ML20136E515
| ML20136E515 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/07/1997 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20136E499 | List: |
| References | |
| 50-250-97-02, 50-250-97-2, 50-251-97-02, 50-251-97-2, NUDOCS 9703130224 | |
| Download: ML20136E515 (2) | |
Text
i SAFEGUARDS INFORMATION
^
Florida Power and Light Company Docket Nos.
50-250, 50-251 Turkey Point Nuclear Plant License Nos. DPR-31, DPR-41 During an NRC inspection conducted on February 3-7, 1997, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:
I 10 CFR 73.56(e) requires in part that each licensee implamenting an unescorted access authorization program shall provide an employee the opportunity to provide additional relevant information and provide an opportunity for an objective review of the information on which a denial or revocation of access authorizatien was based.
Contrary to the above, on December 29, 1995, a Florida Power and Light employee was denied unescorted access and was not provided the opportunity to provide additional relevant information and was not provided an opportunity for an objective review of the information on which the denial of access authorization was based.
This is a Severity Level-IV violation (Supplement III).
l Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, D.C.
20555 with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:.(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the l
corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response.
If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or l
why such other action as may be proper should not be taken. Where good cause l
is shown, consideration will be given to extending the response time.
Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.
If personal privacy or proprietary information is necessary to t
l provide an acceptable response, then please provide a bracketed copy of your I
response that identifies the information that should be protected and a l
redacted copy of your response that deletes such information.
If you request withholding of such material, you must specifically identify the portions of l
SAFEGUARDS INFORMATION gyg 9703130224 970307 nennation. When **Parat%.w.
W PDR ADOCK 05000250
- M tN c-W G
SAFEGUARDS INFORMATION 2
your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information).
If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Dated at Atlanta, Georgia this 7//tday of March 1997 i
i k
i 1
l d
a d
i i
h t
t 4
4 SAFEGUARDS INFORMATiON -
asd-informabon. Whenesperated from enclosum(s) this document is deco
._.