November 3, 2021

SUBJECT:

TURKEY POINT UNIT 3 & 4 - INTEGRATED INSPECTION REPORT 05000250/2021003 AND 05000251/2021003

Dear Mr. Coffey:

On September 30, 2021, the U.S. Nuclear Regulatory Commission ( NRC) completed an inspection at Turkey Point Unit 3 & 4. On October 12, 2021, th e NRC inspectors discussed the results of this inspection with you and other members of your s taff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects

Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000250 and 05000251

License Numbers: DPR-31 and DPR-41

Report Numbers: 05000250/2021003 and 05000251/2021003

Enterprise Identifier: I-2021-003-0008

Licensee: Florida Power & Light Company

Facility: Turkey Point Unit 3 & 4

Location: Homestead, FL 33035

Inspection Dates: July 01, 2021 to September 30, 2021

Inspectors: B. Bishop, Senior Project Engineer M. Endress, Senior Resident Inspector R. Reyes, Resident Inspector

Approved By: David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosure SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitori ng the licensees performance by conducting an integrated inspection at Turkey Po int Unit 3 & 4, in accordance with the Reactor Oversight Process. The Reactor Oversight Proc ess is the NRCs program for overseeing the safe operation of commercial nuclear power react ors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status NOV 05000250/2020011-01 Incomplete and Inaccurate 92702 Closed Information Associated with Auxiliary Feedwater Maintenance NOV 05000250,05000251/20Failure to Report 92702 Closed 21011-01 Mispositioned Plant Component that Caused Charging Pump Trip NOV 05000250,05000251/20Incomplete and Inaccurate 92702 Closed 21011-02 Information Associated with Charging Pump Maintenance

PLANT STATUS

Unit 3 began the inspection period at or near rated thermal pow er. Unit 3 experienced a down-power to 73% power on August 5, 2021 when control rods automati cally stepped-in in response to #2 Turbine Control Valve going fully closed. Unit 3 was manu ally tripped on August 13, 2021 and entered a forced outage to repair #2 Turbine Control Valve. Unit 3 was returned to rated thermal power on August 17, 2021 following repair of the #2 Tur bine Control Valve and remained at that power level for the remainder of the inspectio n period.

Unit 4 operated at or near rated thermal power for the entire i nspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of th e inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise note d. Currently approved IPs with their attached revision histories are located on the public web site at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspe ction activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Wa ter Reactor Inspection Program - Operations Phase. The inspectors reviewed selected p rocedures and records, observed activities, and interviewed personnel to assess licens ee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergen cy declared by the President of the United States on the public health risks of the coronavi rus (COVID-19), resident and regional inspectors were directed to begin telework and to remo tely access licensee information using available technology. During this time, the resident ins pectors performed periodic site visits each week, increasing the amount of time on-site as loca l COVID-19 conditions permitted.

As part of their on-site activities, resident inspectors conduc ted plant status activities as described in IMC 2515, Appendix D, Plant Status, and conducte d routine reviews using IP 71152, Problem Identification and Resolution, observed risk s ignificant activities; and completed on-site portions of IPs. In addition, resident and r egional baseline inspections were evaluated to determine if all or a portion of the objectives an d requirements stated in the IP could be performed remotely. If the inspections could be perfo rmed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives a nd requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall prepar ations to protect risk-significant systems from impending severe weather from Tropical Storm Elsa on July 4, 2021.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial w alkdowns of the following systems/trains:

(1) 4A and 4C Intake Cooling Water (ICW) pumps with the 4B ICW pump Out of Service (OOS) for replacement, on July 6, 2021.

(2) 3A, 3B, 4B High Head Safety Injection (HHSI) Pumps and the Unit 3 and Unit 4 Refueling Water Storage Tank (RWST) flow paths while the 4A HHS I pump and the 4A Emergency Diesel Generator (EDG) were out of service for mai ntenance, on July 14, 2021.

(3) 3A and 3B Coolant Charging Pumps (CCPs), Boric Acid Transfe r Pumps, and Boric Acid Tanks while the 3C CCP was OOS for maintenance, on Septembe r 1, 2021.

(4) Unit 3 ICW System with the 3B ICW Pump tagged out for unpla nned maintenance, on September 2, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protect ion program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 3 and Unit 4 Turbine Building 42 Foot Elevation (Fire Zone (FZ) 117), on August 17, 2021.

(2) Unit 3 and Unit 4 480V Load Center Rooms A&B (FZs 093 & 094 ), on August 17, 2021.

(3) Unit 3 3A and 3B EDG rooms, fuel-oil day tank rooms, and ra diator fan rooms, and Unit 4 4A and 4B EDG buildings (FZs 073 and 072), on August 25, 2021.

