Similar Documents at Hatch |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items ML20056D1161993-07-23023 July 1993 Insp Repts 50-321/93-11 & 50-366/93-11 on 930606-0703. Violations Noted.Major Areas Inspected:Operations,Maint Activities,Surveillance Testing,Review of Standby Gas Treatment Sys Operability Issue & Review of Open Items IR 05000321/19930011993-02-11011 February 1993 Partially Withheld Insp Repts 50-321/93-01 & 50-366/93-01 on Stated Dates.Areas Inspected:Physical Security Program Including,Alarm Stations & Communications,Testing,Maint & Compensatory Measures.Details Withheld (Ref 10CFR2.790) IR 05000321/19920341993-02-0404 February 1993 Insp Repts 50-321/92-34 & 50-366/92-34 on 921206-930109. Violations Noted But Not Cited.Major Areas Inspected: operations,drywell-to-torus Vacuum Breaker Issue,Remedial Emergency Preparedness Drill & Surveillance Testing IR 05000321/19920331993-01-0808 January 1993 Insp Repts 50-321/92-33 & 50-366/92-33 on 921207-11. Violations Noted.Major Areas Inspected:Radioactive Effluent Monitoring Instrumentation,Cr Emergency Ventilation Sys, Meteorological Monitoring & Radwaste Mgt IR 05000321/19920321992-12-22022 December 1992 Insp Repts 50-321/92-32 & 50-366/92-32 on 921108-1205. Violations Noted But Not Cited.Major Areas Inspected: Operations,Surveillance Testing,Including Standby Liquid Control Sys Testing,Maint Activities & Control of Overtime IR 05000321/19920311992-12-0101 December 1992 Insp Repts 50-321/92-31 & 50-366/92-31 on 921103-05.No Violations or Deviations Noted.Major Areas Inspected:Fitness for Duty Program,Specifically Chemical Testing,Procedures, Repts & Audits 1999-09-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items ML20056D1161993-07-23023 July 1993 Insp Repts 50-321/93-11 & 50-366/93-11 on 930606-0703. Violations Noted.Major Areas Inspected:Operations,Maint Activities,Surveillance Testing,Review of Standby Gas Treatment Sys Operability Issue & Review of Open Items IR 05000321/19930011993-02-11011 February 1993 Partially Withheld Insp Repts 50-321/93-01 & 50-366/93-01 on Stated Dates.Areas Inspected:Physical Security Program Including,Alarm Stations & Communications,Testing,Maint & Compensatory Measures.Details Withheld (Ref 10CFR2.790) IR 05000321/19920341993-02-0404 February 1993 Insp Repts 50-321/92-34 & 50-366/92-34 on 921206-930109. Violations Noted But Not Cited.Major Areas Inspected: operations,drywell-to-torus Vacuum Breaker Issue,Remedial Emergency Preparedness Drill & Surveillance Testing IR 05000321/19920331993-01-0808 January 1993 Insp Repts 50-321/92-33 & 50-366/92-33 on 921207-11. Violations Noted.Major Areas Inspected:Radioactive Effluent Monitoring Instrumentation,Cr Emergency Ventilation Sys, Meteorological Monitoring & Radwaste Mgt IR 05000321/19920321992-12-22022 December 1992 Insp Repts 50-321/92-32 & 50-366/92-32 on 921108-1205. Violations Noted But Not Cited.Major Areas Inspected: Operations,Surveillance Testing,Including Standby Liquid Control Sys Testing,Maint Activities & Control of Overtime IR 05000321/19920311992-12-0101 December 1992 Insp Repts 50-321/92-31 & 50-366/92-31 on 921103-05.No Violations or Deviations Noted.Major Areas Inspected:Fitness for Duty Program,Specifically Chemical Testing,Procedures, Repts & Audits 1999-09-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134L0911997-01-18018 January 1997 Insp Repts 50-321/96-15 & 50-366/96-15 on 961208-970118. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20133G9881997-01-0606 January 1997 Insp Repts 50-321/96-14 & 50-366/96-14 on 961027-1207. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status IR 05000321/19960131996-11-25025 November 1996 Insp Repts 50-321/96-13 & 50-366/96-13 on 960915-1026. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20134D3771996-10-11011 October 1996 Insp Repts 50-321/96-11 & 50-366/96-11 on 960804-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19930261993-12-20020 December 1993 Insp Repts 50-321/93-26 & 50-366/93-26 on 931031-1127.No Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maintenance Activities,Warehouse Storage,Self Assessment & Mods ML20058J4641993-11-17017 November 1993 Insp Repts 50-321/93-24 & 50-366/93-24 on 931003-30.One Violation & One Noncited Violation Noted.Major Areas Inspected:Operations Including Review of Scram,Sustained CR Observation,Surveillance Testing & Maint IR 05000321/19930251993-11-10010 November 1993 Insp Repts 50-321/93-25 & 50-366/93-25 on 931018-21.No Violations Noted.Major Areas Inspected:Physical Security Program for Reactors IR 05000321/19930221993-11-0202 November 1993 Insp Repts 50-321/93-22 & 50-366/93-22 on 931004-08.No Violations Noted.Major Areas Inspected:Plant Fire Protection/Prevention Implementation Program & Followup on Previous Insp Findings IR 05000321/19930191993-10-26026 October 1993 Insp Repts 50-321/93-19 & 50-366/93-19 on 931004-08.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Corrective Actions for safety-significant Findings Identified During Edsfi IR 05000321/19930201993-10-21021 October 1993 Insp Repts 50-321/93-20 & 50-366/93-20 on 930905-1002. Noncited Violation Identified.Major Areas Inspected:Maint Activities,Surveillance Testing,Review of Deficiency Cards & Significant Event Repts & Review of Open Items ML20058Q0941993-10-15015 October 1993 Insp Repts 50-321/93-18 & 50-366/93-18 on 930913-17.No Violations Noted.Major Areas Inspected:Full Participation EP Exercise Including Simulator Control Room,Technical Support Ctr & Operations Support Ctr IR 05000321/19930211993-10-0808 October 1993 Insp Repts 50-321/93-21 & 50-366/93-21 on 930913-17.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Mod,Design Changes & Plant Operations IR 05000321/19930171993-09-22022 September 1993 Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items ML20057C3421993-09-10010 September 1993 Insp Repts 50-321/93-16 & 50-366/93-16 on 930809-13. Violations Noted.Major Areas Inspected:Licensee Efforts for Maintaining Occupational Radiation Exposure ALARA IR 05000321/19930141993-08-30030 August 1993 Insp Repts 50-321/93-14 & 50-366/93-14 on 930726-30. Violations Noted.Major Areas Inspected:Design Calculations, Test Packages,Diagnostic Signature Traces & Followup Issues from Previous NRC Insp of MOV Program in Feb 1992 IR 05000321/19930151993-08-29029 August 1993 Insp Repts 50-321/93-15 & 50-366/93-15 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Radioactive Effluents,Radiological Environ Monitoring,Water Chemistry,Training & Followup on Previous Insp Findings ML20057A4301993-08-27027 August 1993 Insp Repts 50-321/93-13 & 50-366/93-13 on 930704-0807. Violations Noted.Major Areas Inspected:Operations, Surveillance Testing,Maint Activities,Seismic Monitoring Equipment & Review of Open Items ML20056D1161993-07-23023 July 1993 Insp Repts 50-321/93-11 & 50-366/93-11 on 930606-0703. Violations Noted.Major Areas Inspected:Operations,Maint Activities,Surveillance Testing,Review of Standby Gas Treatment Sys Operability Issue & Review of Open Items IR 05000321/19930011993-02-11011 February 1993 Partially Withheld Insp Repts 50-321/93-01 & 50-366/93-01 on Stated Dates.Areas Inspected:Physical Security Program Including,Alarm Stations & Communications,Testing,Maint & Compensatory Measures.Details Withheld (Ref 10CFR2.790) IR 05000321/19920341993-02-0404 February 1993 Insp Repts 50-321/92-34 & 50-366/92-34 on 921206-930109. Violations Noted But Not Cited.Major Areas Inspected: operations,drywell-to-torus Vacuum Breaker Issue,Remedial Emergency Preparedness Drill & Surveillance Testing IR 05000321/19920331993-01-0808 January 1993 Insp Repts 50-321/92-33 & 50-366/92-33 on 921207-11. Violations Noted.Major Areas Inspected:Radioactive Effluent Monitoring Instrumentation,Cr Emergency Ventilation Sys, Meteorological Monitoring & Radwaste Mgt IR 05000321/19920321992-12-22022 December 1992 Insp Repts 50-321/92-32 & 50-366/92-32 on 921108-1205. Violations Noted But Not Cited.Major Areas Inspected: Operations,Surveillance Testing,Including Standby Liquid Control Sys Testing,Maint Activities & Control of Overtime IR 05000321/19920311992-12-0101 December 1992 Insp Repts 50-321/92-31 & 50-366/92-31 on 921103-05.No Violations or Deviations Noted.Major Areas Inspected:Fitness for Duty Program,Specifically Chemical Testing,Procedures, Repts & Audits 1999-09-16
