ML20210B447

From kanterella
Revision as of 18:03, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-160/87-03 on 870407-10.Violations Noted During Insp Currently Under Consideration for Escalated Enforcement Action
ML20210B447
Person / Time
Site: Neely Research Reactor
Issue date: 04/27/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Karam R
Neely Research Reactor, ATLANTA, GA
Shared Package
ML20210B452 List:
References
NUDOCS 8705050324
Download: ML20210B447 (2)


See also: IR 05000160/1987003

Text

-- - -

. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ __,

f' s

/C/hl/

b : 6-

'

APR 2 7 R37

Docket No. 50-160

License No R-97

eorgia Institute'of Technology

ATTN: Dr. Ratib A. Karam, Director

'Neely Nuclear Research Center

Georgia Institute of Technology

Atlanta, GA 30332

Gentiemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-160/87-03

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

.

Dr. B. K. Revsin on April 7-10, 1987. The inspection included a review of

activities authorized for your Georgia Institute of Technology Research Reactor

facility. At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed' Inspection Report.

Areas examined during the inspection are identified in the report.- Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to_ violate

NRC requirements. The violations and references to pertinent requirements are

described in the enclosed inspection report.

The violations described in the enclosed Inspection Report are under

consideration for escalated enforcement action. Accordingly, no Notice of

Violation is being issued at this time, and no response to these violations is

required. However, please be advised that the number and characterization of

the violations described in the Inspection Report may chang *e as a result of

further NRC review.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRL Public Document Room.

W*W

eE

'

.\

a h

. _ . -

,

L .) 4 ,

g .

Georgia Institute of Technol'ogy 2-

Sho'uld you have any questions,concerning this. letter, please contact us.

Sincerely,

J. Nelson Grace

Regional Administrator-

Enclosure:

Inspection Report-

/cw/ enc 1:

VDr. T. E. Stelson, Vice President

for Research

pcc'w/oenc1:

/ License Fee Management Branch

.

. - - . .

!

RII RII R RII ) I RI RI ,

B sin ey DCollins JPS ohr (Fredric son DVerfell ' Reyes

4/.42/87 4/M/87 4/24/87 4/f/87 4/2tt /87 4/J7/87

4/t}/87

R RII

GJenkins fhst

4/g87 4/)1/87

.