ML20148K296

From kanterella
Jump to navigation Jump to search
Forwards Results of Retake Exams Administered on 960408 & Initial Exam Rept 50-160/OL-97-02.Exam & Answer Key Encl
ML20148K296
Person / Time
Site: Neely Research Reactor
Issue date: 06/11/1997
From: Mendonca M
NRC (Affiliation Not Assigned)
To: Karam R
Neely Research Reactor, ATLANTA, GA
Shared Package
ML20148K298 List:
References
50-160-OL-97-02, 50-160-OL-97-2, NUDOCS 9706170420
Download: ML20148K296 (3)


Text

.- . - . . . - . . - - - .- _ _- . - - .-.~. - ... - -... - - - _ -

i June 11, 1997 l t

Dr. Ratib A' Karam, Director Neely Nuclear Research Center -

Georgia institute of Technology Atlanta, Georgia 30332 '

Gentlemen:

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-160/OL-97-02 During the week of April 8,1996, the NRC administered retake examinations to employees of your facility who had applied for a license to operate your Georgia Institute of Technology Reactor. The examination was conducted in accordance with NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this exarnination, please contact me on (301) 415-2170.

Sincerely, original signed by: Ted Michaels for Marvin M. Mendonca, Acting Director Non Power Reactors and Decommissioning Project Directorate l Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-160

Enclosures:

1. Initial Examination Report 1 No. 50-160/OL-96-01
2. Examination and answer key (RO/SRO) cc w/encis:

See next page t DISTRIBUTION w/ encls.:

PUBLIC DISTRIBUTION w/o encls.:

PDND R/F Q % {i t Mstosson MMendonca, PM Sweiss Facility File (DmcCain)

Document Control PUBLIC

' LTremper, LFDCB (T-9 E-10) Docket Files (50-160)3 DOOUMENT NAME: G:\

To receive e capo of this document, indicate in the bos: 'C' = Copy without attacriment/ enclosure *E* = Copy with attachment / enclosure "N" = No copy OFFICE PDND ,_ lE F OJBJA [I PDND:D A J l l J NAME- PDoyle fSCJ 6M@ain MMMendoncaP DATE 06/f /97 06pt/97 06/ff/97 '

7FFICIAL COPY 9706170420 970611 PDR V

ADOCK 05000160 PDR

%= h h h A f f _ n

, , , , _ . . , ~ . ,,-e: .-. -

0-

  1. w%

3- 4 UNITED STATES g ,p* NUCLEAR REGULATORY COMMISSION o WASHINGTON, D.C. 20555-0001 9 . . . . . ,o June 11,1997 Dr. Ratib A. Karam, Director Neely Nuclear Research Center Georgia Institute of Technology Atlanta, Georgia 30332 Gentlemen:

SUBJECT:

INITIAL EXAMINATION REPORT NO. 50-160/OL-97-02 During the week of April 8,1996, the NRC administered retake examinations to employees of your facility who had applied for a license to operate your Georgia Institute of Technology Reactor. The examination was conducted in accordance with NUREG-1478, "Non-Power Reactor Operator Licensing Examiner Standards," Revision 1.

j in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

i Should you have any questions concerning this examination, please contact me on (301) 415-2170.

Sincerely, h

Marvin M. Mendonca, Acting Director Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Prograra Management Office of Nuclear Reactor Regulation Docket No. 50-160 Enclos res: 1. Initial Examination Report No. 50-160/OL- 96-01

2. Examination and answer key (RO/SRO) cc w/encis:

See next page 4

4 Gsorgin Institut2 of Technology Docktt No. 50-160 cc:

Mr. Charles H. Badger Mr. E. F. Cobb Office of Planning and Budget Southem Nuclear Company Room 608 42 Invemess Center 270 Washington Street, S.W. Birmingham, Alabama 35242 Atlanta, Georgia 30334 Dr. G. Wayne Clough, President Mayor of City of Atlanta Georgia Institute of Technology 55 Trinity Avenue, S.W. Camegie Building Suite 2400 Atlanta, Georgia 30332-0325 Atlanta, Georgia 30303 Ms. Glenn Carroll Dr. G. Poehlein 139 Kings Highway Vice President for Interdisciplinary Decatur, Georgia 30030 Programs Georgia institute of Technology Charles Bechhoefer, Chairman 225 North Avenue Atomic Safety and Atlanta, Georgia 30332 Licensing Board Panel U.S. NRC Dr. William Vemetson Washington, D.C. 20555-0001 Director cf Nuclear Facilities Department of Nuclear Engineering Dr. Jerry R. Kline Sciences Atomic Safety and University of Florida Licensing Board Panel 202 Nuclear Sciences Center U.S. NRC Gainesville, Florida 32611 Washington, D.C. 20555-0001 Mr. Pedro B. Perez, Associate Director Dr. Peter S. Lam l Nuclear Reactor Program Atomic Safety and  ;

North Carolina State University Licensing Board Panel P. O. Box 7909 U.S. NRC Raleigh, North Carolina 27695-7909 Washington, D.C. 20555-0001 l l

Dr. R. U. Mulder, Director Mr. James C. Hardeman, Jr.

UVA Reactor Facility Manager Environmental Dept. of Nuclear Engineering Radiation Program Charlottesville, Virginia 22903-2442 Environmental Protection Division Joe D. Tanner, Commissioner Dept. of Natural Resources Department of Natural Resources State of Georgia 47 Trinity Avenue, S.W. 4244 Intemational Parkway Atlanta, Georgia 30334 Suite 114 Atlanta, Georgia 30354 Dr. Rodney Ice, MORS Neely Nuclear Research Center Georgia institute of Technology 900 Atlantic Drive Atlanta, Georgia 30332 0425 Ms. Pamela Blockey-O'Brien l D23 Go! don Valley I Douglasville, Georgia 30134