(4) Unit 3 and Unit 4 Condensate Pump pits (FZs 092 and 091), a nd Unit 3 and Unit 4 Turbine Lube Oil Reservoirs area (FZs 081 and 076), on August 3 0, 2021.

(5) Unit 3 and Unit 4 Condensate Storage Tank and Auxiliary Fee d Water (AFW) piping room (FZs 116 and 113), on September 1, 2021.

(6) Unit 3 and Unit 4 Main Steam platforms (FZs 115 and 114), o n September 8, 2021.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protectio ns in the:

(1) Unit 3 and Unit 4 Residual Heat Removal (RHR) Pump Rooms, o n September 22, 2021.

71111.11Q - Licensed Operator Requalification Program and Licen sed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator per formance in the Control Room during the following activities:

  • Operator response following failure of the Unit 3 Turbine Cont rol Valve and resulting automatic turbine runback and fast load reduction to 75% power, on August 5, 2021.
  • 3B EDG monthly operability run briefing, coordination, and per formance, on August 12, 2021.
  • Planned Unit 3 power decrease to 18%, reactor manual trip, ent ry in Emergency Operating Procedure E-0, and stabilizing the plant fo r decay heat removal, on August 13, 2021.
  • Unit 3 startup after repairs completed on the failed turbine c ontrol valve, on August 16, 2021.

Licensed Operator Requalification Training/Examinations (IP Sec tion 03.02) (1 Sample)

(1) The inspectors observed and evaluated a requalification tra ining simulator scenario administered to an operating crew on August 23, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to en sure the following structures, systems, and components (SSCs) remain capable of pe rforming their intended function:

(1) AR 2392108 and EVAL-PTN-013-LD-02363, 3CD Instrument Air Co mpressor entered into Maintenance Rule (a)(1)

(2) AR 2385529 and EVAL-PTN-089-02482, Maintenance Rule Evaluat ion of U3 Reactor Trip during restoration from Reactor Protection System (RPS) te sting

71111.13 - Maintenance Risk Assessments and Emergent Work Contr ol

Risk Assessment and Management Sample (IP Section 03.01) (5 Sam ples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure config uration changes and appropriate work controls were addressed:

(1) Unit 3 and Unit 4 on-line risk assessment with the followin g equipment OOS: 4A EDG, AHU-V78 North Water Chiller for the electrical equipment r oom, MOV-4-535 Pressurizer Power Operated Relief Valve (PORV) block valve, 4A HHSI pump, 4B Service Water pump, and PCV-4-456 PORV, on July 12, 2021.

(2) Unit 3 and Unit 4 on-line risk assessment with the followin g equipment OOS: 4B Component Cooling Water (CCW) Heat Exchanger, AHU-V78 North Wat er Chiller for the electrical equipment room, MOV-4-535 Pressurizer PORV block valve, and PCV-4-456 pressurizer PORV, on July 21, 2021.

(3) Unit 3 and Unit 4 on-line risk assessment with the followin g equipment OOS: 3E208A A CCW Heat Exchanger, 3P16A A Primary Water makeup pump, 4D32 125-Volt DC static battery charger, 4D34 125-Volt st ation battery, E233 water chiller unit for the electrical equipment room, P235 B Service Water Pump B, and P235D Diesel Service Water pump, on August 10, 2021.

(4) Unit 3 and Unit 4 on-line risk assessment with the followin g equipment OOS: 4A CCW heat exchanger, MOV-4-535 Pressurizer PORV block valve, and PCV -4-456 Pressurizer PORV, on August 26, 2021.

(5) Unit 3 and Unit 4 on-line risk assessment with the followin g equipment OOS: 3C CCW Heat Exchanger, 3C CCP, E233 water chiller unit for north e lectrical equipment room, and Unit 4 PCV-4-456 Pressurizer PORV, on September 1, 20 21.

71111.15 - Operability Determinations and Functionality Assessm ents

Operability Determination or Functionality Assessment (IP Secti on 03.01) (7 Samples)

The inspectors evaluated the licensee's justifications and acti ons associated with the following operability determinations and functionality assessme nts:

(1) AR 2398329, 4A EDG High Oil Temp Switch Disconnected (2) AR 2398530 and AR 2398113, 4B Intake Cooling Water Pump Dec lared Operable Early/4B ICW Pump IST/PMT Data Requires Evaluation (3) AR 2399263, No Packing Leak-off on 4B ICW Pump (4) Engineering Evaluation EC 294670 and AR 2167003, Rigging of CCW Chillers and Heavy Load Path Over Safety-Related Equipment.

