MONTHYEARIR 05000250/20240032024-11-13013 November 2024 Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 IR 05000250/20240022024-08-0101 August 2024 Integrated Inspection Report 05000250/2024002 and 05000251/2024002 IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24072A2382024-03-20020 March 2024 Review of the Fall 2023 Steam Generator Tube Inspections During Refueling Outage No. 33 IR 05000250/20244202024-03-11011 March 2024 – Security Baseline Inspection Report 05000250/2024420 and 05000251/2024420 - Final IR 05000250/20230062024-02-28028 February 2024 Annual Assessment Letter for Turkey Point Units 3 & 4 - Report 05000250/2023006 and 05000251/2023006 IR 05000250/20240112024-02-15015 February 2024 Notification of Turkey Point Nuclear Generating Station - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000250/2024011 and 05000251/2024011 IR 05000250/20230042024-02-13013 February 2024 Integrated Inspection Report 05000250/2023004 and 05000251/2023004 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 IR 05000250/20230032023-11-0909 November 2023 – Integrated Inspection Report 05000250/2023003 and 05000251/2023003 IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 IR 05000250/20234022023-06-12012 June 2023 – Security Baseline Inspection Report 05000250/2023402 and 05000251/2023402 IR 05000250/20230012023-05-12012 May 2023 – Integrated Inspection Report 05000250/2023001 and 05000251/2023001 IR 05000250/20220062023-03-0101 March 2023 Annual Assessment Letter for Turkey Point, Units 3 & 4 (Report 05000250/2022006 and 05000251/2022006) IR 05000250/20220042023-01-27027 January 2023 – Integrated Inspection Report 05000250/2022004 and 05000251/2022004 IR 05000250/20220112022-12-20020 December 2022 – Design Basis Assurance Inspection (Programs) Inspection Report 05000250/2022011 and 05000251/2022011 IR 05000250/20220102022-11-29029 November 2022 Triennial Fire Protection Inspection Report 05000250/2022010 and 05000251/2022010 IR 05000250/20224022022-11-0707 November 2022 Security Baseline Inspection Report 05000250 2022402 and 05000251 2022402 IR 05000250/20220032022-10-31031 October 2022 Integrated Inspection Report 05000250/2022003 and 05000251/2022003 ML22286A1262022-10-28028 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections During Refueling Outage No. 32 IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 IR 05000250/20220052022-08-26026 August 2022 Updated Inspection Plan for Turkey Point Units 3 & 4 Report 05000250 2022005 and 05000251 2022005-Final IR 05000250/20233012022-08-25025 August 2022 Notification of Licensed Operator Initial Examination 05000250/2023301, and 05000251/2023301 ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) IR 05000250/20220022022-08-12012 August 2022 Integrated Inspection Report 05000250/2022002 and 05000251/2022002 IR 05000250/20220012022-05-11011 May 2022 Integrated Inspection Report 05000250/2022001 and 05000251/2022001 L-2022-072, Steam Generator Tube Inspection Report2022-05-0606 May 2022 Steam Generator Tube Inspection Report IR 05000250/20224012022-03-0808 March 2022 Security Baseline Inspection Report 05000250/2022401 and 05000251/2022401(U) IR 05000250/20210062022-03-0202 March 2022 Annual Assessment Letter for Turkey Point, Units 3 and 4 (Report No. 05000250/2021006 and 05000251/2021006) IR 05000250/20210042022-02-0202 February 2022 Integrated Inspection Report 05000250/2021004 and 05000251/2021004 IR 05000250/20210032021-11-0303 November 2021 Integrated Inspection Report 05000250/2021003 and 05000251/2021003 IR 05000250/20210072021-11-0303 November 2021 Follow-Up Assessment Letter Report 05000250/2021007 IR 05000250/20210402021-09-30030 September 2021 95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040 IR 05000250/20210052021-08-25025 August 2021 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2021005 and 05000251/2021005) IR 05000250/20210022021-08-0404 August 2021 Integrated Inspection Report 05000250/2021002 and 05000251/2021002 IR 07200062/20210012021-07-21021 July 2021 Operation of an Independent Spent Fuel Storage Installation Report 07200062/2021001 IR 05000250/20214012021-06-11011 June 2021 Security Baseline Inspection Report 05000250/2021401, 05000251/2021401, and 07200062/2021401 IR 05000250/20210012021-05-0707 May 2021 Integrated Inspection Report 05000250/2021001 and 05000251/2021001 and Assessment Follow-Up Letter IR 05000250/20210122021-05-0505 May 2021 Biennial Problem Identification and Resolution Inspection