[Table view] Category:UTILITY
MONTHYEARIR 05000321/19900221990-11-19019 November 1990 Insp Repts 50-321/90-22 & 50-366/90-22 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Design Mods & Changes & Followup on SSFI Open Items IR 05000321/19900201990-11-13013 November 1990 Insp Repts 50-321/90-20 & 50-366/90-20 on 900915-1020. Violations Noted.Major Areas Inspected:Operations Including Two Unit One Scrams,Main Steam Line Radiation Monitor Trip Settings & Setpoint Controls IR 05000321/19900161990-11-0505 November 1990 Insp Repts 50-321/90-16 & 50-366/90-16 on 901001-12.No Violations or Deviations Noted.Major Areas Inspected: Verification of Corrective Actions for Previous Findings in Areas of EOPs IR 05000321/19900211990-11-0101 November 1990 Insp Repts 50-321/90-21 & 50-366/90-21 on 901001-05.No Violations or Deviations Noted.Major Areas Inspected:Whole Body Counter & Radioanalytical Lab Qc,Fuel Quality & ALARA IR 05000321/19900191990-10-18018 October 1990 Insp Repts 50-321/90-19 & 50-366/90-19 on 900925-28.No Violations Noted.Major Areas Inspected:Annual Emergency Exercise IR 05000321/19900171990-10-12012 October 1990 Insp Repts 50-321/90-17 & 50-366/90-17 on 900911-14.No Violations or Deviations Noted.Major Areas Inspected: Compliance W/Atws Rule IR 05000321/19900141990-07-12012 July 1990 Insp Repts 50-321/90-14 & 50-366/90-14 on 900512-0622.No Specific Strengths or Weaknesses of Licensee Programs Noted. Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Testing Observation & Events IR 05000321/19890161989-09-20020 September 1989 Insp Repts 50-321/89-16 & 50-366/89-16 on 890722-0825. Violations Noted Re Surveillance Tracking Software Deficiency Resulting in Deactivation of Task.Major Areas Inspected:Operational Safety Verification & Maint IR 05000321/19890171989-09-0101 September 1989 Insp Repts 50-321/89-17 & 50-366/89-17 on 890612-16 & 0731- 0804.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Liquid & Gaseous Radwaste Processing,Control Room Habitability & Water Chemistry IR 05000321/19890181989-08-31031 August 1989 Insp Repts 50-321/89-18 & 50-366/89-18 on 890807-11. Violation Noted Re Failure to Repair Components of post- Accident Sampling Sys.Major Areas Inspected:Emergency Preparedness,Including Emergency Kits & Equipment IR 05000321/19890131989-08-23023 August 1989 Insp Repts 50-321/89-13 & 50-366/89-13 on 890710-13. Violations Noted.Major Areas Inspected:Review of Licensee Organization & Mgt Controls,External Exposure Controls, Dosimetry,Alara Program & Solid Radwaste IR 05000336/19890161989-08-21021 August 1989 Insp Rept 50-336/89-16 on 890616-0726.Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint, Previously Identified Items,Committee Activities,Emergency Diesel Generator Operation & Fuel Oil Sys IR 05000321/19890151989-08-16016 August 1989 Insp Repts 50-321/89-15 & 50-366/89-15 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Nrc Bulletin 80-11,masonry Wall Design & Licensee Action on Previous Insp Findings IR 05000321/19890141989-08-0303 August 1989 Insp Repts 50-321/89-14 & 50-366/89-14 on 890717-20.No Violations or Deviations Noted.Major Areas Inspected: Licensee Actions on Previous Insp Findings IR 05000321/19890121989-08-0202 August 1989 Insp Repts 50-321/89-12 & 50-366/89-12 on 890624-0721. Licensee-identified Violations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observation,Ros & Surveillance Procedures & Records IR 05000321/19890111989-07-10010 July 1989 Insp Repts 50-321/89-11 & 50-366/89-11 on 890619-23. Violation Noted.Major Areas Inspected:Licensee Actions Re Previous Insp Findings & NRC Bulletins IR 05000321/19890101989-07-0505 July 1989 Insp Repts 50-321/89-10 & 50-366/89-10 on 8905270623.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Calibr & Surveillance Procedures & Records IR 05000321/19890071989-06-19019 June 1989 Insp Repts 50-321/89-07 & 50-366/89-07 on 890422-0526. Licensee Identified Violations Not Being Cited.Major Areas Inspected:Operational Safety Verification,Maint Observations & Surveillance Testing Observations IR 05000321/19890091989-06-0909 June 1989 Partially Withheld Insp Repts 50-321/89-09 & 50-366/89-09 on 890522-26 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Organization,Security Plan Audit, Testing & Maint,Protected & Vital Areas & Alarm Stations ML20245D5311989-05-22022 May 1989 Insp Repts 50-321/89-02 & 50-366/89-02 on 890227-0317. Violations Noted.Major Areas Inspected:Maint Program & Implementation.Per NRC Temporary Instruction 2515/97 IR 05000321/19890061989-05-0808 May 1989 Insp Repts 50-321/89-06 & 50-366/89-06 on 890321-0421. Violation Noted.Major Areas Inspected:Operational Safety Verification,Ros,Surveillance Testing Observations,Maint observations,10CFR21 Insp & TMI Items IR 05000321/19890051989-04-13013 April 1989 Partially Withheld Insp Repts 50-321/89-05 & 50-366/89-05 on 890320-24 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Records & Repts & Testing & Maint IR 05000321/19890041989-04-11011 April 1989 Insp Repts 50-321/89-04 & 50-366/89-04 on 890225-0320. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Testing Observation,Ros & Visit to Lpdr IR 05000321/19890011989-03-16016 March 1989 Insp Repts 50-321/89-01 & 50-366/89-01 on 890121-0224. Violations Noted Re Deficient RHR Valve Operability Procedure.Major Areas Inspected:Operational Safety Verification,Maint Observation & Diesel Generator Fuel Oil IR 05000321/19890031989-03-10010 March 1989 Insp Repts 50-321/89-03 & 50-366/89-03 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention/Protection Program Implementation & Followup on Previously Identified Items IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000321/19880421989-02-15015 February 1989 Insp Repts 50-321/88-42 & 50-366/88-42 on 881224-890120.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Esf Sys Walkdown,Ros, Followup on NRC Bulletin 88-03 & Part 21 Rept IR 05000321/19880301988-11-0808 November 1988 Insp Repts 50-321/88-30 & 50-366/88-30 on 880924-1021. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Testing Observations,Ros, Util Operational Upgrade Efforts & Refueling Activities IR 05000321/19880291988-10-12012 October 1988 Insp Repts 50-321/88-29 & 50-366/88-29 on 880820-0923.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observations & Surveillance Testing Observations & Physical Security IR 05000321/19880271988-09-28028 September 1988 Partially Withheld Insp Repts 50-321/88-27 & 50-366/88-27 on 880822-26 (Ref 10CFR2.790 & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Security Program Audit,Locks,Keys & Combinations & Access Controls ML20155A2121988-09-22022 September 1988 Insp Repts 50-321/88-24 & 50-366/88-24 on 880723-0819 & 0822-24.