ML20151C052

From kanterella
Jump to navigation Jump to search
Forwards Amend 7 to License R-97 & Safety Evaluation.Amend Removes Authority to Receive & Possess Up to 700 Grams U-235 in Form of AGN-201 Reactor Fuel,Allows Nitrogen to Be Used as Cover Gas & Clarifies Number & Timing of Samples
ML20151C052
Person / Time
Site: Neely Research Reactor
Issue date: 07/12/1988
From: Alexander Adams
Office of Nuclear Reactor Regulation
To: Karam R
Neely Research Reactor, ATLANTA, GA
Shared Package
ML20151C055 List:
References
NUDOCS 8807210209
Download: ML20151C052 (6)


Text

. .

. A July 12, 1988 l l

Docket No. 50-160 Dr. Ratib A. Karam Director, Neely Nuclear Research Center Georgia Institute of Technology 900 Atlantic Drive Atlanta, Georgia 30332-0425 Dear Dr. Karam. l l

SUBJECT:

ISSUANCE OF AMENDMENT NO. 7 TO FACILITY OPERATIrlG LICENSE NO. R GEORGIA INSTITUTE OF TECHNOLOGY The Commission has issued the enclosed Amendment No. 7 to Facility Operating License No. R-97 for the Georgia Tech Research Reactor (GTRR). The amendment consists of changes to the Technical Specifications in response to your submittals dated August 6, 1987, as supplemented, and March 1, 1988.

The amendment (1) removes the authority to receive and possess up to 700 grams of U-235 in the form of AGN-201 reactor fuel, (2) allows nitrogen to be used as a cover g's in the GTRR, (3) clarifies the number and timing of samples to be anaifzed in connection with release of the contents of the liquid waste tanks to the sanitary sewer, and (4) changes the organizational structure of the GTRR and expands the responsibilities of the Nuclear Safeguards Comittee (NSC).

A copy of the related Safety Evaluation supporting Amendment No. 7 is enclosed.

Sincerely, Dr"ginn1 Signed Hv:

Alexander Adams, Jr., Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects Office of Nuclear Reactor Regulation l

Enclosures:

1

1. Amendment No. 7
2. Safety Evaluation i cc w/ enclosures:

See next page 8807210209 PDP ADOCK 05000907 h P

,Distributioni UDocket File " JPartlow DHagan AAdams NRC & Local PDRs TBarnhart (4) EJordan GPA/PA PDSNP Reading Wanda Jones BGrimes OGC-Rockville DCrutchfield EButcher LRubenstein ARM /LFMB EHylton ACRS (10) CMcCracken PDSNP* PDSNP* ECEB* PDSNP* OGC-ROCKVILLE*

EHylton:1s AAdams CMcCracken LRubenstein o 05/31/88 06/08/88 06/09/88 06/21/88 06/24/88 tD i

  • See previous concurrence (F

Dr. R. A. Karam l practice, which is consistent with the guidance of ANS-15.1, we have added to the Technical Specifications the requirement for annual audits of operations at the GTRR.

A copy of the related Safety Evaluation supporting Amendment No. 7 is enclosed.

Sincerely, Alexander Adams, Jr., Project Manager Standardization and fron-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projpets Office of Nuclear 6 actor Regulation

Enclosures:

1. Amendment No. 7
2. Safety Evaluation cc w/ enclosures: /

See next page Distribution ,-

Docket File JPartlow /

NRC & Local PDRs TBarnhart (4)

PDSNP Reading Wanda Jones DCrutchfield EButcher EHylton ACRS (10)

AAdams ,GPA/PA OGC-Rockville ARM /LFMB DHagen EJordan PDSNP* ,PDSNP* ECEB* P OGC-ROCKVIhhE,j EHylton:ls AAdams CMcCracken LRu enttein f. CheCJ C 05/31/88 06/08/88 06/09/88 06/0/88 06/8//88

  • See previous concurrence 7 1/N /

v Docket.No. 50-160 Dr. R. A. Karam Page 2 practice, which is consistent with the guidance of ANS-15.1, * 'ad to the Technical Specifications the requirement-for annual audit , ions at the GTRR.

