ML20214N637

From kanterella
Jump to navigation Jump to search
Forwards Summary of 870504 Enforcement Conference Re Findings Discussed in Insp Rept 50-160/87-03 Concerning Mgt Control of Health Physics & Operations Groups.List of Attendees Also Encl
ML20214N637
Person / Time
Site: Neely Research Reactor
Issue date: 05/15/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stelson T
Neely Research Reactor, ATLANTA, GA
References
NUDOCS 8706020252
Download: ML20214N637 (3)


See also: IR 05000160/1987003

Text

m

_ ..

MAY 151987

Docket No. 50-160

License No. R-97

- jGeorgia Institute of Technology

/ ATTN: Dr. T. E. Stelson, Vice President

for Research

Atlanta, GA 30332

Gentlemen:

SUBJECT: ENFORCEMENT CONFERENCE

(NRC INSPECTION REPORT N0. 50-160/87-06)

This refers to the Enforcement Conference held at the Region II Office on

May 4, 1987. This Enforcement Conference concerned activities authorized by

NRC License No. R-97 for your Research Reactor facility. The Conference

related to findings discussed in Inspection Report No. 50-160/87-03 which was

forwarded to you on April 27, 1987.

Attendance at the Enforcement Conference and the subjects discussed are

described in the enclosed Enforcement Conference Summary.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, please contact us.

Sincerely,

' S.I

J. Nelson Grace

Regional Administrator

Enclosure:

Enforcement Conference Summary

pccw/oenc1:

t/ License Fee Management Branch

bec w/ encl:

Document Control Desk

State _of_ Georgia _

RI RII -

RII RIT RII RII RII

CM C-

' sin CHosey Do ins

1

JP53chr h redicksonDVerrelli M

klReyes

Ji/3/87 $/f/87 ,3/ /87 J/6 /87 S g/87 Jg /87 g/) /87 @

-

6ll /$

<

8706020252 870515

PDR ADOCK 05000160 ,

G PDR ,

di xso/

e

. *

ENCLOSURE

Enforcement Conference Sumary

Licensee: Georgia Institute of Technology

Facility: Research Reactor

License No.: R-97

Docket No.: 50-160

Subject: Management Control of Health Physics and Operations Groups

An Enforcement Conference was held in the NRC Region II Office on May 4, 1987,

to discuss the management control of health physics and operations groups at

the licensee's Research Reactor.

The attendance list is attached to this Sumary.

Licensee representatives discussed the history of reactor operations at the

facility and the potential reorganization of the Nuclear Research Center

whereby the radiation protection function would begin to report to the

Director of the Center. The licensee also discussed the possible merger of

the campus-wide Radiation Safety Comittee and the Nuclear Safeguards

Comittee into a single Comittee. It was felt that such a merger would

improve the Center's audit function and thus improve the licensee's

proficiency in self-identification of problems. The licensee stated that

July 1, 1987 is a target date for this reorganization, and that the

announcement of the reorganization should take place by June 1, 1987.

NRC representatives discussed the NRC Enforcement Policy in general and

stressed the need for improvement in management oversight of facility

programs. The importance of verbatim compliance with Technical Specifications

and internal procedures, and a corrective action program was stressed.

4

'l

r 1

. . ..

ATTACHMENT

Enforcement Conference Attendees

. Georgia Institute of Technology

T. E. Stelson, Vice President for Research

R. A. Karam, Director,- Nealy Nuclear Research Center

R. M. Boyd, Radiation Safety Officer

. F. Rossini, Director, Interdisciplinary Programs -

Nuclear Regulatory Commission-

J. N. Grace, Regional Administrator

L. A. Reyes, Director, Division of Reactor Projects (DRP)

J. P. Stohr, Director, Division of Radiation Safety and Safeguards (DRSS)

G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff

(EICS)

P. Fredrickson, Section Chief, Reactor Projects Section 1A, DRP

C.- M. Hosey, Chief, Facilities Radiation Protection Section (FRP), DRSS

W. H. Rankin, Technical Assistant, DRSS

- B. K. Revsin, Radiation Specialist, FRP, DRSS

S. Vias, Project Engineer, DRP

C. H. Bassett, Radiation Specialist, FRP, DRSS

L. Trocine, Enforcement Specialist, EICS

A. R. Long, Reactor Engineer, Division of Reactor Safety (DRS)

P. Burnett, Reactor Inspector, DRS

'

B. Uryc, Enforcement Coordinator, EICS

G. B. Kuzo, Radiation Specialist, FRP, DRSS

,

I-

!

-

m- e-we-r,--m-e e,----mw-~e,e 4 ,m.a.w-.--w-, --w,~~m, p.-s - w ~ v gen.m ww e---e-r,,,w -w w.s e -,- ymr- --gyyun - e , - w,,,we w+m=