Report 05000250/2021012 and 05000251/2021012 IR 05000250/20214202021-04-29029 April 2021 Security Baseline Inspection Report 05000250/2021420 and 05000251/2021420 Cover Letter IR 05000250/20213012021-04-10010 April 2021 NRC Operator License Examination Report 05000250/2021301 and 05000251/2021301 IR 05000250/20210902021-04-0606 April 2021 Notice of Violation and Proposed Imposition of Civil Penalty $150,000, NRC Inspection Report Nos.05000250/2021090 and 05000251/2021090; Investigation Report Nos. 2-2019-011 and 2-2019-025 Exercise of Enforcement Discretion IR 05000250/20200062021-03-0303 March 2021 Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006 IR 05000250/20210102021-02-26026 February 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000250/2021010 and 05000251/2021010 IR 05000250/20204022021-02-12012 February 2021 Material Control and Accounting Program Inspection Report 05000250/2020402 and 05000251/2020402 Public Version (Cover Letter Only) 2024-08-23
[Table view] Category:Letter
MONTHYEARIR 05000250/20240032024-11-13013 November 2024 Integrated Inspection Report - 05000250/2024003 & 05000251/2024003 & Notice of Violation L-2024-187, Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-11-12012 November 2024 Supplement to the Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-188, Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-11-12012 November 2024 Supplement to License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24305A1482024-11-0606 November 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 ML24276A2162024-11-0101 November 2024 Request for Withholding Information from Public Disclosure L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 2024-09-25
[Table view] |
Text
SUBJECT:
TURKEY POINT NUCLEAR PLANT, UNITS 3 & 4 - SECURITY BASELINE INSPECTION REPORT 05000250/2024401, 05000251/2024401 AND 07200062/2024401
Dear Bob Coffey:
On May 23, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Turkey Point Nuclear Plant, Units 3 & 4 and discussed the results of this inspection with Michael Strope and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000250, 05000251 and 07200062 License Nos. DPR-31 and DPR-41
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000250, 05000251 and 07200062 License Numbers:
DPR-31 and DPR-41 Report Numbers:
05000250/2024401, 05000251/2024401, and 07200062/2024401 Enterprise Identifier:
I-2024-401-0050 and I-2024-401-0051 Licensee:
Florida Power & Light Company Facility:
Turkey Point Nuclear Plant, Units 3 & 4 Location:
Homestead, FL Inspection Dates:
April 15, 2024 to April 18, 2024 (Corporate)
May 20, 2024 to May 23, 2024 (Site)
Inspectors:
J. Brown, Senior Physical Security Inspector R. Patterson, Senior Physical Security Inspector R. Womack, Senior Physical Security Inspector Approved By:
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Turkey Point Nuclear Plant, Units 3
& 4, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were evaluated:
Access Authorization
Main article: IP 71130.01
- (1) Tier I: All Tier II: 02.05 (a, b), 02.06 (a, b), 02.07 (a), 02.08
- (a) Tier III: 02.09, 02.10 (b, c), 02.11 (a)
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
Main article: IP 71130.02
- (1) Tier I: All Requirements Tier II: (02.07 a, 02.08 a-d, f-h)
Tier III: (02.09)
71130.08 - Fitness-For-Duty Program
The inspectors evaluated the fitness for duty program by completing the following inspection
elements: Fitness-For-Duty Program
Main article: IP 71130.08
- (1) Tier I: All Requirements Tier II: 02.05 (a - l), 02.06 (a - g), 02.07, 02.08, 02.09 (a - e)
Tier III: 02.11, 02.12 (a - e)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
Main article: IP 71130.09
- (1) Since the last NRC inspection of this program area, Turkey Point Security Plan Revision 23 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) May 2023, through April
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations The inspectors evaluated the licensee's physical security measures for the independent spent fuel storage installation through completion of the following inspection elements:
Physical Security Requirements for Independent Spent Fuel Storage Installations===
- (1) IP requirements 02.01 - 02.08, as required by the inspection procedure for a general licensed ISFSI.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 23, 2024, the inspectors presented the security baseline inspection results to Michael Strope and other members of the licensee staff.