A copy of the related Safety Evaluation supporting Amendment No. 7 is enclosed.

Sincerely, Alexander dams,'Jr., Project Manager Standar zation and Non-Power Reac or Project Directorate Divi on of Reactor Projects III, IV, and Special Projects ,

fice of Nuclear Reactor Regulation  ;

i

Enclosures:

1. Amendment No. 7
2. Safety Evaluation l

cc w/ enclosures:

See next page Distribution Docket File JPartlow NRC & Local PDRs TBarnhart (4)

PDSNP Reading Wanda Jones DCrutchfield EButcher EHylton ACRS (10) ,

AAdams GPA/PA  !

OGC-Rockville ARM /LFMB i DHagan EJordan g i PDSNP* PDSNP ECEr PDSNP OGC-ROCKVILLE EHylton:1s AAda CMcCracken LRubenstein 05/31/88 06/s /88 06/f/88 06/ /88 06/ /18

  • See previous concurrence .

Docket No. 50-160 Dr. R..A. Karam Page 2 i

practice, which is consistent with the guidance of ANS-15.1, we ave added to the: Technical Specifications the requirement for annual audit of operations' at the GTRR.

A copy of the related Safety Evaluation supporting Amend nt No. 7 is enclosed.

Sincercly, l

Alexand Adcms, Jr., Project Manager Stand dization and Non-Power Re tor Project Directorate l Div sion of Reactor Projects III, IV, and Special Projects fice of Nuclear Reactor Regulation

Enclosures:

1. Amendment No. 7
2. Safety Evaluation cc w/ enclosures:

See next page Distribution Docket File JPartlow NRC & Local PDRs TBarnhart (4)

PDSNP Reading Wanda Jones DCrutchfield EButcher EHylton ACRS (10)

AAdams GPA/PA OGC-Rockville ARM /LFMB DHagan Edordan PDS P ' PDSNP PDSNP OGC-ROCKVILLE EH < n:ls AAdams N 05/Jl/83 04/ /8% LRubenstein 0@ /81 b d/ /8%

CkCRWW

%I 186

< o UNITED STATES l

! o NUCLEAR REGULATORY COMMISSION h  ;$ WASHINGTON, D. C. 20555 s.,*..../ July 12, 1988  ;

1 Docket No. 50-160 l

1 Dr. Ratib A. Karam Director, Neely Nuclear Research Center Georgia Institute of Technolcgy 900 Atlantic Drive Atlanta, Georgia 30332-0425

Dear Dr. Karam:

1

SUBJECT:

ISSUANCE OF AMENDMENT NO. 7 TO FACILITY OPERATING LICENSE NO. R GEORGIA INSTITUTE OF TECHNOLOGY ,

l The Commission has issued the enclosed Amendment No. 7 to Facility Operating 1 License No. R-97 for the Georgia Tech Research Reactor (GTRR). The l amendment consists of changes to the Technical Specifications in response to l your submittals dated August 6, 1987, as supplemented, and March 1, 1988.

The amendment (1) removes the authority to receive and grams of U-235 in the form of AGN-201 reactor fuel, (2)allows possess up toto700 nitrogen be used as a cover gas in the GTRR, (3) clarifies the number and timing of samples to be analyzed in connection with release of the contents of the liquid waste tanks to the sanitary sewer, and (4) changes the organizational structure of the GTRR and expands the responsibilities of the Nuclear Safeguards Committee (NSC).

A copy of the related Safety Evaluation supporting Amendment No. 7 is enclosed.

Sincerely, l Ab 1 Alexander Adams, Jr., P'.of t Manager Standardization and Non- wer Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

1. Amendment No. 7
2. Safety Evaluation cc w/ enclosures:

See next page

'- Georgia Institute of Technology Docket No. 50-160 cc: Office of Planning and Budget Room 615B 270 Washington Street, S. W.

. Atlanta, Georgia 30334 Mayor of City of Atlanta Atlanta, Georgia 30301

/

l 1

i i

.-.- . . - - , - . - - . ...,.-. ..-- - _ . . . . . . ~ . - . . , , . . , - . . . - . , . - , . - . . . - . - . -