ML20197G744

From kanterella
Jump to navigation Jump to search

Forwards RAI Re Submittals for Possession Only License for Georgia Tech Research Reactor.Response Requested within 60 Days of Date of Ltr
ML20197G744
Person / Time
Site: Neely Research Reactor
Issue date: 12/12/1997
From: Mendonca M
NRC (Affiliation Not Assigned)
To: Hertel N
Neely Research Reactor, ATLANTA, GA
References
TAC-M99370, NUDOCS 9712310112
Download: ML20197G744 (5)


Text

-.

o December 12, 1997 l

- Dr. Nolan E. Herteli Director Neely Research Center ,

Georgia Institute of Technology 900 Atlantic Drive

Atlanta, Georgia 30332 0425 -

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (TAC NO. 99370)

Dear Dr. Nolan:

We are continuing our review of your submittels for a Possession Only License for the-6 Georgia Tech Research Reactor. During our review, questions have arisen for which we-require additionalinformation and clarification. Please provide responses to the enclosed .

request for additionalinformation within 60 days of the date of this letter, in accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or

'af firmation. This roquest affects nine or fewer respondents and therefore, is not subject to Office of Management and Budget review under Public _ Law 96 511. Following receipt of -

~ the additionalinformation, we will continue our evaluation of your application. ,

- If you have any questions regarding this review, please contact me at (301) 4151128,  ;

Sincerely, d

Originalisigned'by:

Marvin M. Mendonca, Senior Project Manager Non Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management

- Office of Nuclear Reactor Regulation Docket Numbers 50-160 b

cc: See next page kfl[] .-

DISTRIBUTION:

- Docket Files30-160)+ PUBLIC PDND R/F

--JRoe 4 SWeiss WEresian .

EHylton OGC TBurdicli TMichaels- I AAdams' MMendonca

- PDoyle . TDragoun SHolmes -

/

- Pisaac -

TDragoun CBassett DMatthews f POND:PM = PDND:LA PDN :D--

              - MMendonca                             EHyltort:                    SWeiss-12/1497                               12/ /97                      12/p7 OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\MENDONCA\GTPOL.RAI 9712310112 971212                                                                             "

PDR ADOCK 05000160 P P,DR , _ u u .. , . ~ j

56 P'4g ' y 1 UNITED STATES -

         #              2            NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30006 4 001
         % * * * * */~~

Decenber 12, 1997 Dr. Nolan E. Hortel, Director Neely Research Center

           . Geor01 a Institute of Technology 900 Atlantic Drive Atlanta, Georgia 30T32 0425

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (TAC NO. 99370)

Dear Dr. Nolan:

We are continuing our review of your submittals for a Possession Only License for the Georgia Tech Research Reactor. During our review, questions have arisen for which we require additionalinformation and clarification. Please provide responses to the enclosed request for additionalInformation within 60 days of the date of this letter. In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. This request affects nine or fewer respondents and therefore,is not subject to Office of Management and Budget review under Public Law 96 511. Following receipt of the adoltionalinformaron, we will continue our evaluation of your application. If you have any questions regarding this review, please contact me at (301) 4151128. Sincerely,

                                                %\                                   M--

Marvin M. Mendonca. Senior Project Manager Non Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Oocket Numbers 50-160 cc: See next page 4

~ [ Georgia institute of Technology Docket No. 50160-Page 1 of 2 - , cc: l

                                                                                                                                                          =

Mr, Charles HiBadgerc _ Mr.E.F.Cobb::  ; Office of Planning and Budget Southern Nuclear Company--  ; Room 608 : -421nverness Center : 270 Washington Street,' S.W.i Birmingham, Alabama 35242 Atlante, Georgia - 30334 Dr. Gl Wayne Clough, President 4 Mayor of City of Atlanta Georgia institute of Technology 55 Trinity Avenue, S.W. Carnegie Building ,

                         - Suite 2400.                                                                 Atlanta, Georgia 30332 0325                                              !

