Forwards Scotch Brand Tapes Maint Procedure GMP-ELEC-008, Installation Instructions, Rev 0 to QUAL-M345-00, Preliminary Equipment Qualification Record for 3 M Tapes & QUAL-A602-00, Qualification of Splices ..
ML20212B687
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/19/1986
From: Mcgaughy R
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20212B692 List:
References
NG-86-4544, NUDOCS 8612290295
Download: ML20212B687 (4)


Text

_. _. ..

bm8 PRIORITY ROUTIM lows Electric Light and Power Company gy1 i

December 19, 1986 s iteMC NG-86-4544 4l g- -

ir [.__

Mr. James G. Keppler Regional Administrator Region III U.S.' Nuclear Regulatory Comission 799 Roosevelt Road

. G1en Ellyn, IL 60137

Subject:

Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 Qualification of Electrical Splices File: A-64

Dear Mr. Keppler:

On the afternoon of December 9,1986, Iowa Electric Light and Power Company received information regarding qualification of nylon insulated electrical butt splices. This equipment is witMn the scope of the Duane Arnold Energy Center (DAEC) Equipment Qualification (EQ) program and was previously considered to be qualified based on test data, analysis and similarity.

Several days earlier, we had become aware that f ailures of nylon-insulated butt splices had occurred recently during qualification tests conducted by a testing lab for another utility. Based upon

, information which we had received orally, we had concluded that the qualification test conditions for these components were more severe than those required for the DAEC environmental envelope and, therefore, that the test f ailures were not necessarily relevant to the qualification of butt splices installed at the DAEC. However, on December 9,1986, we received orally information which indicated that, due to an error at the testing facility, the irradiation of the test specimens was, in fact, less conservative than the environmental envelope for the DAEC EQ program. This information was imediately reviewed by Iowa Electric management and a plant shutdown was initiated. It was our intention that the plant was to remain in a shutdown condition until the electrical splices in question could be qualified by repair or replacement.

d 8612290295 861219 PDR ADOCK 05000331 i P PDR. g C

cc,,na anu . , o. ~ ssa . ccs a.vis i s2<os sasison.<<,,

,2a #

1

s Decenber 19, 1986 NG-86-4544 Page Two The scope of the work to be performed during the shutdown was initially limited to replacement of the nylon-insulated butt splices in the drywell penetration boxes with nuclear grade AMP butt splices. The scope of.the work has now been expanded because of information received from the NRC subsequent to the plant shutdown.

A question exists regarding the qualification of the nuclear grade butt splices in a steam environment; therefore, we are applying a seal on all butt splices within the scope of the EQ program which are located in potential high energy line break (HELB) areas. The seal is applied by covering the splices with an insulating tape to prevent moisture intrusion.

The environmentally qualified taping process is described in Attachment 1.

The qualification of the tape used for the seals and justification for use of the tape seals is contained in Attachment 2. The nylon insulated butt splices located in the drywell penetration boxes were replaced with the r:sclear grade butt splices and a tape seal was then applied. Other butt sclices located in potential HELB areas were not replaced, but a tape seal was applied to these splices whether they were of the nylan or nuclear grade insulating jacket design.

The concerns related to the use of the AMP butt splices are primarily related to moisture intrusion, which is not a concern for splices located in the non-HELB areas. However, there is some question as to whether the butt splices meet the criteria of IEEE-323-1974. Iowa Electric will continue to review this issue and will upgrade any deficient or questionable butt splices to meet those criteria during the next refueling outage. That outage is expected to begin in mid-March, 1987. Justification for not taping the butt splices in non-HELB areas during the interim period is contained in Attachment 3.

l l

l

f._

December 19, 1986 NG-86-4544 Page Three .

I It is our belief that the program outlined above and further explained {

in the attachments adequately justifies and doctanents the qualification of i the electrical butt. splices installed at the DAEC, and addresses the  !

questions raised by the NRC staff during telephone discussions on this subjec_t and during the special inspection by Region iII personnel during December 16 and 17, 1986.

Please contact this office if there are questions regarding this subject.

Very truly yours, i e 4

Richard W. McGa ghI Manager, Nuclear Division l Attachments: 1. Scotch Brand Tapes Installation i

Instructions

2. Evaluation of 3M Tape Splice Insulation
3. Evaluation of Non-HELB AMP Butt-Splices RWM/8WR/pjv*

cc: 8. Reid L. Liu-L. Root B. Gilbert 7 NRC Resident Office 1

gm.. . .r . .A . r.