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Plant Mods,Esf Sys Walkdowns & Review of Licensee Operational Upgrade Efforts IR 05000321/19880251988-09-22022 September 1988 Insp Repts 50-321/88-25 & 50-366/88-25 on 880815-19.No Violations or Deviations Noted.Major Areas Inspected: Operational Readiness of Site Emergency Preparedness Program.Weakness Noted Re Current Administrative Control IR 05000321/19880261988-09-0909 September 1988 Insp Repts 50-321/88-26 & 50-366/88-26 on 880816-19.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste,Transportation of Radioactive Matl,Followup on Previous Insp Items & Selected NRC Info Notices IR 05000321/19880221988-08-30030 August 1988 Insp Repts 50-321/88-22 & 50-366/88-22 on 880625-0722.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Radiological Protection & Physical Security IR 05000321/19880231988-08-15015 August 1988 Insp Repts 50-321/88-23 & 50-366/88-23 on 880801-05.No Violations Noted.Major Areas Inspected:Review of Completed post-refueling Startup Tests,Thermal Limits Monitoring, Thermal Power Monitoring & Nuclear Instrument Calibrs ML20153F2351988-07-22022 July 1988 Insp Repts 50-321/88-21 & 50-366/88-21 on 880620-24. Violations Noted.Major Areas Inspected:Fire Protection/ Prevention & Followup on Previously Identified Insp Findings ML20151L9451988-07-21021 July 1988 Insp Repts 50-321/88-17 & 50-366/88-17 on 880521-0624. Violations & Deviations Noted.Major Areas Inspected: Operational Safety Verification,Maint Observations, Surveillance Testing Observations & Physical Security IR 05000321/19880121988-06-24024 June 1988 Insp Repts 50-321/88-12 & 50-366/88-12 on 880502-10. Deficiencies Noted.Major Areas Inspected:Emergency Operating Procedures,Including QA Measures,Quality of Control Room Drawings & Evaluation of Containment Venting Provisions IR 05000321/19880151988-06-16016 June 1988 Insp Repts 50-321/88-15 & 50-366/88-15 on 880509-20. Violations Noted.Major Areas Inspected:Operational Performance Assessment Re Effectiveness of Various Plant Groups Including,Operations,Qa & Engineering & Training IR 05000321/19880141988-06-10010 June 1988 Insp Repts 50-321/88-14 & 50-366/88-14 on 880418-20 & 0423-0520.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Observation,Radiological Protection & Physical Security IR 05000321/19880161988-05-23023 May 1988 Insp Repts 50-321/88-16 & 50-366/88-16 on 880509-10.No Violations or Deviations Noted.Major Areas Inspected:Review of Recent Changes to General Employee Training,Radiation Instrument Performance Checks IR 05000321/19880111988-05-13013 May 1988 Insp Repts 50-321/88-11 & 50-366/88-11 on 880326-0422. Violation Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Maint Observations & Physical Security IR 05000321/19880131988-05-13013 May 1988 Insp Repts 50-321/88-13 & 50-366/88-13 on 880418-20.No Violations Noted.Major Areas Inspected:Hydrogen Water Chemistry & Plant Chemistry Control ML20151Z3091988-04-28028 April 1988 Suppl to Insp Repts 50-321/87-25 & 50-366/87-25,consisting of Results of Measurements of Split Water Samples & Criteria for Comparing Analytical Measurements IR 05000321/19880101988-04-27027 April 1988 Insp Repts 50-321/88-10 & 50-366/88-10 on 880404-08.No Violations or Deviations Noted.Major Areas Inspected:Review of Procedures,Records,Operations & Physical Inventory for Use,Control & Accountability of SNM IR 05000321/19880071988-04-11011 April 1988 Insp Repts 50-321/88-07 & 50-366/88-07 on 880220-0325. Violations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Operational Safety Verification,Radiological Protection & Physical Security IR 05000321/19880081988-04-0101 April 1988 Insp Repts 50-321/88-08 & 50-366/88-08 on 880307-11.No Violations or Deviations Noted.Major Areas Inspected:Areas of Complex Surveillance Testing & IE Bulletin Followup ML20151B9241988-03-24024 March 1988 Partially Withheld Insp Repts 50-321/88-09 & 50-366/88-09 on 880229-0304 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Plan/Procedures,Repts/Records,Testing/Maint, Barriers,Detection Aids & Compensatory Measures IR 05000321/19880031988-03-23023 March 1988 Insp Repts 50-321/88-03 & 50-366/88-03 on 880201-05.No Violations Noted.Major Areas Inspected:Seismic Analysis for as-built safety-related Piping Sys & Mark I Containment long-term Program Mod ML20148H7111988-03-0707 March 1988 Insp Repts 50-321/88-05 & 50-366/88-05 on 880123-0219. Violations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Maint Observation,Operational Safety Verification,Plant Mods & Physical Security 1990-07-12
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000321/19990091999-10-0707 October 1999 Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823- 27.One Violation Being Treated as Ncv.Major Areas Inspected: Maint & Engineering IR 05000321/19990051999-09-16016 September 1999 Insp Repts 50-321/99-05 & 50-366/99-05 on 990711-0821.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990041999-08-0404 August 1999 Insp Repts 50-321/99-04 & 50-366/99-04 on 990530-0710.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19990101999-07-20020 July 1999 Insp Repts 50-321/99-10 & 50-366/99-10 on 990616-25.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Problem Identification & Resolution & Corrective Actions IR 05000321/19990031999-06-25025 June 1999 Insp Repts 50-321/99-03 & 50-366/99-03 on 990418-0529.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-II-99-025, on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly1999-06-17017 June 1999 PNO-II-99-025:on 990615,CR Operators Manually Shutdown Unit 2 Reactor from 41% Power,Due to Decreasing Condenser Vacuum. Cause of Decreasing Vacuum Has Not Been Determined.All Rods Installed as Required & All Safety Sys Functioned Properly PNO-II-99-016, on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized1999-05-0707 May 1999 PNO-II-99-016:on 990505,Hatch Unit 2 Had Main Generator Trip Form 98% Power,Due to Electrical Fault.Licensee Continuing Investigation Has Been Hampered Due to Inclement Local Weather Conditions.Plant Being Depressurized IR 05000321/19990021999-05-0606 May 1999 Insp Repts 50-321/99-02 & 50-366/99-02 on 990307-0417.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000321/19990011999-04-0202 April 1999 Insp Repts 50-321/99-01 & 50-366/99-01 on 990124-0306.Non- Cited Violations Identified.Major Areas Inspected:Maint, Operations & Plant Support IR 05000321/19980091999-02-24024 February 1999 Insp Repts 50-321/98-09 & 50-366/98-09 on 981213-990123.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Covers Insp in Health Physics & Independent Spent Fuel Storage IR 05000321/19980071998-12-29029 December 1998 Insp Repts 50-321/98-07 & 50-366/98-07 on 981101-1212.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19980061998-11-24024 November 1998 Insp Repts 50-321/98-06 & 50-366/98-06 on 980920-1031. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000321/19980051998-10-15015 October 1998 Insp Repts 50-321/98-05 & 50-366/98-05 on 980802-0919.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Insp Also Included Insps by Regional Maint & Emergency Preparedness PNO-II-98-040, on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury1998-09-18018 September 1998 PNO-II-98-040:on 980917,licensee Declared Notification of Unusual Event Based on Transport of Two Injured & Potentially Contaminated Individuals to Local Hospital.Two Individuals Found Not to Have Sustained Serious Injury IR 05000321/19980041998-08-21021 August 1998 Insp Repts 50-321/98-04 & 50-366/98-04 on 980621-0801.