ML20054M994

From kanterella
Revision as of 02:31, 14 November 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/82-16 & 50-401/82-16 on 820510-13 & Notice of Violation
ML20054M994
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/02/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20054M980 List:
References
NUDOCS 8207150244
Download: ML20054M994 (2)


See also: IR 05000400/1982016

Text

g

1l

'- '

- . .

(7 (fct)

I

JUN 2 1982

Carolina Power and Light Company

ATTN: Mr. J. A. Jones, Senior Executive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject: Report Nos. 400/82- 6)and 50-401/82-16

This refers to the routine safety inspection conducted by Mr. J. R. Harris of

this office on May 10-13, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-158 and CPPR-159 for the Shearon Harris facility. Our pre-

liminary findings were discussed with Mr. R. M. Parsons, Project General Manager,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A. Elements to be included in your response are delineated in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8207150244 82070s

PDR ADOCK 05000400

G PDR

I

-

-

. . JUN 2 1982

Carolina Power and Light Company 2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

/s/

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

.

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-400/82-16

and 50-401/82-16

cc w/ encl:

R. M. Parsons, Project General Manager

bcc w/ encl:  !

NRC Resident Inspector

Document Management Branch

State of North Carolina

1

l

l

l

l >

RII RII RI y RII RI p

[f ,

l JRH ris:ht TEConlon ARHerdt ab. f2n HCDance

l

54q 82 5/ /82 J/ g /82 d/ t.,/82 5/ /32

t.

c.

l