarations were NOUEs with the first being for required shutdown due to pressure boundary leakage, and the second for a confirmed hurricane warning.

In both cases the declarations and required notifications had been made in a timely fashion.

No violations or deviations were identified.

Emergency Facilities, Equipment, Instrumentation, and Supplies (82701)

This area was inspected to determine whether the licensee's ERFs and associated equipment, instrumentation, and supplies were maintained in a state of operational readiness, and to assess the impact of any changes in this area upon the emergency preparedness program.

Requirements applicable to this area are found in 10 CFR 50.47(b)(8)

and (9), Sections IV.E and VI of Appendix E to

CFR Part 50, and the licensee's Emergency Plan.

The inspector made selective reviews of emergency response facilities and equipment to assess their current status.

Facility reviews focused on the TSC and the EOF.

A walk-through of the dedicated TSC found the facility and its equipment to be maintained in a state of operational readiness.

Equipment upgrades in the TSC were the electronic status boards which had recently been installed.

The EOF was a dedicated facility located on the 5th Floor of the FP&L General Office Building at 9250 W. Flagler in Miami.

Since the last inspection equipment upgrades in the EOF were the updated electronic equipment for the State Hot Ring-Down System, and the addition of multiple radio communication systems to include VHF, UHF, 900 mHz trunking, and hi-frequency single sideband.

Additionally, installation was in progress for a new State satellite based communication/notification system.

No violations or deviations were identified.

Organization and Management Control (82701)

This area was inspected to determine the effects of any changes in the licensee's emergency organization and/or management control systems on the emergency preparedness program, and to verify that any such changes were properly factored into the Emergency Plan and EPIPs.

Requirements applicable to this area are found in 10 CFR 50.47(b)(1)

and (16),Section IV.A of Appendix E to 10 CFR Part 50, and the licensee's Emergency Plan.

The organization and management of the emergency preparedness program were reviewed and discussed with licensee representatives.

Significant changes that had occurred in the management of the emergency preparedness program were the recent assignment of the new Emergency Preparedness Coordinator (effective October 16, 1995)

and Emergency Preparedness Enclosure

Analyst.

The new Coordinator's experience is primarily health physics.

Although there will be a period of learning to ~aintain a good understanding of the program and its requirements, management supervision to keep the program on track was present.

The Fire Protection Safety Supervisor who supervises the emergency preparedness program was previously a emergency preparedness coordinator for three years.

The observations made during the inspection indicated that the Fire Protection Safety Supervisor was spending more time with the emergency preparedness program to insure a smooth transition.

The inspector discussed the status of offsite interfaces with the Emergency Preparedness Coordinator.

Recent changes in offsite personnel included the new Director, Office of Emergency Hanagement, Dade County and the new REP Coordinator.

Frequent interactions were occurring and the licensee indicated a good working relationship was in place with the new personnel.

No violations or deviations were identified.

Independent and Internal Reviews/Audits (82701)

This area was inspected to determine whether the licensee had performed an independent audit of the emergency preparedness program, and whether the emergency planning staff had conducted a review of the Emergency Plan and the EPIPs.

Requirements applicable to this area are found in 10 CFR 50.54(t)

and the licensee's Emergency Plan.

The inspector reviewed the 1993-1995 annual audits of both the Turkey Point and Juno Beach guality Assurance Departments.

The audit reports met the requirements for an independent audit of the emergency preparedness program, The audits were thorough in selected areas and included recommendations where appropriate.

An initiative that resulted in improved interface with local governments was well documented in Audit No:

gAS-EHP-93-3, which addressed the favorable response by Dade and Honroe Radiological Emergency Preparedness Hanagement to the FPL representatives provided to the County EOCs during the annual exercise.

The representative in the County EOC provided technical briefings and answered questions from the County staffs.

Another observation of significant substance was identified in Audit No: gAO-PTN-95-006.

The observation stressed the desirability to insure all emergency responders are given the opportunity to participate in a practice drill because the lack of position specific training for positions unique to the Emergency Plan suggests that participating in emergency response practice exercises is the only other way that personnel have to become familiar with their emergency response duties.

No violations or deviations were identified.

Training (82701)

This area was inspected to determine whether the licensee's emergency response personnel were properly trained and understood their emergency responsibilities.

Enclosure

,

Selective review of the training program consisted of observing a unit crew's response to a simulated accident during

~ simulator drill.

The inspector noted that the crew responded correctly and promptly in identifying and classifying the emergency action levels encountered.

No violations or deviations were identified.

7.

Exit Interview (82701)

The inspection scope and results were summarized on December 15, 1995, with those persons indicated in Paragraph 1.

The inspector described the areas inspected and discussed observations made.

No proprietary information in contained in this report.

Dissenting comments were not received from the licensee.

8.

Abbreviations CFR EOC EOF EPIP NOUE REP TSC Code of Federal Regulations Emergency Operations Center Emergency Ope} ations Facility Emergency Plan Implementing Procedure Notification of Unusual Event Radiological Emergency Plan Technical Support Center Enclosure