Atlante, Georgia - 30303 Ms. Glenn Carroll

Dr.' William Vernetson 139 Kings Highway
                            ' Director of Nuclear Facilities                                        . Decatur, Georgia 30030
                          - Department of Nuclear Engineering                                                                                                                   ,

i' Sciences ~ Charles Bechhoefer, Chairman' '

                           -University of Florida-                                                     Atomic Safety and 202 Nuclear Sciences Center                                                Licensing Board Panel Gainesville, Florida 32611                                                U.S. NRC, MS: T3 F23 Washington, D.C. 20555 0001 e                             Mr. Pedro B. Perer, Asscciate Dirs: tor Nuclear Reactor Program                  -

Dr, Jerry R. Kline  ; North Carolina State University - / :omic Safety and P. O. Box 7909 .icensing Board Panel < Raleigh, North Carolina -27695-7909 U.S. NRC, MS: T3 F23 Washington, D.C. 20555-0001 Dr. R. U. Mulder, Director

.UVA Reactor Facility. Mr. James C. Hardeman, Jr.

t Dept. of Nuclear Engineering Manager Environmental -

                         - Charlottesville, Virginia 22903 2442:                                         Radiation Program Environmental Protection
                       --    Joe D. Tanner, Commissioner :                                             ' Division

, . Department of Natural Resources Dept. of Natural Resources

                        ;47 Trinity Avenue, S.W.'                                                     State of Georgia
  ' ~
Atlanta, Georgia . 30334 4244 International Parkway Suite 114 -

Dr. Rodney.lce, MORS Atlanta, Georgia 30354 Neely Nuclear Research Center l Georgia institute of To:hnology Dr. Jean-Lou Chameau, Vice Provost

c
900 Atlantic Drive .

Res6erch and Dean of Graduate .

Atlanta, Georgia' 30332-0425- - E2udies Georgia Institute of Technology -
                       .-Ms. Pamela Blockey O'Brien -                                                 225 North Avenue 023 Golden _ Valley :                                                    Atlanta. Georgia 30332 0325-
Douglasville, Georgis 30134 ,

t s

                    ,g .,,,,yy             4  p    __.-    ,                , , , . __ , ,,   p ,               , _ , , , - ,.,_pp. .,,.,,,     ,.n,        ,_y -. 1   ,#,. -.

l .. l , ll Georgia Institute of Technology Docket No. 50-160 Page 2 of 2 cc: Dr. Nolan E. Hertel, Director Dr J. Narl Davi:Ison, interim Dean Neely Research Center Chair, Technical and Safety Review Georgia Institute of Technology Committee 900 Atlantic Drive Georgia Institute of Technology Atlanta, Georgia 30332 0425 -225 North Avenue Atlanta, Georgia 30332-0360 Dr. Peter S. Lam Atomic Safety and Licensing Board Panel U.S. NRC, MS: T3-F23 Washington, D.C. 20555 0001 i

REQUEST FOR ADDITIONAL I 'ORMATIOlJ GEORGIA TECH RESEARCH REACTOR DOCKET NUMBERS 50160

1. Technical Specification (TS) 2.2 should specif / what monitors are required when activities related to radioactive material are t.. ' oorformed. Alternatively, a statement such as "No activities related to radlowtive materials will be performed unless the monitors specified in Table El are operable."
2. Provide analyses to demonstrate that the Tritium Monitor is no longer required af ter the heavy water is removed from the reactor f acility.
3. In Table 2.1, there are setpoints for the tritium, the moving filter particulate, and the filter bank monitors that are based ore an annual calibration. Additional specificity is needed. Therefore, p ovide a value or a multiple of background for these monitors, or provide the specific calibration procedure to establish those setpoints.
4. TS 2.3 specifies applicability of "as long as heavy water is stored." Containment integrity should be required as long as this barrier to radioactive materials is required.

Provide calculational verification that for all potential activities after removal of the heavy water (including decommissioning act8vities) containment integrity is not required. Alternatively, provide a revision to the TS to require containment integrity during activities with radioactive motorials.

5. Table 3.1, footnote (1) limits applicability to conditions that could cause "high radiation area." This monitor provides indication for radioactive conditions below this threshold and the applicability should be changed to so indicate. Further, it should be consistent with the requirement for tho instiument in TS 2.2.
6 Table 3.1, footnote (2) limits applicability to conditions that could cause "altborne release to the containment." Provide a reference to the methodology that will be used to determine these conditions (e.g., in basis provide verification that a f acility procedure will be established and used).
7. TS 5.0.a indicates "and f ax." Fax service is not at the number specified and is not required by NRC guidance. Eliminate the referral to fax or provide justification.}}