Attachment 1 to NG-86-4544

. .[, t i l( Ir.A- W O F tJ I N G C O F' Y [] vunenue nuuri COPY

. l t r.a o r t r e DCF Only . F e r nianere t DCF Oril u X T e n.r o r a r v / F o r s. a n e n t DCF In2 t i, to: I. 'irJ A L D E OFi D AN I e o a t i n.e ri t ME T e n. > Dr.r Nc . D 6 - T -- 0 6 21 Dcte It 2ttat-d 12/13/86 Po r n. DiF N .. 86-r-2052 T e ni t o r ,i e w F entw Due 01/12/D7 Pe r nie nen t Ar r ro. e l i.. O ? /1 1/ E.7 T e n.s o r t r v C 5 i r e t i c.n : Dete W 00.- Othei UNTIL F E F r. A '; f r.

Docun. erst No. GMF'-ELEC-000 C u r i er.t Fev. O Fr..Dac 12/10/0/.

Title SCOTC- FF.AND TAPFL I iC. T AI L A T I .a I rr. T R UC T I n:irn.

Des c r i e t t or- of Chcosn (Attech rasos 4. riec es t e r v. ) :

RENOVE PEFE:ENCE TO THE USE OF EYIST:*0 N i L 0 r! S P L I C E S . C H A N ::.E RE IPENCE TO TRICHLOR 1 cECTFOCLEAN 50LVENTL. R E V I E !. A T T A C HriE N T 1 Rees.on for c e r.s e (Attach r ;,5 c i ss r.e esserv.):

TO MALE FFO:EDUPE MOFE CLEAF AND FAS E; TO U5E AND FOi l 0tJ.

Ten Por a t v Chsnse Inf o rnis t z or. Feviews:

10 CFF 50.E; Anvlicebility g


~~---O/N------------------------------------

C AT E G O R'r OF CHANGE: C] New I ocedure Editorir; Chance [] P r o c e : o r r. Inactivat2on or Peact;.etion Procedure I r. <- r o v e n e n t C3 Chanse Concerns Safets Intent or Function

1. Does the =rocedure c h a ri < e effect .- description of the fec:1.tv or
  • opeistlo: of s y s t e n.s and/or co p orsite as de e.r i i l.e d in th+ IJr:AR' vet & +*__-_._.
2. Does the 5rocedure c ha r.se creete s test o i- eneerinani the t 5' ace-the e l t r.* or e o v 1 F r.i e ri t in c c a r.d i t . ::re not described in t h.. U : : A r,1

's.+ D 0~'. ---.

3. Could the rrorcs-1 -ffect nucleer afe t- i- e was n '. t e.s;us-  :

by the ie ~ i A F i vet oc (If eny : the eb_ e c r.s we r s were 23 t h e r. eitsch 6 w r i t '. e .- - - - -----

5-f e l ' E.slurtion.)

4. Is a cha is to Techn2es) Ssec2fie ...is r e c. u 2 r e d ?

vc.Q / .__.

(If iT E

  • e r, the e ce - eli not ;- nsh.

- 2 a m /

Initiator .AAc _ _O _ _ '_______ D e t e /_ /J 6 Plant Nnst.  :

. tiff __he

__. c __ D s t e /,2,y[ [g 6

. _ _ _ _ _ _ _ _ __..j. _ . . . _ _ _ _ . . . . . . _ _ . - .

_ _ _... . _ _ _ _ ____ _ 5 4 _.._ _. ._ . . _ .

Ten.ForEr- DGte FCrr.tnei.t D5tc Or. Shift 5.-ervisor . _M _b_ _ _ _ _ - _ / /.2 - O ~ [(-

Assistent F ' 5 it S u r . _ - - _ _ - _AM_ - . _ _ - _ _

. _ / _ .. _ _ .. . _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ / _ _ _ _ _

Oresatlor.i C o n nii t. t e e RevieM C] Te t [] Pern.

C h a i r rn a n , G. C. __ -____k_d______ . ./__--- -___________________/_____

Plant S u F e r : s t. e n d e n t _ _ _ _ - - _N- _ _ _ ._ _ _ _ _ / _ _ _ .. _ _ _ _ _ _. _ _ _ ._ _ _ ._ . _ .. . _ _ _ / _ . .

Fernianent DCr esncelled af not ss+ro.e. In 60 dsws. N C- - 0 7 ~ . . REV. 0

.