NG-89-2589, Forwards Proposed Operator Licensing Exam Schedule Format Estimating Number of Candidates to Be Examined & Dates for Scheduled Requalification Exams

From kanterella
Jump to navigation Jump to search
Forwards Proposed Operator Licensing Exam Schedule Format Estimating Number of Candidates to Be Examined & Dates for Scheduled Requalification Exams
ML20247A904
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/29/1989
From: Mineck D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Perkins K
Office of Nuclear Reactor Regulation
References
GL-89-03, GL-89-12, GL-89-3, NG-89-2589, NUDOCS 8909120243
Download: ML20247A904 (3)


Text

- - _ __ _ _ _ _

b.y 4

c. .

L l

Iowa Electric Light and Power Company f

NG-89-25h9 August 29,1989 Mr. Kenneth II. Perkins, Jr.

Chief, Operator I,icensing liranch OWFN-10D-18 US Nuclear P.egulatory commission Washington, DC 20555 SU!UliCT: Duane Arnold linergy Center Docket No. 50-331 Op.1.icense DPR-49 Operator 1 icensing lixaminations (Generic l etter 89-12)

Dear Mr. Perkins:

The purpose of this letter is to respond to Generic Letter 89-12 by providing our best estimate (I!nclosme 1) of the anticipated number of candidates to be cumined during  ;

cuch site visit assigned to us by Generic 1.etter 89-03. In addition, we are providing the dates (linclosure 2) for our scheduled requalification examinations during the same time period.

If you have any questions or need additional information, please feel free to contact Mr.

17r ank Van litten, Acting Training Supervisor-Operations, at 319/851 7569.

Sincerely.

y- . hlyn DanicI L Mineck Manager, Nuclear Division linclosme: Operator 1.icensing fixamination Schedule ec:

1 rank Van litten w/a I 1.iu w/o j

I.. Root w/o Commitment Control 890285 NRC1Documenttomrol Desk-(original)

NRC Resident inspc<. tor w/o 1

File: A-10lb. A-117a w'a J.R. Itall w/a #;3 A. liert Davis, Region ill w/a R.W. McGaugby, w/o l I  !

I DLM/M M/db 8909120243 890829 FDR ADOCK 05000331 ,

rDC i

V General Of] ice

  • P.O. Bo.x 351
  • Cedar llapids, Iowa $2406
  • 319!398-4411

j Enclosure i l

' PROPOSED OPERATOR LICt.NSING EXAMINATION SCHEDULE FORM III Facility Duane Arnold Enercy Center NSC N#9100 _ --

FY 1992 FY 1993 FY 1990 FY 1991 (10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/9

1. Assigned Date 12/16/91 12/15/92 12/11/89 12/17/90 (GL85-03) 6 6 6 ,; _
  1. RO 3 3 3 3 fSR0 Instant __

3

  1. SRO Upgrade 3 _

3 _, 3 o 0 0 o

  1. SRO Limited
2. Assigned Date (GL89-03) __
  1. RO fSR0 Instant _ _ _
  1. 5R0 Upgrade _
  1. SRO Limited __

Please indicate initial cold license examinations by placing an asterisk (*) by the dates Please indicate examinations intended to extend an(for operator's license example, if Unit to a second or subsequent unit with two asterisks (**).

1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five RO candidates licensed on Unit 1 are to be examined to extend their licenses to Unit 2, then indicate "R0 3,5**.")

i l

t

  • ~ ' ' Enclosure 2' PROPOSED REQUALIFICATION EXAMINATION SCHEDULE F0PMAT Facility Duane Arnold Enerev Crnter NRC Region HI Planned Simulation Facility Certification / Approval Date 1/1/91 -_

FY 1991 FY 1992 FY 1993 FY 1990 (13/1/89-9/30/90) (10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/$2-9/30/93)

Date 11/3/89 D&te11/09/90 Date 11/08/91 bate 11/6/92 1.

Date 11/10/89 Datell/16/90 Date 11/15/91 Date11/13/92 2.

Date11/30/90 Date 11/22/91 Date11/20/92

3. Date 11/17 /89 Date12 /06/91 Datg12/04/92 4 Date 12 /01/89 Date12 /07 /90
5. Date,12.f3g/89 Date 12 /14 /90 Date12/13/91 Date M /92 Date 12/15/89 Date 12/21/90 Date 12/20/91 Date 12/18/92 I

e 6

j..

j i

I i

l I

l l

i

- - _ _ _ --