ML20214S610
ML20214S610 | |
Person / Time | |
---|---|
Site: | Palisades, Big Rock Point, 05000000 |
Issue date: | 06/03/1987 |
From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | Buckman F CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
References | |
NUDOCS 8706090342 | |
Download: ML20214S610 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18066A6881999-10-19019 October 1999
[Table view]Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20217G4111999-10-12012 October 1999 Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed ML20212L9051999-10-0404 October 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted ML20217C2761999-09-30030 September 1999 Forwards Big Rock Point Plant Annual Rept of Facility Changes,Tests & Experiments,Iaw 10CFR50.59(b)(2).Rept Provides Summary of Changes to Facility Performed Since 981001.No Activities Classified as Tests or Experiments ML20217C5111999-09-30030 September 1999 Forwards Info Re Management & Funding of Irradiated Fuel Notification,Per 10CFR50.54(bb),in Response to NRC Telcon Rai.Revs to Original 990811 Submittal Are Indicated by Redline/Strikeout Method ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210S6291999-08-11011 August 1999 Forwards Notification to NRC for Review & Approval of Program Intending to Manage & Provide Funding for Mgt of All Irradiated Fuel at Big Rock Point Until Title of Fuel Is Transferred to Secretary of Energy for Disposal ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML20210H2701999-07-28028 July 1999 Informs That Big Rock Point Commits to Listed Actions with Regard to 990511 Amend Request to Delete Definition of Site Boundary & Remove Site Map,Based on Discussion with NRC on 990728 ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML20209D6951999-07-0707 July 1999 Ack Receipt of Which Requested That NRC Reconsider Decision to Move NRC Resident Inspector from Big Rock Point Plant.Determined Decision to Be Correct One ML20210L0491999-06-30030 June 1999 Partially Deleted Request for FOIA Documents Re Source of High Alarms Generated by Radiation Effluent Detector or Detectors in Discharge Canal at Big Rock Point on 980314,15 & 25.Partially Deleted Info Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML20209D7011999-06-21021 June 1999 Requests That NRC Reconsider Decision to Move Resident Inspector from Big Rock Point NPP ML20196E1601999-06-21021 June 1999 Forwards Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted.Overall,Reactor Decommissioning Activities Performed Satisfactorily ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML20207F6631999-06-0303 June 1999 Forwards Rev 33 of Big Rock Point Plant Security Plan,Which Incorporates Exemption from Certain Requirements of 10CFR73 That Reflect Permanent Shutdown & Defueled Condition of Facility.Encl Withheld IAW 10CFR73.21(c) ML20195D0371999-06-0303 June 1999 Forwards Revised Defueled Ts,Per 990511 Util Request.Page Format in Attachments 1 & 2 of Submittal Do Not Agree with Current Facility Defueled TS Format.Replacement of Encl Pages Requested ML20207D1151999-05-27027 May 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Reorganization,Division of Licensing Project Management Created ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML20206P4501999-05-11011 May 1999 Requests Transcript of 990413 Public Meeting in Rockville,Md Re Decommissioning of Big Rock ML20206P0921999-05-0707 May 1999 Responds to Discussing Impact That Delays to Wesflex Sys Approval Would Have on Big Rock Point Decommissioning Cost & Schedule ML20206H1011999-05-0404 May 1999 Forwards Safety Evaluation for Exemption from Certain Physical Protection Requirements.Enclosure Contains Safeguards Info & Being Withheld 1999-09-30 Category:NRC TO UTILITY MONTHYEARML20058G8921990-11-0707 November 1990
