Forwards Safety Evaluation Granting 870318 & 880805 Requests for Relief from Inservice Insp Requirements for Pressurizer Support skirt-to-shell Weld
ML20154Q064
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/21/1988
From: Stolz J
Office of Nuclear Reactor Regulation
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20154Q069 List:
References
TAC-65325, NUDOCS 8810030296
Download: ML20154Q064 (2)


Text

'

\ '

SEP 21 1988 I Docket No.'50-423 DISTRIBUTION l -

Speeret m e a DJaffe NRC & Local PDRs OGC SVarga, EJordan BBoger BGrimes Mr. Edward J. Mroczka SNorris ACRS(10)

Senior Vice President Gray File ARM /LFMB Nuclear Engineering and Operations TMurley/JSniezek Northeast Nuclear Energy Company CRossi Post Office Box 270 TBarnhart(4)

Hartford, Connecticut 06141-0270 GPA/PA

Dear Mr. Mroczka:

SUBJECT:

INSERVICE INSPECTION RELIEF REQUEST (TAC NO. 65325)

The enclosed safety evaluation (SE) addresses relief from ASME Code require-ments for inservice inspection (ISI) of the Millstone Unit 3 pressurizer support skirt-to-shell weld. Your request for relief from ASME Code require-ments was submitted by letter dated March 18, 1987, as supplemented by letter dated August 5, 1988.

Based on the review sumarized in the enclosed SE, the staff concludes that the relief granted and alternate inspection imposed through this docurrent give reasonable assurance that the continued weld integrity intended by the Code will be satisfied. In this regard, the licensee has provided acceptable ,

information concerning the proposed alternate inspection as required by 10 CFR 50.55a(a)(3). Additicnally, there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner. Therefore, in accordance with 10 CFR 50.55a(g)(6)(1), we find the relief requested may be granted. The relief is authorized by law and will not endanger life or property or the comon defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.

Sincerely, original signed by Ronald Hernan for John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation r

Enclosure:

As stated cc w/ enclosure:

See r. ext page hg/g ,

g LA: .!-4 PM:f ) 1 b D:PDI-4 OGC Sh rs DJai. r @f CYC ng Npmj l 09/ 7 /88 09 /E 09f /88 $pStolz09/

1 6 /8809/j//88

@sys GP) i h0030296000921 /)

o ADOCK 05000423 1

PNV

i i

Mr. E. J. Hroczka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 3 i cc:

Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Manager of Quality Assurance Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building

  • 475 Allendale Road Ifartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Station Superintendent W. J. Raymond Resident Inspector Hillstone Nuclear Power Station MillstoneNuclearPowerStation Northeast Huclear Energy Company c/o V. S. Nuclear Regulatory Commission :

Post Office Box 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Unit Superintendent M. R. Scully, Executive Director Millstone Unit No. 3 Connecticut Municipal Electric l Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 268 Thomas Road Waterford, Connecticut 06385 Groton, Connecticut 06340 Ms. Jane Spector Michael L. Jones, Manager Federal Energy Regulatory Comission Project Management Department ,

825 N. Capitol Street, N.E. Nassachusetts Municipal Wholesale Room 8608C l

Electric Company Washington, D.C. 20426 Post Office Box 426 Burlington Electric Department c/o Robert E. Fletcher, Esq.

271 South Union Street Surlington, Vermont 05402