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Rept Includes Results of Insp by Regional Engineering & Safeguard IR 05000321/19980031998-07-14014 July 1998 Insp Repts 50-321/98-03 & 50-366/98-03 on 980503-0620.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support,Including Fire Hazards Analysis Requirements IR 05000321/19980021998-06-0101 June 1998 Insp Repts 50-321/98-02 & 50-366/98-02 on 980322-0502.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217N1311998-04-21021 April 1998 Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20217N1101998-04-21021 April 1998 Notice of Violation from Insp on 980208-0321.Violation Noted:Maint Personnel Did Not Follow Procedures & Conducted Work That Was Not Specified on Maint Work Order Which Was Outside Approved Personnel Protection Clearance Boundary ML20216E7931998-03-10010 March 1998 Notice of Violation from Insp on 971228-980207.Violation Noted:As of 980207,measures Not Correctly Implemented in That Proposed Vendor Manual Change for Sys Not Submitted to Reflect Lower Set Point Requirement for PCV 2T48-F466 ML20216E7981998-03-10010 March 1998 Insp Repts 50-321/97-12 & 50-366/97-12 on 971228-980207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20199F5061998-01-23023 January 1998 Notice of Violation from Insp on 971116-1227.Violation Noted:On 971118,4 H Reporting Requirement Was Not Met. Several Workers Involved in Unit 2 Outage Activities Signed Into RCA on Improper RWPs Between 970317-0411 ML20199F5411998-01-23023 January 1998 Insp Repts 50-321/97-11 & 50-366/97-11 on 971116-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3571997-12-15015 December 1997 Notice of Violation from Insp on 971005-1115.Violation Noted:Licensee Failed to Label Properly Eight Spent Vacuum Filters Having Max Contact Dose Rates Ranging from 4.7 to 7.5 Rem Per Hour Which Were Suspended from Unit 1 Catwalk ML20197F3931997-12-15015 December 1997 Insp Repts 50-321/97-10 & 50-366/97-10 on 971005-1115. Violations & Deviations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Operations Re Health Physics Concern ML20197F3711997-12-15015 December 1997 Notice of Deviation from Insp on 971005-1115.Deviation Noted:Unit 2 Was Restarted on 940428 Following Spring Refueling Outage Repairs/Replacement Work Performed Under Design Change Request 96-006 ML20199G9381997-12-0101 December 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:On 970320,L Tillman Engaged in Deliberate Misconduct Causing Licensee to Be in Violation of TS 5.4,by Failing to Rept That Work Was Mistakenly Performed on Valve 2E51-F102 PNO-II-97-060, on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown1997-11-21021 November 1997 PNO-II-97-060:on 971120,plant Operators Manually Scrammed Reactor from 70% Power Due to Damage to Condensate Sys. Flexible Bellows on 2A Condensate Booster Pump Was Overpressurized.Licensee Initiate Controlled Shutdown ML20199B8121997-11-0303 November 1997 Notice of Violation from Insp on 970817-1004.Violation Noted:Written Procedures Were Not Implemented on 970815 & Maintenance Work Was Completed Using Maintenance Work Order W/Inadequate Instructions ML20199B8221997-11-0303 November 1997 Insp Repts 50-321/97-09 & 50-366/97-09 on 970817-1004. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000321/19970081997-10-0303 October 1997 Insp Repts 50-321/97-08 & 50-366/97-08 on 970818-22.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000321/19970071997-09-11011 September 1997 Insp Repts 50-321/97-07 & 50-366/97-07 on 970629-0816.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20196J7431997-07-25025 July 1997 Insp Repts 50-321/97-05 & 50-366/97-05 on 970518-0628. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196J7051997-07-25025 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:On 970609,steps 8.4.5 & 8.5.2 of Administration Control Procedure 30AC-OPS-001-OS,rev 15 Were Not Correctly Implemented ML20149H6651997-07-17017 July 1997 Insp Repts 50-321/97-06 & 50-366/97-06 on 970609-13. Violations Noted.Major Areas Inspected:Licensee Corrective Action Program Including Problem Resolution,Operating Experience Feedback Programs & self-assessment Activities ML20149H6581997-07-17017 July 1997 Notice of Violation from Insp on 970609-13.Violation Noted: Improperly Stored Matl,Which Had Potential to Impact Performance of Safety Related Equipment in Control Room, Was Identified ML20141F8841997-06-17017 June 1997 Insp Repts 50-321/97-03 & 50-366/97-03 on 970406-0517. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F8641997-06-17017 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Listed Examples of Inadequate Testing Procedures Were Identified ML20140C2301997-05-30030 May 1997 Notice of Violation from Insp on 970428-0502.Violation Noted:Policies & Procedures Were Not Adequately Implemented in Employee Assistance Program Info & Released W/O Written Permission from Employee ML20140C2441997-05-30030 May 1997 Insp Repts 50-321/97-04 & 50-366/97-04 on 970428-0502. Violations Noted.Major Areas Inspected:Fitness for Duty, Access Authorization & Physical Security Program for Power Reactors ML20148B8191997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Sections 8.12,8.13,4.2.2,4.7.7 & 8.8.3 of Procedure 30AC-OPS-001-OS Were Not Correctly Implemented IR 05000321/19970021997-05-0505 May 1997 Insp Repts 50-321/97-02 & 50-366/97-02 on 970223-0405. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000321/19973001997-04-0404 April 1997 NRC Operator Licensing Exam Repts 50-321/97-300 & 50-366/97-300 on 970314-20.Exam Results:All Candidates Passed Exam IR 05000321/19970991997-04-0404 April 1997 SALP Repts 50-321/97-99 & 50-366/97-99 for 950528-970222 ML20137F6301997-03-24024 March 1997 Notice of Violation from Insp on 970119-0222.Violation Noted:Design Control Requirements Not Translated Into Specifications ML20137F6451997-03-24024 March 1997 Insp Repts 50-321/97-01 & 50-366/97-01 on 970119-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-97-017, on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed1997-03-13013 March 1997 PNO-II-97-017:on 970312,licensee Reported Employee Collapses Onsite.First Aid Administered Until Ambulance Arrived. Employee Transported to Appling County General Hosp in Baxley,Ga & Pronounced Dead.Autopsy Will Be Performed ML20134L0771997-02-13013 February 1997 Notice of Violation from Insp on 961208-970118.Violation Noted:Written Procedures Were Not Implemented & Listed Examples of Failure to Implement Procedures for Radiation Control Activities Were Identified PNO-II-97-006A, on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions1997-01-30030 January 1997 PNO-II-97-006A:on 970129,plant Shutdown Due to Primary Pressure Boundary Leakage Update.Licensee Continuing to Cold Shutdown Conditions to Perform Addl Corrective Maint Activities.Resident Inspectors Monitoring Repair Actions PNO-II-97-006, on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified1997-01-29029 January 1997 PNO-II-97-006:on 970129,Unit 1 Declared Notice of Unusual Event for Reactor Coolant Pressure Boundary Leakage,As Defined in TS 3.4.4.Resident Inspectors on Site Monitoring Licensee Actions.State of Ga Notified 1999-09-16
[Table view] |
Inspection Report - Hatch - 1990022 |
---|
|
|
Text
h
.