[Table view]Forwards Insp Repts 50-155/90-20 & 50-255/90-20 on 900925-28 & 1015-19.Violations Noted ML20058G2461990-11-0202 November 1990 Forwards Safety Insp Rept 50-155/90-17 on 900904-1015 & Notice of Violation ML20058F7331990-10-31031 October 1990 Forwards List of Unimplemented Gsis,Per Generic Ltr 90-04 ML20058E7141990-10-30030 October 1990 Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant ML20058A7671990-10-22022 October 1990 Advises That Review of 900816 Response to NRC Bulletin 90-001 Re Loss of Fill Oil in Rosemount Transmitter Ongoing ML20059N0081990-09-28028 September 1990 Forwards Insp Rept 50-155/90-10 on 900723-27 & 0806-10 & Notice of Violation ML20059M2101990-09-25025 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet ML20059L4771990-09-18018 September 1990 Forwards Safety Insp Rept 50-155/90-13 on 900724-0903. Noncited Violation Noted ML20059J3091990-09-10010 September 1990 Forwards Exemption from 10CFR55.45(b)(2)(ii) Re Use of Simulation Facility,Per 900404 Request.Util Request to Delay Submittal of Description of Performance Tests & Results Until 910526 Granted ML20059G5461990-09-0404 September 1990 Discusses 900816 Site Visit Re Const Activities Requiring Security Force Compensatory Measures & Security Plan ML20059F2531990-08-31031 August 1990 Forwards Safety Evaluation Supporting Util 891229 Request to Dispose of Dredged Discharge Canal Sediment from Facility ML20059C6111990-08-27027 August 1990 Forwards Safety Insp Rept 50-155/90-15 on 900814-16.No Violations Noted ML20059B7771990-08-22022 August 1990 Advises That Util Commitment to Install Two New Recorders That Provide Containment Temp Indication on Front Panel During 1990 Refueling Outage,Acceptable ML20056B5191990-08-17017 August 1990 Forwards Final SALP Rept 50-155/90-01 & Revised Pages to SALP Rept.Overall Performance Did Not Decline,Per 900716 Meeting.Nrc Overstated Concern W/Radiological Controls Functional Area in Initial Rept & Cover Ltr ML20059A7571990-08-16016 August 1990 Advises That Response to Bulletin 90-001, Transmitters Mfg by Rosemount, Complete,Per ML20059A1741990-08-16016 August 1990 Informs That NRC NDE Mobile Lab Will Conduct Independent NDE Exams at Plant on 900924-1005.Selected Sys for Exam Listed on Encl ML20059A1661990-08-16016 August 1990 Forwards Safety Insp Rept 50-155/90-14 on 900730-0803.No Violations Noted ML20059A3721990-08-14014 August 1990 Ack Receipt of Informing NRC of Change in Completion Date Re on-the-job Training Procedure,Per LER 90-002 ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20058N2211990-08-0707 August 1990 Forwards Safety Insp Rept 50-155/90-12 on 900612-0723.No Violations Noted ML20056A4981990-08-0101 August 1990 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls ML20055J4351990-07-23023 July 1990 Ack Receipt of 900702 Transmittal of Rev 26 to Physical Security Plan.Estimated Start & Completion Dates for Each Mod Project & Compensatory Measures Requested within 30 Days After Receipt of Ltr ML20055G7301990-07-20020 July 1990 Requests Util Provide Ref Matls Listed in Encl for Requalification Program Evaluation on 901018 & Wk of 901105 ML20055G2881990-07-16016 July 1990 Advises of fitness-for-duty Insp Scheduled for Wk of 900925- 28 at Plant.Written Policies & Procedures Will Be Reviewed as Part of Insp Process ML20055G5051990-07-11011 July 1990 Advises That 900511 Rev 95 to Chapters 2,5,6,7,8 & Apps D, M & P for Plant Emergency Plan Consistent w/10CFR50.54(q) & Acceptable.Position of on-call Technical Adviser Should Be Inserted in Table 1 of Chapter 5 ML20055F2271990-07-0606 July 1990 Forwards Physical Security Insp Rept 50-255/90-16 on 900618- 22 & 25.No Violations Identified ML20055F1661990-07-0606 July 1990 Forwards Initial SALP Rept 50-155/90-01 for Jan 1989 - Apr 1990,prior to 900716 Scheduled Meeting.Two Areas of Improvement & No Areas of Decline Identified Since Last SALP Rept ML20055D7011990-07-0202 July 1990 Confirms Plans Re 900716 Meeting W/Util in Charlevoix,Mi to Present Initial SALP 9 Rept for Plant ML20055D1791990-06-28028 June 1990 Forwards Safety Insp Rept 50-155/90-11 on 900501-0611.No Violations Noted ML20059M9181990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) IR 05000255/19890211989-09-27027 September 1989 Forwards Safety Insp Rept 50-255/89-21 on 890718-0831.No Violations Noted ML20248C9321989-09-26026 September 1989 Advises That 890823 Rev 23 to Security Plan Meets Provisions of 10CFR50.54(p) & Acceptable.Encl Withheld (Ref 10CFR73.21) ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248A5351989-09-19019 September 1989 Forwards Safety Insp Rept 50-155/89-15 on 890725-0905.No Violations Noted.Unresolved Items Noted Re Compliance W/ Requirements of 10CFR50,App J for Reduced Pressure Testing ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM ML20247D3541989-09-0606 