- On April 18, 2024, the inspectors presented the corporate Access Authorization and Fitness For Duty Program inspection results to Dawn Odom and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
AD-AA-101-1004
Work Hours Controls
Revision 24
SY-AA-100-1012
Behavioral Observation
Revision 10
SY-AA-101-1001
Guidelines for Determining Suitability for Unescorted Access
Revision 5
71130.01
Procedures
SY-AA-101-1001-
F03
Adjudication Matrix
Revision 2
24481684
2457231
2457709
2459024
2459119
2461820
2463840
2464593
2467203
2467820
2468867
2469339
2469553
2473642
2480495
Corrective Action
Documents
2484158
O-ADM-406
Security Key and Lock System
Revision 1
PTN-SY-001
Emergency Evacuation and Accountability
Revision 3
PTN-SY-025
Turkey Point Security Defensive Strategy Plan
Revision 23
PTN-SY-032
Access During Drills and Emergencies
Revision 3
PTN-SY-033
Containment Access Control
Revision 4
SY-AA-102-1020
Security Badge Control and Use
Revision 6
SY-AA-102-1021
Conduct of Personnel Searches
Revision 16
SY-AA-102-1022
Vehicle and Material Searches
Revision 15
SY-AA-102-1023
Visitor Access Control
Revision 11
71130.02
Procedures
SY-AA-102-1024
Escorting Vehicles and Materials
Revision 5
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Self-Assessments
PTN 23-005
Turkey Point Nuclear Assurance Report
2/02/2024
2467199
2467208
Corrective Action
Documents
2478579
Corrective Action
Documents
Resulting from
Inspection
2484398
Miscellaneous
EPID L-2020-
LLE-0078 CIVID-
Turkey Point Units 3 and 4 Approval of Exemption - Part 26
FFD
SY-AA-100
Fitness For Duty Program
Revision 2
SY-AA-100-1000
Fitness For Duty
Revision 13
SY-AA-100-1001
Selection and Notification for Drug / Alcohol Testing
Revision 2
SY-AA-100-1003
Alcohol Testing
Revision 8
SY-AA-100-1009
Fitness For Duty and Access Program Personnel Training
Requirements
Revision 6
71130.08
Procedures
SY-AA-100-1012
Behavioral Observation
Revision 10
Corrective Action
Documents
2477273
Miscellaneous
Various Force-on-Force Program Drill and Exercise
Documents
71130.09
Procedures
PSP
Turkey Point Physical Security Plan
08/31/2023
2458861
71151
Corrective Action
Documents
2484509
Corrective Action
Documents
2486236
Miscellaneous
LLEA Integrated Response Plan
Revision 0
PTN-SY-002
Site Specific Security Equipment Testing
Revision 27
PTN-SY-34
Control, Issue, and Display of Badges
Revision 1
SY-AA-102-1021
Conduct of Personnel Search
Revision 16
SY-AA-102-1022
Vehicle and Material Searches
Revision 15
81311
Procedures
SY-AA-102-1025
Weapons Maintenance
Revision 9
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SY-AA-102-1028
Security Systems and Equipment Compensatory Measures
Revision 7
SY-AA-102-1033
Security Equipment Testing
Revision 5