'
l
,
' '
UNITED STATES
.['pito I
-
4 ,
'
[ ' ",o NUCLEAR REGULATORY COMMISslON s ,[ REGION 11-g- g 1 101 MAnlETT A STRE ET, i
e ATL ANT A, GEORGI A 30323
,
g . . . . . p#
t Report Nos.: 50-321/90-22fand 50-366/90-22 Licensee:' Georgia Power Compan P. O. Bor 1295- ,
zr N' Birmingham, AL 35201
,
,
isockot .Nos . : 50-321 and 50-366 License.Nos.: DPR-57 cnd NPF-5 facility Name: Hatch 1 and 2 Inspection Conducted: - October 15-19, 1990 r Inspectors: rMMmN C. Smith '
// - / 9 - 9d DateVigne[
+ 'h H k a 0lw ut M. Thomas 0 IJ~/9- %
Date. Signed L
m ,
- Accompanying Personnel: F. Jape on October 17-19, 1990 !
g ; q o
'b b# # / f/ gp -
'
.
Approved by:.
'
ecO x' A/v7 ev
/ F. Jape, 'Section Chief fate 71gned
/'
y SUMMARY-i my . Scope:
This routine announced inspection was conducted in the areas of Design Changes -
l and Modifications and followup on- SSFI open-items, i; Results:
In the areas inspected, violations or deviations were not; identifie I d
Review < of : completed and partially completed design change packages revealed-
- that plant modifications are made in a controlled andl technically adequate l
, manner. -Licensee management's involvement in. assuring quality is demonstrated >
by the- development .and implementation of an Engineering Quality Improvement - .!
'
'
u Program' intended to improve the quality of engineering deliverables. ~ Review,of
, selected portions of this program. verified that the program has been effective q lin .c meeting specified objectives. .. Additionally, . a Desian Change Reques+ 1 Closecut Program has been effective in reducing the number of plant modiiicatio '
packages which were still.ope !
go1 m osss 901t19 PDR f5 DOCK 05000321 g PDL
k '
,
.
-
,
m
... ..
>
REPORT DETAILS Persons Contacted Licensee Employees i
- K. Breitenback, Engineering Supervisor
. _* D. Edge, Manager, Nuclear Security
- D. Davis, Manager, Plant Administration
- P. Fornel, Manager, Maintenance
- 0. Fraser, Supervisor, SAER
- M. Gauge, Manager, Outage and Planning G. Goode, Manager, Engineering Support
- J. Hammonds,-Supervisor, Regulatory Compliance
- W. Kirkley.. Supervisor, HP/ Chemical Engineering
- J. Lewis, Operations Manager
- D. Madison, Engineering Manager, Hatch Cor *T. Moore, Assistant General Manager, Plant Support
- D. Reid, Acting-General Manager
- J. Robertson, Jr., Acting Engineering Support Manager
- S. Tipps, Manager, Nuclear Safety Compliance
~* Zavadoski, Manager, HP/ Chemistry-Other licensee employees contacted - during this -inspection included ,
engineers and administrative personne Other Organizations c
'
B. Garner, Manager, Hatch Project, SCS
- G. McGaha, Design Manager Hatch, SCS
- K. Khianey, Project Engineer, Bechtel NRC Resident Inspectors
- R.'Musser, Resident Inspector
- Attended exit-interview Acronyms and initialisms used throughout this report are listed in the last paragrap .2; Design Changes and Modifications (37700) DCR 1H89-192, RCIC Low Speed Bypass Line This DCR was implemented to provide an orificed bypass test line with a motor' operated valve around the steam admission valve in order to reduce the severity of the RCIC start transient, thereby reducing che possibility of ' an overspeed trip. This design change was -divir'ed into two part The first part was completed under DCR 1H89~192 which involved the mechanical portions and the routing of electrical cables. The second part will be completed under DCR IH90-072 which involves completing the electrical logic chanbes and cable terminations to make the system operabl DCR l O-072 had not been completed at the time of this inspectio ..
y
-
.
"
.4, (t :.
.
.
. i a
e ti
-
The : inspector performed a field walkdown to verify that DCR 1H89-192 ,
was installed in.accordance with applicable design document l
,
b.- DCR 1H89-249, Diesel Generator Check Valves c ,
The modification irvolved replacing the energency diesel generator (EDG) starting air compressor discharge check valves and the check u '
valves installed in each supply header to the air receivers. The old check- valves were replaced with ones that are believed to provide greater assurance of being leak tight. This modification -
also involved installing a test connection ,to allow venting of the header during check valve testin The inpsector performed field walkdowns of EDGs 1A, IB, and 10 to i verify' that the. check valves were installed in accordance with l design document This modification is scheduled to be implemented for Unit 2.during the next Unit 2 refueling outag '
While reviewing- DCR 1H89-249, the inspector observed thht the acceptance cr.iteria specified in the post modification test special purpose procedure 34SP-111689-DC-1-0S,- DG Air Start Check iValve Functional Test, was greater than the total four hour leakage
,
- specified by desian' engineering. Design engineering specified that the maximum leakage for four hours should be less than 75 psi while ,
s
- the special. purpose procedure acceptance criteria specified 95 ps l The inspector discussed this issu
- with licensee personnel who stated
- that the 95 ~ psi 4value stated'in -the special purpose procedure was used in error. The licensee initiated procedure revisions to. correct the special purpose procedure. prior xto-implementation for Unit 2, and'
to correct surveillance procedure 34SV-R43-014-0S, Diesel Generator
' Air Start Check Valve Functional Tes ,
, ,
The inspector reviewed the completed test results for EDGs IA,1B,.