September 1989 Forwards Environ Assessment & Finding of No Significant Impact Re Tech Spec Change to Delete Section 6.4.2(d) on Calibr of Portable Neutron or Gamma dose-rate Measuring Instruments IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246D2191989-08-16016 August 1989 Forwards Amend 100 to License DPR-6 & Safety Evaluation. Amend Revises Tech Specs by Providing for New Organizational Unit Entitled Nuclear Safety Svcs Dept to Discharge Offsite Safety Review Functions Instead of Nuclear Safety Board ML20246C3941989-08-15015 August 1989 Forwards Safeguards Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14.No Violations Noted ML20245K0581989-08-14014 August 1989 Forwards Safety Insp Rept 50-155/89-14 on 890710-0801 & Notice of Violation ML20246C8211989-08-11011 August 1989 Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl ML20245G5131989-08-10010 August 1989 Forwards SER Accepting Util Response to Generic Ltr 83-28, Item 4.5.3 Re Reactor Trip Reliability on-line Functional Testing of Reactor Trip Sys ML20245G1981989-08-10010 August 1989 Forwards Environ Assessment & Finding of No Significant Impact Re 880922 Application & 890117 & 0412 Ltr Suppls, Requesting Changes to Tech Specs to Allow Independent Review & Audit Functions Be Accomplished by Independent Unit ML20248D6921989-08-0404 August 1989 Advises That Rev 6b to Generating Stations Emergency Plan Transmitted by Util 890710 Form Acceptable & Does Not Decrease Effectiveness of Plan ML20248C0561989-08-0303 August 1989 Forwards Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants.Nrc Requested to Be Notified Upon Completion of Human Factors Review ML20245H5331989-08-0202 August 1989 Advises That 890519 Changes to QA Program Described in CPC-2A Acceptable.Issues Addressed Listed 1990-09-04 Category:OUTGOING CORRESPONDENCE MONTHYEARML20212L9051999-10-0404 October 1999
[Table view]Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML20209D6951999-07-0707 July 1999 Ack Receipt of Which Requested That NRC Reconsider Decision to Move NRC Resident Inspector from Big Rock Point Plant.Determined Decision to Be Correct One ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20196E1601999-06-21021 June 1999 Forwards Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted.Overall,Reactor Decommissioning Activities Performed Satisfactorily ML20207D1151999-05-27027 May 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Reorganization,Division of Licensing Project Management Created ML20206P0921999-05-0707 May 1999 Responds to Discussing Impact That Delays to Wesflex Sys Approval Would Have on Big Rock Point Decommissioning Cost & Schedule ML20206H1011999-05-0404 May 1999 Forwards Safety Evaluation for Exemption from Certain Physical Protection Requirements.Enclosure Contains Safeguards Info & Being Withheld ML20206E3721999-04-29029 April 1999 Informs That Based on Licensee Determinations That Changes in Rev 1 Do Not Decrease Effectiveness of Defueled EP & That Plan Continues to Meet Applicable Stds of 10CFR50.47(b) & Requirements of App E to Part 50,NRC Approval Not Required ML20206B7381999-04-26026 April 1999 Forwards Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted.Activities in Areas of Facility Mgt & Control,Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined ML20205E3471999-03-29029 March 1999 Informs That USNRC Granted Encl Exemption from Certain Requirements of 10CFR73,to Allow Implementation of Safeguards Contingency Plan Reflecting Permanent Shutdown & Defueled Condition of Brpnp in Response to ML20204F4611999-03-19019 March 1999 Forwards Insp Rept 50-155/99-01 on 990113-0225.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203C8971999-02-0808 February 1999 Informs That NRR Contracted with PNNL to Evaluate Storage of Spent Fuel at Number of Decomissioning Nuclear Power Facilities.Forwards Request for Info Re Spent Fuel Storage at Big Rock NPP ML20199H2431999-01-15015 January 1999 Forwards Insp Rept 50-155/98-09 on 981201-990112 & Nov.One Weakness Identified Re Event Involving Ungrappling Fuel Bundle Without Being Fully Seated in Rack & Without Independent Verification That Ungrappling Bundle Was Proper ML20199D9711999-01-13013 January 1999 Forwards Plant Defueled TS Administrative Replacement Pp.On 990104 Staff Informed NRC That Pp Numbering