(5) AR 2402033, 3C CCP Primary Packing Leaking in Excess.

(6) AR 2404490, 4A EDG Control Room Air Conditioning Not Working.

(7) AR 2405251, 3-day Prompt Operability Determination for Control R oom Door.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post-maintenance test ac tivities to verify system operability and functionality:

(1) Work Order (WO) 40454537, Replace the Unit 4 4B ICW Pump an d Pump Discharge Check Valve, and test using per 4-OSP-019.1, Intake Cooling Wat er Inservice Test, on July 9, 2021.

(2) WO 40788065, Unit 3 Turbine Control Valve #2 Actuator repla cement, on August 16, 2021.

(3) WO 40614867, Unit 3 3A ICW Pump and Pump Discharge Check Va lve following replacement of 3A ICW Pump Motor, on August 18, 2021.

(4) WO 40790552, Unit 3 3C CCP re-pack, on August 31, 2021.

(5) WO 40791411, Unit 3 3B ICW Pump replacement, on September 6, 2021.

(6) WO 40792115, Repair welds on the Unit 4B EDG Fuel-oil Trans fer System and test using penetrant inspection Level II and system leak test, on Se ptember 15, 2021.

(7) [List test samples [e.g., 1OP-50, Plant Electric System Ope rating Procedure after replacement of the 1A NSW pump breaker], [[on date] or [work or der #]]

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01) (1 Sample)

(1) 4-OSP-047.1B, Charging Pump 4B Group A Pump Test and 4-OSP- 047.1C, Charging Pump 4C Group A Pump Test, on July 09, 2021.

Inservice Testing (IP Section 03.01) (4 Samples)

(1) 4-OSP-030.1, Component Cooling Water Pump Inservice Test (I ST) (Sections 7.2 4B CCW pump and 7.3 4C CCW pump), on July 19, 2021.

(2) 4-OSP-068.5B, 4B Containment Spray Pump IST, completed on A ugust 4, 2021.

(3) 4-OSP-019.1, Intake Cooling Water IST (Section 7.3, ICW Pum p 4C Test), completed on August 6, 2021.

(4) 3-OSP-074.5, Feed Water (FW) Control Valve and Bypass Valve IST, completed on August 31, 2021.

FLEX Testing (IP Section 03.02) (1 Sample)

(1) 0-OSP-083.2B, Periodic Testing of Flex SG Pump B, completed on September 27, 2021.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observ ation (IP Section 03.01) (1 Sample)

(1) Inspectors observed an emergency preparedness drill on Augu st 19, 2021 in the emergency operating facility, control room simulator, and the t echnical support center.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submitt als listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Sect ion 02.04) (2 Samples)

(1) Unit 3 (July 1, 2020 through June 30, 2021)

(2) Unit 4 (July 1, 2020 through June 30, 2021)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sampl e)

The inspectors reviewed the licensees implementation of its co rrective action program related to the following issues:

(1) NCV 05000250/2020050-02, Failure to Adequately Manage React ivity During Reactor Startup and AR 02365970. The NCV was described in Turke y Points Units 3 and 4 - Special Inspection Report 05000250/2020050 and 05000251 /2020050 dated December 9, 2020 (ADAMS Accession No. ML20344A126). This issue was selected for follow-up to verify the licensee's corrective actions were appropriate to address the performance deficiency and failure to adequately manage rea ctivity during reactor startup.

OTHER ACTIVITIES - TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNOR MAL

92702 - Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders

The inspectors conducted a follow-up inspection of Florida Powe r & Lights (FPL) response to a Notice of Violation (NOV) EA-20-043 and EA-20-150 issued on Apr il 6, 2021.

Follow-Up on Traditional Enforcement Actions Including Violatio ns, Deviations, Confirmatory Action Letters, and Orders (1 Sample)

(1) The inspectors conducted a follow-up inspection of Florida Power & Lights (FPL)

response to a Notice of Violation (NOV) EA-20-043 and EA-20-150 issued on April 6, 2021. The inspectors evaluated the corrective actions that wer e implemented by FPL to determine whether they were adequate to address the identifi ed deficiencies and to prevent recurrence. The inspectors concluded that FPL's correc tive actions were both timely and appropriate. Base on the results of this review, no additional NRC actions are necessary, and the following violations are closed: 05000250/2020011-01, 05000250,05000251/2021011-01 and 05000250,05000251/2021011- 02.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 12, 2021, the inspectors presented the integrated i nspection results to Bob Coffey and other members of the licensee staff.
  • On August 26, 2021, the inspectors presented the results of 92 702 inspection to M.

Pearce and other members of the licensee staff.

8