'
'
and 1C and found' that the . maximum. four hour leakage for any of the:
T_, check valves tested was 16 psi, which was well below the maximum leakagt specified by either design engineering or the value specified
'~
.
Lin the special purpose procedure. This demonstrated that the check valves-were operating properl !
- DCR 1H90-079, .LPCI . Injection Valves-
'
[ ,
' This modification . involved replacing the valve stem and valve disc
'for RHR LPCI injection valves IC11-F017A and 1E11-F017B due to damage to ~ the -valve stem and valve disc of both valves. The exact replacement materials of the' original . stem and disc were unavailable,
.so this change was processed by design engineering who evaluated the adequacy and acceptability of the replacement materia .g
~
, w p -- .,
.
p 4:
- .
^ .
4 DCR 1H90-153, Diesel Generator Undervoltage Relay Time Dial Setting-t This = modification involved changing the time dial setting for - _
'
undervoltage relays CV-7 for each Unit 1 EDG in order for the EDG to it
'
be able to energize their emergency busses in less than or equal to ,
c 12 seconds on an automatic start signal. This issue was discovered by site emergency personnel during efforts to develop the surveillance test procedure to meet this new proposed TS requiremen [
>
The inspector discussed this item with licensee personnel w 4 stated
'that this issue has been discussed in detail with NRC Regional and Headquarters management. The actions taken to resolve this' issue are l y : discussed in greater detail in Licensee Event Report (LER)
50-S?1/1990-017 and NRC Inspection Report 50-321, 366/90-2 e.; 'DCR 2H W-154, Diesel Generator Undervoltage Relay Time Dial. Setting y This modificu+1on'~ involved changing the time dial setting for the undervoltage re'ays for the Unit 2 EDGs as discussed above under DCR
'
2H90-15 DCR No.88-294, 600 Volt Switchgear RER' No._ 87-514. was ' written on September 25, 1987, to request evaluating the installation of micro-verse. trip elements to replace .
,; existing.EC type trip elements.-.An attachment to the-RER documented
'
severe problems with AK_ type breakers equipped with EC trip devices-and: provided a cost-benefit analysis which favored %se of the -
micro-verse' trip devices. The final disposition of GER resulted in
,
'
.the' preparation of DCR No.88-294 with stated design objectives 'of . ,
(1) improving coordination between circuit:breake;s installed in_GE-600V switchgears- 1R23S0034and '1R23S004 and downstream loads, and-(2) reducing maintenance cost associated with,the present: trip device.1 g The' inspector reviewed the; DCP .and verified that a 10 CFR 50'.59
? safety ' evaluation . screening. had been: performed with . no USQ ' , t
'
identified.- Design! basis calculations numbers SNC-85-098, Seismic _
,
Evaluation' of: Micro Versa Trip, Revision 3, and SEN 89-010, Micro -
Versa Trip Coordination Study, - Revision' 2, was verified as ; having been completed.' Selected portions of calculation, SENt 89 010 were reviewed and verified to be technically adequate. . Additionally, d
.
post-modification , test requirements -specifled in surveillance
,
, procedure 52SP-111688-RW-1-05 were: verified as having been
<
' complete Refurbishment of the - circuit breakers and installation of the micro-versa trip units was performed off-site by the OE The work was accomplished 'under PO No. P-02757 which was reviewed by' the inspector to verify that a applicable technical and a quality '
. requirements had been imposed on the vendor. A field walkdown of the
'
installed circuit breakers was performed by the inspector to verify agreement between plant switchgear lineup and design drawings, and calculated trip setpoints versus actual setpoints of selected circuit breaker ,
_j.,
E g s'
, w_
_
,
,j .
'
, ,l " ;. l o
.
~i 4
<
.
$
" g .L :DCR'No 88-349T, 100 Percent Stator Ground Fault Protection Relay DCR'No. 88-349T was written to remove the 100 percent stator ground l fault relay, 64 GSX, from service to facilitate troubleshooting the D relay. This temporary plant mcdification- is non-nuclear safety l related . and was administered under the licensee's temporary modification progra .
The inspector verified by review of objective evidence that (1) disabling of the relay and removal of the NW-511-2 module was performed in a controlled manner via MWO No. 1-88-7849, (2) the TM while still installed was periodically
- reviewed' in accordance with the TM program controls, and 1 '
(3)' reinstallation of the NW-511-2 module and enabling of the relay x af ter ' repairs by the vendor was adequately controlled via MWO 1-89-4815. . Successful completion of post installation test was verified .by review of: document number 571T-S32-002-1N, Brown Bover Type GIX 103. Relay '100 Percent Stator Ground: Fault Protection,
,
Revision s DCR -No.82-173, RHR Time Delay Relays SILE No. 230, Revision 2 dated July 1981, provided information C concerning the: time delay of GE CR 2820 time delay relays used in-
- the core' spray,;RHR, and automatic depressurization system _ The SIL ,
'
stated that the time . delay of the CR 2820 relay tends to increase af ter .long periods > in the de-energized state and recommended .their !
replacement. with Agastat time- delay, relays. The 'above DCP was ,!
prepared in response to DCR .82-173 dated May 25, 1990, and had a-stated design objective of providing the RHR system logic with time '
delay { relays that will maintain their catalog &ct'ied accurac ,
- The scopetof the hardware changes involved the changeout of 11 time delay relay .The inspector revewed the DCP n and determined that part;ai f k implementation of de plant modification ohad been completed with o:
changeout of. relv LIEs 11-K93A and The replacement relays were i'
>
Struthers , Dunn,- model- 236ABX A : documented basis for use
'
of. the' Struthers cDunn relays was notL part of .the ,DCP. Licensee
,
management stated that, ~ based on the poor experience with the
^d Agastat. time ' delay relays, a decision -was made to use Struthers J Dunn relays. The replacement relays are used in the logic for the V RHR' Heat Exchanger -Bypass Valves E11-F048A and B. The inspector verified that'-the10 CFR 50.59 safety evaluation bounded the scope of the -designiactivities,' that the drawings accurately reflected the
~
,
hardware' changes,= and the elementary diagrams correctly implemented-the required logic. with specified time delay. Post modification ,
testing ~ was verified to have been successfully completed in accordance with 'special purpose procedure 42SP-052990-PW-1-1S, -
1-K93A yand 8, Functional Test for DCR 82-173. One minor weakness .
related to the ' absence of installation instructions for the ;
replacement-relays was identifie l
[
,' ~ -
.
o ,
'
-
.
~
e
<
', .? ,
o' 5
'
,9
.- This information was added by FCR 82-173- A walkdown. or the
'
installed relays verified that installation was - completed in accordance with design document <
.No violations or deviations were' identified in the areas inspecte ,
'
< Engineering-Support Activities Engineering Quality Improvement Program p Licensee management . is presently implementing an Engineering Quality Improvement Program intended to improve the quality of engineering ,
. deliverables. The following selected areas were reviewed to ascertain
.
the program effectivenes '
,
(1) FCR Tracking FCRs are the administrative process used for making onsite changes to DCPs prepared by offsite engineering organizations. The licensee has
'
developed and implemented 'a program to evaluate and trend FCRs
ganerated (1) during DCP installation and (2) identified during plant / equipment walkdow A uniform list of reason codes has been prepared;for use by SCS and Bechtel pursuant to the analysis of field change; data 4transnitted to the engineering organizations. The w inspectorEdetermint d that existing work practices related to FCR j tracking needs has lot been incorporated in SCS procedure .