for Table of Contents Was Incorrect.Subj Pp Requested to Be Replaced with Encl ML20199E0781999-01-13013 January 1999 Informs That Staff Has Received Request for Exemption from Various 10CFR73 Pyhsical Protection Requirements Dated 981112.Exemption Request Improperly Based on Requirements of 10CFR50.12 Instead of Applicable Requirements of 10CFR73.5 ML20199E1841999-01-13013 January 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Proposed Exemption from Certain Physical Protection Requirements of 10CFR73.Assessment Forwarded for Fr Publication ML20198K6551998-12-24024 December 1998 Forwards Amend 120 to License DPR-6 & Safety Evaluation. Amend Changes License DPR-6 & App A,Ts to Reflect Permanently Shutdown & Defueled Status of Plant ML20196H3171998-12-0303 December 1998 Forwards Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted.Inspection Covered Activities in Areas of Radiological Safety ML20155J1471998-11-0303 November 1998 Informs That on 981007,NRC Administered GFE Section of Written Operator Licensing Exam to Employees of Facility. Exam Answer Key for Forms a & B,Grading Results & Individual Answer Sheets Encl.Without Encl ML20155A2311998-10-16016 October 1998 Ltr Contract:Mod 4 to Task Order 1 Entitled, Technical Assistance in Review of Cask Unloading Procedures for Palisades Plant (VSC-24 Cask) Under Contract NRC-02-95-003 ML20154M2211998-10-14014 October 1998 Forwards Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted.Insp Consisted of Examination of Activities in Areas of Facility Mgt & Control,Decommissioning Support (Including Physical Security),Sf Safety & Radiological Safety ML20154E0121998-09-30030 September 1998 Forwards Exemption from 10CFR50.54(q) Re Plant & Suppls ,1120& 980302,0429 & 0828 Which Requested Exemption from Certain Protions of 10CFR50.47(b) & App E to 10CFR50 to Allow Brpnp to Discontinue Offsite EP Activities ML20154A9651998-09-25025 September 1998 Forwards SE Re Licensee 950523 Submittal of Rept Which Summarizes Results of USI A-46 Implementation Program, Established in Response to Suppl 1 to NRC GL 87-02 Through 10CFR50.54(f) Ltr ML20155A5521998-09-18018 September 1998 Forwards Insp Rept 50-255/98-15 on 980702-0821.No Violations Noted.Operating Crew Demonstrated Positive Command & Control While Implementing Emergency Operating Procedures in Response to Inadvertent Main Feedwater Pump Trip ML20239A2491998-09-0303 September 1998 Forwards Insp Rept 50-155/98-06 on 980716-0826.No Violations Noted.Overall,Reactor Decommissioning Activities Were Generally Performed Satisfactorily & as Planned.Potential Weaknesses Were Identified in Review of SE Procedure ML20237E2731998-08-25025 August 1998 Discusses NRC Insp Rept 50-155/98-03 on 980527.Violations Noted.Insp Findings Documented in NRC Insp Rept Sent to Util by Ltr ML20237C5461998-08-19019 August 1998 Refers to Revs 133,134 & 135 to Portions of Big Rock Point Plant Emergency Plan.Based on Determinations That Changes in Revs 133-135 Do Not Decrease Effectiveness of Emergency Plan,Nrc Approval Not Required ML20237B4571998-08-13013 August 1998 Ack Receipt of ,Which Transmitted Changes Identified as Rev 41 to Palisades Physical Security Plan, Submitted Under Provisions of 10CFR50.54.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld ML20236Y0441998-08-0505 August 1998 Forwards Summary of Decommissioning Insp Plan Through March 1999.Plan Will Be Updated Approx Twice Each Yr & May Be Revised at Any Time Based on Future Insp Findings,Events & Resource Availability IR 05000255/19980101998-07-30030 July 1998 Forwards Insp Rept 50-255/98-10 on 980507-0701 & Notice of Violation ML20236V0651998-07-28028 July 1998 Ack Receipt of 980605 Request for Withdrawal of 980325 Request for License Amend for DPR-6,paragraph 2.C.