ML20154K054

From kanterella
Revision as of 06:32, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That 850206 Rev 8 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Items Identified in Encl.Encl Withheld (Ref 10CFR73.21)
ML20154K054
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/06/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
References
NUDOCS 8603110173
Download: ML20154K054 (3)


Text

" ' O A r- n t e n n n * -n m n A - q i vn ..u snnud .i11 Uhhin ; .U.1 p.AR 0 6 G86 Docket No. 50-341 Mr. Frank E. Agosti Vice President Nuclear Operations The Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Agosti:

This is to acknowledge receipt of your letter dated February 6,1986, which transmitted changes, identified as Revision 8, to the " Fermi 2 Physical Security Plan," under the provisions of 10 CFR 50.54(p).

We have reviewed the submitted changes and have detennined that, except for those items identified in the enclosure, they are consistent with the provisions of 10 CFR 50.54(p) and do not decrease the effectiveness of the plan. These changes are, therefore, acceptable.

For those itens identified as being unacceptable under the provisions of 10 CFR 50.54(p), the previously approved plan revisions must be followed.

Should you want to pursue changing the plan under the provisions of 10 CFR 50.54(p), you must resubmit the changes modified to address our coments. In those instances where you desire to pursue the changes without modification, they must be resubmitted under the provisions of 10 CFR 50.90.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P. L.95-511.

The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure.

The enclosure to this letter also contains Safeguards Information and should be protected against unauthorized disclosure.

Sincerely, Original Signed by W. L. Axelson, Chief Nuclear Materials Safety and Safeguards Branch

Enclosure:

Comments (UNCLASSIFIED SAFEGUARDS INFORMATION) g cc w/o enclosure: See i;O Attached List Cncicturn conte.tns SrJECURrn It;r0R!!ATIO!!

84,03110173 S M mi p 34t! Upn s y .m iva Tnis PDR ADOM PDR , Pop 1; Dn atrolled F

e A '- /T I A D70 IM rnnM # ^

m m m u s o . m v . m . v u ..

m ]i \

, ~

. Frank E. Agosti 2 MAR 0 61986 bec w/ enclosure, w/o attached list:

NMSS/SGPR NRR/SSPB SG Case File: 05000034104WA SG Inspector File: Madeda SG Reviewer File 1 NRR Docket File RII '

RI I SIII RIII

/  % L d hw N Kers 1 d ,W t Axe) ion 2dg)/86 1 .

i i

1

. o j FERMI Mr. Frank E. Agosti ,

Vice President Nuclear Operations i The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166 l l

cc: Mr. Harry H. Voigt, Esq. Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N. W. Michigan Public Service Commission Washington, D. C. 20036 6545 Mercantile Way P. O. Box 30221 John Flynn, Esq. Lansing,fiichigan 48909 Senior Attorney The Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U. S. Nuclear Regulatory Commission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Dennis R. Hahn, Chief Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. O. Keener Earle -

Supervisor-Licensing The Detroit Edison Company Fermi Unit 2 6400 No. Dixie Highway Newport, Michigan 48166 Mr. Paul Byron U. S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161 O