V : Licensee management .has established a goal of not more than two FCRs
'
'
per DCP with. assignable cause to design-engineering activities.~.
,
Quarterly reports with data presented in bar chart form is prepared-A along with FCR tracking forms delineating corrective actions for each i
^ deficiency. At' the time of the' inspection, a summary report documenting. the analysis 'of data gathered up to September 1,1990, j g
had been; prepared for management revie '
_
- ,
,
,
? .An-evaluation of the'effectiveress of the FCR tracking program could not be made given the relatively short. time it has been in effec Baseline ' performance data is presently being gathered and analyse The effectiveness of the program will be demonstrated- after it has-been'in effect for some reasonable tim ' ' l
,
,(2) ABN Program no f '
? '
- ABNs are the administrative process used to document -discrepancie *
identified .between ; approved design drawings / documents and as-found plant installation. If required by plant administrative procedures, a deficiency card is prepared to document the discrepanc Alternatively, an explanation will be provided on the ABN form as to why a deficiency car 3 is not require The inspector determined that Hatch design configuration project had
<
a dedicated staffing leve' of 61 equivalent people during 1989 and 45 equivalent people for 1990. The processing of ABNs were performed in
v ,
-
o
i
-
.. ,
.
m accordance with approved procedures and the results of the drawing
't
-
update activities are as follows:
l'
End of 1988 I, 82' percent of total drawings had no outstanding ABNs i '
End of 1989
!"
94 percent of total drawings had no outstanding ABNs
Current 1990 99 percent of total drawings had no outstanding ABN ,
. Additional statistics presented by the.-licensee demonstrated that the-
, program has been extremely effective.in ensuring plant configuratio All category 1. drawings, which require 30 days to be updated, are current. .There hasE been a significant reduction of Category 3-drawings. . These drawings are updated 90 days after. receipt- of the -
'
third ABN or upon request, and was the largest population that contributed.to lack of configuration contro The results of the drawing; update are as follows:
1989 Category 3: 79,276 1990 Category 3: 457 Updated Category 3 drawings are now controlled as Category 2 drawings
.
which ensure a more- timely revision than.that for Category 3. The inspector- concluded that the ABN-~ program has been effective in maintaining consistency between as design drawings;and actual plant i -installatio '
b.- DCR Closeout'. Program A formalized DCR closeout prog'am was initiated in January 1990, to reduce a backlog of 186 open. DCRs. Phase:1 of the program consisted of (1.'
L defining the DCR closcout-program scope, (2) review cf imp'erisuted het not closed out DCRs for completeness,-(3) verifying accuracy of impimentation ;
by .walkdown, (4) taking corrective acticas as ducrepancies are
'
, ,
identified -(5) updating plant ' documents, and (6) closee:t of the DCR ,
L
,
The program was implemented in accordance with adminis'.rative controls
. delineated.in the fell:.;ir.g procedures / department in=tructions:
Special Purpose Procedure N SP-112989-0B-1-0S, DCR Processing / Voiding Det6iled Instructions, Revision *
C partmental Instruction DI-ENG 42-1189N, DCR Closcout/ Voiding Guidelines, Revision Proced ne 42EN-dG-001-05, DCR Processing, Revision .
.
.
,
'
The inspector verified by review of objective' evidence that, at the time of the inspection, the DCR closeout program had accomplished the following:
122 DCRs had been closed ou DCRs had been voided in accordance with written criteri five %Rs had.been transferred out of the scope of the closecut '
program for.various reason DCRs were still' outstanding awaiting closure ,
Substantial resources were expended by licensee management to accomplish the above tasks via a dedicated group assigned to the DCR Closecut Group. Phase 2 of- tra DCR Closecut Program is presently in the planning stage and is being dev0 loped to. process and close out partially
-
implemented DCRs. Phase 2 will miclude DCRs that are outside the scope of
.
Phase 1, and is intended to assest and complete all required actions for 4 implementing and closeout of approximately 50 partially implemented DCRs having various classification ,
T'he inspectors concluded that-the DCR Closeout Program has been effective sin reducing the number of.open DCRs identified in Phase 1.
L Deficiency Cards and Significant Occurrence Reports
.
Deficiency cards' are used to identify and document problems found in
'
the plant.. The DCs.are initially reviewed for significance and potential impact - on plant. operations' by the STA and applicable unit shift i
. supervisor. ~1tems which.are determined to be significant are given a L significant ~ occurrence. report number by the Nuclear Safety and Compliance Department and are assigned: to various plant departments' for ,
followup and resolution. The percentage of DCs written thus far in 1990
'
< which have resulted in SORS'is approximately three percent. The licensee trends SORS and DCs on a' quarterly basis .
- The inspector reviewed selected SORS which have been assigned to the site Engineering Support Department.- Nearly 40-percent of the 1990 S0Rs were .
assigned to Engineering Support for actio Enoineering Support '
nnagement stated that meeting the SOR response due dates is continually emphasized to engineering personne The inspector. noted that the response dates for SORS assigned .to engineering were met in nearly all
.
instances. The inspector noted a few instances where the SOR responses prepared by engineering were rejected by the PRB and sent back to
' engineering -for a variety of reasons. Subsequent responses for the applicable SORS were resubmitted and accepted by the PR The inspector
.noted that, while a .Sw of the engineering responses to SORS were considered inadequate by J.a PRB, the subsequent review and approval demonstrated that the licensef s overall review process for SORS (including the PRB) was effectivt. in ensuring that adequate resolutions for SORS were being provided by the various department ; 1 r, .-.
Eh'
..
-
..
. Temporary Modifications
The inspector reviewed the licensee's temporary modification program and the- efforts to reduce the TM backlog. A team consisting of
' engineering, maintenance, and operations personnel was formed in mid-1989 to evaluate TMs that were greater than 90 days old. The team recommended removal of those TMs- that could be removed, implementation of DCRs for
.some, and incorporation of repetitive TMs into procedures. This process resulted in the number of TMs greater than 90 days old being reduced from approximately 55 in June 1989 to 18 in September 1989. At the beginning of 1990,' ten TMs greater than 90 days old were open, nine of which were related to the Unit 1 outage. As of October 1990, 15 of the 33 open.TMs were greater than 90: days old. Licensee personnel stated that the main p' . reason for reducing the number of TMs greater than 90 days is to reduce the paperwork load on the unit shift supervisor The goal is to reduce the number of. non-outage TMs to zero. The status of TMs greater than 90 days old are discussed monthly with- the Plant General Manage :The. inspector reviewed selected open TMs and the licensee's administrative controls covering'TMs. .All safety-related TMs are required to be reviewed
- by the PRB prior to implementation. TMs can be installed for up to one
, year. All TMs 'that remain installed for greater than 90 days must be reviewed by Engineering' Support. The unit shift supervisors review the TM logs monthly and identify to Engineering Support those TMs which require review because the TMs are greater than 90 days old. The inspector
.
review ':all the open safety-related TMs that were greater than 90 days e old a verified that both the ~ unit :;hift supervisors and Engineering
, Support reviews > were performed -in accordance with the applicable administrative controls. The following safety.-related TMs were reviewed:-
1-89-0751 Temporary Clamp -to Block OffLAir Leak on Transfer Canal'
i Seal-' Assembly, K '2-90-005 Refueling Bellows Leak Detection Alarm Remove .006 Annunciator for 2E41-F006 0verload Remove ,
2-90-015 Points 14, 16, and 20 : Causing. Ar.nunciation for Recirculation Temperature. Recorde Clamp Placed on Three . Pin Hold. Leakss of PSW Discharge ~
Header Minimum F1ow.