(5), Physical Protection & Closes TAC MA0756 ML20236U4311998-07-24024 July 1998 Forwards Insp Rept 50-155/98-05 on 980528-0715.No Violations Noted.Nrc Concern That Programmatic Assessments of RPP Were Not Initiated Following Identification of Multiple Deficiencies in RP Program During First Half of 1998 ML20236T6231998-07-22022 July 1998 First & Final Response to FOIA Request for Records.Records in App a Being Made Available in PDR & Encl.Records in App B Partially Withheld Per Exemption 6 IR 05000155/19980041998-07-0808 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-155/98-04 ML20236M4131998-07-0707 July 1998 Ack Receipt of Ltr Dtd 980512,transmitting Changes Identified as Rev 14 to Big Rock Point Security Suitability, Training & Qualification Plan.No NRC Approval Required ML20236K8271998-06-30030 June 1998 First Partial Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl ML20249C4391998-06-25025 June 1998 Ack Receipt of ,Which Transmitted Changes to Rev 14 to Suitability,Training & Qualification Plan,Submitted Under Provisions 10CFR50.54(p) ML20249C3291998-06-23023 June 1998 Ltr Contract,Task Order 007, Palisades Engineering & Technical Support Inspection, Under Contract NRC-03-98-021 ML20249B3041998-06-16016 June 1998 Forwards Insp Rept 50-155/98-03 on 980407-0527.Violation Noted & Being Considered for Escalated Enforcement Action. Notice of Violation Not Presently Being Issued for Insp Finding ML20248C0971998-05-28028 May 1998 Forwards Partially Withheld Insp Rept 50-255/98-08 on 980504-08 (Ref 10CFR73.71).No Violations Noted.Insp Effort to Determine Whether Activities Authorized by Licensee Conducted Safely & in Accordance W/Nrc Requirements ML20248F3541998-05-28028 May 1998 Responds to to P Harris Which Requested That NRC Retain Resident Inspector at Big Rock Site to Monitor Project for Period of Five Years.Informs That NRC Intends to Assign Inspector to Site for One Year ML20247P6361998-05-27027 May 1998 Ack Receipt of & Fee in Listed Amount Received on 980427,in Payment for Civil Penalty Proposed by NRC in Ltr .Corrective Actions Will Be Examined During Future Insp ML20248B3981998-05-26026 May 1998 Ltr Contract:Task Order 231, Review Palisades Conversion of TS to Improved TS Based on Std TS, to Contract NRC-03-95-026 1999-09-30 |
Text
t/
^ D Fl3 JUN 0 31981 Docket No. 50-155 Docket No. 50-255 Consumers Power Company ATTN: Dr. F. W. Buckman Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:
On May 19, 1987, NRC Region III received an allegation concerning an alleged past conviction for distribution and possession of a controlled substance by an employee allegedly granted unescorted access to the Big Rock Point and Palisades Nuclear Power Plants. The attachment to this letter contains a description of the allegation and the identity of the person. The contents of the attachment to this letter was discussed with Mr. H. Cooper of your staff on May 19, 1987.
The attachment to this letter should be strictly controlled and distribution limited to personnel only with a "need-to-know" to protect the personal privacy of the individual while your investigation is in progress. The attachment is considered as exempt from public disclosure in accordance with Title 10, Code of Federal Regulations, Part 2.790(a).
NRC Region III requests the Consumers Power Company (CPCo) to analyze the allegation, initiate the appropriate investigation, and take appropriate action as necessary in order to address the specific allegation and potential consequences of the allegation, if substantiated. Due to the nature of the allegation, coordination with local law enforcement agencies may be appropriate.
We further request that the results of your review and disposition of this matter be submitted to NRC Region III after completion. Documentation supporting your results should be maintained for any further inspection by NRC Region III.
C p
4 1
i 0 t
6090342 870603 5 C CLOSUn2 CONTAT O ADOCK 0500 10CFIC.790 INF05%TIor P IJPON SEPAMTION THIb,
, PACE IS DECNTROLLED
,o -
Consumers Power Company 2 JUN 0 31987 Your cooperation with us is appreciated. Should you have any questions with regard to this matter, please contact me or Mr. J. R. Creed (312) 790-5643.
Sincerely, e40/~f ck A. Hind, Director
, ivision of Radiation Safety and Safeguards
Attachment:
As stated (PART 2.790(a) INFORMATION) cc w/ attachment:
Mr. Kenneth W. Berry, Director Nuclear Licensing D. P. Hoffman, Plant Superintendent J. F. Fir 11t, General Manager cc w/o attachment, PART 2.790(a)
INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspectoi, RIII Ronald Callen, Michigan Public Service Commission Nuclear Facilities and l Environmental Monitoring
! Section i
8 e5 C$b RI III RIII LI II fI" PFrtle/mnj d A on gess Jac tw b- "
gg"
,yrl67 g///r7 6/etB7 6f f7 asyne.Tso IvrounTIon lUygggpABAT105THI PAGE IS W
. _-____ . . - - - . .