ML20207L835

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Rev 59A to Deac Emergency Telephone Book & non-proprietary Rev 20 to Section H of DAEC Emergency Plan, IAW 10CFR50,App E.Proprietary Info Withheld
ML20207L835
Person / Time
Site: Duane Arnold 
Issue date: 03/10/1999
From: Sullivan P
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137A847 List:
References
NEP-99-0033, NEP-99-33, NUDOCS 9903180289
Download: ML20207L835 (3)


Text

-

~.

i

]F A L LI A N T UTlLiTIES its vahtie inc.

Il'",[>r^{"[O"" '""'"

IES Utilities Palo IA 52324 9785 Ofhce: 319.K513611 March 10,1999 Fax: 319.8513986 NEP 99-0033

~ " " ' " " ' " " " ' " " '

Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Project:

Duane Arnold Energy Center

Subject:

Transmittal of the Emergency Telephone Book File:

A-304 To Whom It May Concern:

We are forwarding, in accordance with Appendix E to 10CFR50, three controlled copies (one to NRR and two to NRC Region Ill) ofour Duane Arnold Energy Center Emergency Plan Revision Emergency Plan Implementing Procedure Revision Duane Arnold Energy Center Emergency Telephone Book Revision

_59A_

(The Emergency Telephone Book is considered to be proprietary to Alliant Energy.)

[

l Insert the revised document (s)in your files and remove from the docket revision 59 Sections A and B only of Duane Arnold Energy Center Emergency Telephone Book dated January 18, 1999. The Emergency j

Telephone Book is, in total, considered to be proprietary to Alliant Energy.

j Sincerely, 1)h,

<d Paul R. Sullivan Manager, Emergency Planning Enclosures cc:

Manager, Regulatory Performance Emergency Planner NRC Region Ill (2) 9903190289 990310 i

PDR ADOCK 05000331 F

PDR G.o w

eaa

, ' ' ?,,,psy 0

1,70 0~ '7' Nodt I

/

II.

5.

ALLIANT -IES UTILITIES DUANE ARNOLD ENERGY CENTER TRANSMITTAL / ACKNOWLEDGMENT MEMORANDUM Manual # 91 i

NRC-NRR/ Document Control Desk Washington, DC DATE: March 9.199_9

SUBJECT:

DAEC Emergency Plan i

Please discard your Revision 19, Section 11 and replace it with Section II, Revision 20 that is enclosed.

If you should have any questions, please contact Don Johnson at (319) 851-7872. EfTective date for the change is March 15,1999.

Please acknowledge that the above action has been taken by signing below and returning this memorandum to K. Dunlap,3313 DAEC Rd, Emergency Planning, PSC, Palo, IA 52324

)

PLEASE RETURN WITlilN 20 DAYS.

I have made the above revisions as indicated.

Print Name Signature /Date

4 Section H Revision 20 February 1999 l

The changes made to Section H of the DAEC Emergency Plan do not decrease the effectiveness of the plan as defined by Title 10, CFR Part 50.54(q), and thus do not require NRC prior approval.

This Section H has been reviewed and approved by the Emergency Planning Department via EP-PWR 99003 and by DAEC Site Management as follows:

d d'11' ? 7 APPROVED: I Manager, Emergency Planning Date REVIEWED:

'.+

oc -9s -os z 3-8-97 Operations Cbmmittee Chairman Date i

REVIEWED:

M 7-/p///

/ Date

(~/}

Manager, Regufatory Performance N

APPROVED:

au/

3 7'/

Date Plant [anager-Ndclear AUTHORIZATION APPROVED:

M 3/6/77 Vice/ resident - Nu6 lear

'Date O