I! The inspector determined from reviewing the' licensee's TM program that the licensee's efforts to control TMs have been effective in reducing the
.
-"
number of outstanding TM I No' violations or deviations were identified in the areas inspecte I !
,
+
' i
,
-
. .
-
. 9 7 '
=t s
7. . ActiononPreviousInspectionFindings(92701)
c a, .(0 pen)IFI 50-321,366/89-08-03, PSW System Design Pressure, j
,
'
h ' A' question was raised during the SSFI with respect to pressure experienced 'by various pieces of equipment in the Reactor Building which are serviced by Plant Service Water System. Specifically, ;
during an accident wherein the Turbine Building plant service water t
flow isolates, the PSW pump backs up its performance curve, resulting .
y": in system pressure slightly higher than normal, The piping i
.
specifications. cover the higher pressure by specifying design and maximum pressure at 180 and 190 psig, respectively. However, several I components have been identified as hning a design pressure lower {
6 than that expected during an acciden ;
- !
.The licensee's action, upon discovery of this item, included'a i justification for continued operations and a' commitment to resolve
- this' issue in the long term. The JC0 was reviewed and accepted by the NRC and work has progressed on the long-term'fix. 'The long-term fix includes several modifications. Design change packages have been
, prepared and approved, but the installation has not been-don Final ,
resolution of this issue will be completed when all hardware fixes l
'
are installed. These are scheduled for future planned outage .(Closed)IFI 50-321,366/89-08-04, Common 10-Inch PSW Discharge Lin This; issue: relates- to a safety concern- raised during the SSFI l
- , 'regarding the common cooling water discharge line for the EDG j
,
'
.o 'and the ' possibility. of losing the cooling water for the'EDG- due j
,
to line blockag . . a
' aThe licensee responded to this question by reviewing the drawings of j
- the piping . system (following Lthe inspection). The-design drawings, H-11600 and H-11146, show a rupture disc, installed downstream of all branch lines connecting to the common discharge' header. The rupture disc _ is designed to fai_1 at 95 psig,'which is a realistic pressure ,
that would be experienced if such'a catastrophic failure occurred, j 1=
~
In addition, the licensee performed a probabilistic evaluation to: I
- determine the risk significance of this: failure. The evaluation :
concluded that pipe collapse contributes less than one ' percent' to l1 the frequency of station blackout occurring at Hatch due to al ~
-l cause ,
)
Therefore, considering the above two actions, this issue is closed.- (Closed) IFI 50-321,366/89-08-07, Emergency Diesel Generator ,
CARD 0X Syste !
During the SSFI, the design basis of the EDG CARD 0X system was J questioned because the basis did not consider the ability of the fire detector switches to withstand a seismic event. In response to this issue, the licensee had the components in question tested at the Wyle Laboratorie All components tested met the established criteria for Plant Hatc " ,
_ ,
.
- -
i
.
. j
. .
Wyle submitted a report, Reference No. 410338-002, to Southern Company )
Services, dated April 17, 1990. The test report described the test i requirements, procedures, and results. The test was completed with no abnormalities and concludes that inadvertent activation of the CARD 0X system would not occur during a seismic event. This closes all action on l
.this issu j (Closed)'IFI 50-321,366/89-08-08, Seismic Qualification of EDG Low ;
Lubricating Oil 3 witche The status- of this. item was reported in NRC Inspection Report No.: 89-30 and -was kept open pending receipt of the seismic qualification documentation for the Allen Bradley pressure switche These switches are: Allen Bradley type 836-C2, MPL No R43-N757A and *
R45-N:757C. To seismically qualify the switches, the licensee sent samples of- ANC0 Engineering. Inc., for testing. The test report indicated the test conditions and concluded that no chatter or bounce occurred upon-change of switch state during the seismic tes Based on these'results, this issue is close J (Closed)IFI 50-321,366/89-08-10, Electro-thermo Links on Diesel Room H Roll-up Doors,and-Fire-Damper The status of this item was reported in NR'C Inspection Report N . The item was kept open because no qualification documentation
-
' was available for the fire damper electrothermal fusible links. The roll-up doors .and . fire dampers for? the EDG building are not ;
safety-related and were purchased without seismic qualificatio The electrothermal ' links are a component of the roll-up doors and j fire damper :l
!
Seismic calculations Lfor the fusible links have been completed by l Southern Company Services. . It was' determined that the fusible links j are seismically adequateifor' the installationLat Hatch. Therefore,
'
the fusible link should not fail'.during a seismic event, and the doors !
should ' remain. open to perform their intended task. The calculations
~
-,
. reviewed were SCN 89-029, Revision- 0, and SCN 89-030, Revision ~
!
,
This-. completes'all action required for this ite .l ExitInterview'(30703)
-
'
The_ inspection scope and results were summarized on.0_ctober 19, 1990, with _,
'
those. persons' indicated in- paragraph 1. The inspectors described the m
areas inspected and discussed in detail the inspection results listed ;
belo Proprietary. ' information is not- contained- in this repor '
Distenting comments ~were not . received from the license a
,
.The licensee was informed that the following items were closed..
I l IFI 50-321,366/89-08-04, Comon Ten Inches PSW Discharge Line L IFI 50-321,366/69-08-07, Emergency Diesel Generator CARD 0X System
.
,
.. ,
, .
-
.. .
-
.
'
M IFI 50-321,366/89-08-08, Seismic Qualification of EDG Low Lubricating
,
Oil Switches IFI 50-321,366/89-08-10, Electro-thermo Links on Diesel Room Roll-up Doors and Fire Dampers-
,
.The licensee was informed that the following item remains ope IFI 50-321,366/89-08-03, PSW System Design Pressure
, Acronyms and Initialisms 1 .AB As Built Notice-DC Deficiency Card
- DCP Design Change Package p iDCR Design Change Request EDG Emergency Diesel Generator FCR Field Change Request G General Electric
+' , IFI Inspector Followup Item l JC0 Justification for Continued Operation Licensee Event Report
'
LER LPCI Low Pressure Coolant Injection, -
<
MWO' Maintenance Work Order
'
.NR Nuclear Regulatory Commission H, ,OEM Original Equipment-Manufacturer
'
-P0 . " Purchase Order
'
PRB' Plant Review Board L -r .
PSI Pounds Per Square Inch Gauge W , PSW' Plant. Service Water
'
> :RCIC -Reactor Core Isolation Cooling i
- .RHR Residual Heat Removal ,
RER- Request for Engineering. Review <
SC Southern Company Services L
'
'SIL Service Instruction Letter
.
-SOR Significant Occurrence Report-l SSF Safety System Functional Inspection m STA Shift Technical Advisor TM: Temporary Modification-
'
'TS Technical Specification USQ Unreviewed Safety Question
[h.'