Notice of Violation from Insp on 820510-13
ML20054M995
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/02/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054M980 List:
References
50-400-82-16, NUDOCS 8207150246
Download: ML20054M995 (1)


Text

.. -_. =_. _. . _ _ _ __ _ _ . _ _ _ __

a s t . .

APPENDIX A l j NOTICE OF VIOLATION  !

) Carolina Power and Light Company -

Docket No. 50-400 Shearon Harris 1 License No. .CPPR-158

As a result of the inspection conducted on May 10-13, 1982, and in accordance
, with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following
violation was identified.

10 CFR 50, Appendix B, Criterion V, as implemented by Carolina Power and  !

!. Light PSAR Section 1.'8.5.5, requires in part that activities affecting l quality shall be prescribed by documented instructions, procedures or ,

drawings and shall be accomplished in accordance with these instructions,

! procedures or drawings. Shearon Harris specification ' CAR-SH-CH-6 " Con-crete", requires that field cured test cylinders be controlled in accordance

~

j with ASTM C-31. ASTM C-31 specifies that field med test cylinders are '

to be stored under conditions that maintain the Iture in a range of

60-80 degress Fahrenheit for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> .nolding of the test j cylinders. ,

Contrary to the above, test cylindets.fren concrete pour number ICBXW406002 L

were observed being stored at temperatures greater than 80 degrees Fahren-
z_ heit during the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after molding.  ;

t This is a Severity level V Violation (Supplement II.E).

, l Pursuant t_o the provisions of 10 CFR 2.201, you are hereby required to submit to f this of fice within thirty days of the date of this Notice, a written statement or

, explanation in reply, including: (1)~ admission or denial of the alleged viola-

! tion; (2) the reasons for the v,iolation if admitted; (3; the' corrective steps

.l which have been taken and the results achieved; (4) corrective steps which will l be taken to avoid further violations; and (5) the date< when full compliance will

be achieved. Considerat' ion may' be given to extending your response time for good cause shown'. <  ;

! JUN 2 1982 .

I J- Date: /

  • s I \

l  :

s' j

! i I

s

I

( i/ l

. r 1 t

8207150246 820708 I PDR ADOCK 05000400 ' '

G PDR ,'

a , -

n

/

__.m._

-h